| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - CECIL D. GASSIOTT LLC |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - MCMANUS CONSTRUCTION, INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
81,000.00 |
81,000.00 |
10,000.00 |
10,000.00 |
50,000.00 |
50,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
50,000.00 |
50,000.00 |
10,000.00 |
10,000.00 |
50,000.00 |
50,000.00 |
|
|
| 202-02-A-01 |
removal of bridge (sta. 10+00.00, 48'x 34' concrete)
|
1   |
EACH |
100,000.00 |
100,000.00 |
50,000.00 |
50,000.00 |
68,750.00 |
68,750.00 |
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
5,237   |
SQYD |
20.00 |
104,740.00 |
11.00 |
57,607.00 |
22.00 |
115,214.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
1,053   |
SQYD |
20.00 |
21,060.00 |
14.00 |
14,742.00 |
18.00 |
18,954.00 |
|
|
| 202-02-F |
removal of concrete combination curb & gutter
|
346.0 |
LNFT |
20.00 |
6,920.00 |
13.50 |
4,671.00 |
20.00 |
6,920.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
1,793.2 |
SQYD |
20.00 |
35,864.00 |
8.00 |
14,345.60 |
20.00 |
35,864.00 |
|
|
| 202-02-H |
removal of guard rail
|
75   |
LNFT |
20.00 |
1,500.00 |
20.00 |
1,500.00 |
25.00 |
1,875.00 |
|
|
| 202-02-I |
removal of portland cement concrete pavement (channel)
|
613   |
SQYD |
23.00 |
14,099.00 |
12.00 |
7,356.00 |
50.00 |
30,650.00 |
|
|
| 203-01 |
general excavation
|
455   |
CUYD |
30.00 |
13,650.00 |
20.00 |
9,100.00 |
25.00 |
11,375.00 |
|
|
| 203-03 |
embankment
|
522   |
CUYD |
30.00 |
15,660.00 |
17.00 |
8,874.00 |
35.00 |
18,270.00 |
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
75,000.00 |
75,000.00 |
50,000.00 |
50,000.00 |
80,000.00 |
80,000.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
272   |
EACH |
15.00 |
4,080.00 |
15.00 |
4,080.00 |
20.00 |
5,440.00 |
|
|
| 204-06 |
temporary silt fencing
|
752   |
LNFT |
5.00 |
3,760.00 |
2.00 |
1,504.00 |
5.00 |
3,760.00 |
|
|
| 302-02-C |
class ii base course (8" thick)
|
7,251.2 |
SQYD |
20.00 |
145,024.00 |
31.00 |
224,787.20 |
23.00 |
166,777.60 |
|
|
| 305-01-B-01 |
subgrade layer (8" thick)(soil cement 8% by volume)
|
3,515   |
SQYD |
9.00 |
31,635.00 |
31.00 |
108,965.00 |
15.00 |
52,725.00 |
|
|
| 305-01-B-02 |
subgrade layer (8" thick)(lime treatment type d 15% by
volume) |
3,515   |
SQYD |
9.00 |
31,635.00 |
31.00 |
108,965.00 |
12.00 |
42,180.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
500.0 |
CUYD |
95.00 |
47,500.00 |
100.00 |
50,000.00 |
120.00 |
60,000.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
12.3 |
TON |
250.00 |
3,075.00 |
250.00 |
3,075.00 |
400.00 |
4,920.00 |
|
|
| 510-02 |
pavement widening
|
12.0 |
SQYD |
300.00 |
3,600.00 |
198.00 |
2,376.00 |
400.00 |
4,800.00 |
|
|
| 601-01-G |
portland cement concrete pavement (8" thick)
|
5,552.5 |
SQYD |
46.27 |
256,914.18 |
80.00 |
444,200.00 |
72.00 |
399,780.00 |
|
|
| 601-01-O |
portland cement concrete pavement (12" thick)
|
176.8 |
SQYD |
70.00 |
12,376.00 |
125.00 |
22,100.00 |
120.00 |
21,216.00 |
|
|
| 601-02-G |
portland cement concrete pavement (8" thick)
(crossovers & turnouts) |
1,125.2 |
SQYD |
46.27 |
52,063.00 |
125.00 |
140,650.00 |
92.00 |
103,518.40 |
|
|
| 602-05-G-01 |
full depth patching of jointed conc pvmt (8" thick)
(16.0 sq yds & under) |
14.7 |
SQYD |
50.00 |
735.00 |
400.00 |
5,880.00 |
400.00 |
5,880.00 |
|
|
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
1,105   |
LNFT |
35.00 |
38,675.00 |
76.00 |
83,980.00 |
76.00 |
83,980.00 |
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
425   |
LNFT |
40.00 |
17,000.00 |
85.00 |
36,125.00 |
88.00 |
37,400.00 |
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
136   |
LNFT |
50.00 |
6,800.00 |
145.00 |
19,720.00 |
110.00 |
14,960.00 |
|
|
| 701-04-A |
storm drain pipe arch (15" equiv. rcpa)
|
125   |
LNFT |
40.00 |
5,000.00 |
76.00 |
9,500.00 |
92.00 |
11,500.00 |
|
|
| 701-04-B |
storm drain pipe arch (18" equiv. rcpa)
|
96   |
LNFT |
50.00 |
4,800.00 |
125.00 |
12,000.00 |
100.00 |
9,600.00 |
|
|
| 701-04-D |
storm drain pipe arch (24" equiv. rcpa)
|
126   |
LNFT |
55.00 |
6,930.00 |
130.00 |
16,380.00 |
125.00 |
15,750.00 |
|
|
| 701-04-F |
storm drain pipe arch (36" equiv. rcpa)
|
36   |
LNFT |
75.00 |
2,700.00 |
175.00 |
6,300.00 |
230.00 |
8,280.00 |
|
|
| 702-02-A |
manholes (mh-06)
|
10   |
EACH |
5,000.00 |
50,000.00 |
3,000.00 |
30,000.00 |
5,500.00 |
55,000.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
9   |
EACH |
5,000.00 |
45,000.00 |
3,000.00 |
27,000.00 |
3,500.00 |
31,500.00 |
|
|
| 702-03-C |
catch basins (cb-06)
|
18   |
EACH |
5,500.00 |
99,000.00 |
6,500.00 |
117,000.00 |
4,000.00 |
72,000.00 |
|
|
| 702-03-D |
catch basins (cb-07)
|
8   |
EACH |
6,000.00 |
48,000.00 |
7,500.00 |
60,000.00 |
6,000.00 |
48,000.00 |
|
|
| 702-03-F |
catch basins (cb-08)
|
8   |
EACH |
6,000.00 |
48,000.00 |
9,000.00 |
72,000.00 |
7,500.00 |
60,000.00 |
|
|
| 702-03-G |
catch basins (cb-09)
|
14   |
EACH |
6,000.00 |
84,000.00 |
10,000.00 |
140,000.00 |
6,500.00 |
91,000.00 |
|
|
| 702-04-A |
adjusting manholes
|
5   |
EACH |
6,000.00 |
30,000.00 |
1,500.00 |
7,500.00 |
1,200.00 |
6,000.00 |
|
|
| 702-04-D |
adjusting water valves
|
12   |
EACH |
100.00 |
1,200.00 |
250.00 |
3,000.00 |
400.00 |
4,800.00 |
|
|
| 703-03 |
perforated pipe underdrains
|
4,111   |
LNFT |
17.50 |
71,942.50 |
15.00 |
61,665.00 |
30.00 |
123,330.00 |
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
2   |
EACH |
4,500.00 |
9,000.00 |
2,500.00 |
5,000.00 |
4,000.00 |
8,000.00 |
|
|
| 705-06-C |
chain link fence (6-foot height)
|
25   |
LNFT |
90.00 |
2,250.00 |
50.00 |
1,250.00 |
200.00 |
5,000.00 |
|
|
| 705-08-C |
12.5-foot double gates for chain link fence (6-foot
height) |
1   |
DBGT |
2,500.00 |
2,500.00 |
1,800.00 |
1,800.00 |
600.00 |
600.00 |
|
|
| 706-01-A |
concrete walk (4" thick)
|
956.3 |
SQYD |
60.00 |
57,378.00 |
60.00 |
57,378.00 |
52.00 |
49,727.60 |
|
|
| 706-02-C |
concrete drive (6" thick)
|
1,063.2 |
SQYD |
65.00 |
69,108.00 |
66.00 |
70,171.20 |
72.00 |
76,550.40 |
|
|
| 706-04 |
handicapped curb ramps
|
12.0 |
EACH |
2,000.00 |
24,000.00 |
350.00 |
4,200.00 |
1,500.00 |
18,000.00 |
|
|
| 707-01 |
concrete curb
|
4,144.3 |
LNFT |
5.25 |
21,757.58 |
10.00 |
41,443.00 |
12.00 |
49,731.60 |
|
|
| 712-01-C |
concrete cast-in-place revetment (6" thick)
|
480   |
SQYD |
75.00 |
36,000.00 |
100.00 |
48,000.00 |
82.00 |
39,360.00 |
|
|
| 712-01-D |
concrete cast-in-place revetment (8" thick)
|
133   |
SQYD |
90.00 |
11,970.00 |
135.00 |
17,955.00 |
92.00 |
12,236.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
50,000.00 |
50,000.00 |
100,000.00 |
100,000.00 |
125,000.00 |
125,000.00 |
|
|
| 714-01 |
sodding
|
913   |
SQYD |
7.50 |
6,847.50 |
3.00 |
2,739.00 |
6.00 |
5,478.00 |
|
|
| 726-01-A |
bedding material (granular storm drain pipe backfill)
|
25.0 |
CUYD |
100.00 |
2,500.00 |
92.00 |
2,300.00 |
130.00 |
3,250.00 |
|
|
| 726-01-B |
bedding material (stone)
|
52.0 |
CUYD |
100.00 |
5,200.00 |
100.00 |
5,200.00 |
130.00 |
6,760.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
150,000.00 |
150,000.00 |
350,000.00 |
350,000.00 |
300,000.00 |
300,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
5   |
EACH |
100.00 |
500.00 |
75.00 |
375.00 |
300.00 |
1,500.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
54   |
EACH |
10.00 |
540.00 |
5.00 |
270.00 |
9.00 |
486.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
110   |
LNFT |
7.50 |
825.00 |
5.00 |
550.00 |
6.00 |
660.00 |
|
|
| 732-02-A-03 |
plastic pvmt striping(solid line)(4" width)hot appl
thermo (40mil thickness) |
1.465 |
MILE |
3,000.00 |
4,395.00 |
2,500.00 |
3,662.50 |
3,000.00 |
4,395.00 |
|
|
| 732-03-A-03 |
plastic pvmt striping(broken line)(4" width) hot appl
thermo (40 mil thickness) |
0.022 |
MILE |
1,000.00 |
22.00 |
820.00 |
18.04 |
3,000.00 |
66.00 |
|
|
| 735-01 |
mailboxes
|
33   |
EACH |
25.00 |
825.00 |
1.25 |
41.25 |
300.00 |
9,900.00 |
|
|
| 735-02 |
mailbox supports (single)
|
33   |
EACH |
125.00 |
4,125.00 |
100.00 |
3,300.00 |
300.00 |
9,900.00 |
|
|
| 739-01 |
hydro-seeding
|
0.92 |
ACRE |
2,500.00 |
2,300.00 |
2,200.00 |
2,024.00 |
4,800.00 |
4,416.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
100,000.00 |
100,000.00 |
40,000.00 |
40,000.00 |
150,000.00 |
150,000.00 |
|
|
| 742-01-A |
sanitary sewer pipe (8"sdr-26 pvc)
|
20   |
LNFT |
50.00 |
1,000.00 |
100.00 |
2,000.00 |
100.00 |
2,000.00 |
|
|
| 742-01-B |
sanitary sewer pipe (8" ductile iron with ceramic
lining) |
155   |
LNFT |
132.00 |
20,460.00 |
150.00 |
23,250.00 |
150.00 |
23,250.00 |
|
|
| 805-06 |
class r concrete
|
50.00 |
CUYD |
250.00 |
12,500.00 |
275.00 |
13,750.00 |
120.00 |
6,000.00 |
|
|
| 807-08 |
structural metalwork
|
lump |
LUMP |
2,500.00 |
2,500.00 |
4,500.00 |
4,500.00 |
12,347.50 |
12,347.50 |
|
|
| 810-01 |
concrete railing (barrier)
|
230.00 |
LNFT |
50.00 |
11,500.00 |
330.00 |
75,900.00 |
148.50 |
34,155.00 |
|
|
| 813-01 |
concrete approach slabs
|
255.10 |
SQYD |
275.00 |
70,152.50 |
300.00 |
76,530.00 |
253.00 |
64,540.30 |
|
|
| 814-01-C |
drilled shaft (30")
|
592.0 |
LNFT |
200.00 |
118,400.00 |
425.00 |
251,600.00 |
313.00 |
185,296.00 |
|
|
| S-001 |
dewatering
|
lump |
LUMP |
25,000.00 |
25,000.00 |
5,500.00 |
5,500.00 |
110,000.00 |
110,000.00 |
|
|
| S-002 |
geotextile drainage net composite
|
480   |
SQYD |
16.00 |
7,680.00 |
8.00 |
3,840.00 |
7.00 |
3,360.00 |
|
|
| S-003 |
slope revetement footing
|
150   |
LNFT |
20.00 |
3,000.00 |
90.00 |
13,500.00 |
33.00 |
4,950.00 |
|
|
| S-004 |
saw cutting pavement
|
5,842   |
INFT |
8.00 |
46,736.00 |
2.50 |
14,605.00 |
1.50 |
8,763.00 |
|
|
| S-005 |
tie-in of existing storm drain pipe
|
8   |
EACH |
4,000.00 |
32,000.00 |
2,000.00 |
16,000.00 |
2,000.00 |
16,000.00 |
|
|
| S-006 |
removal and replacement of existing water main (6"
ductile iron) |
lump |
LUMP |
15,000.00 |
15,000.00 |
2,500.00 |
2,500.00 |
10,000.00 |
10,000.00 |
|
|
| S-007 |
sanitary sewer manhole
|
1   |
EACH |
5,000.00 |
5,000.00 |
3,500.00 |
3,500.00 |
2,500.00 |
2,500.00 |
|
|
| S-008 |
tie-in proposed sanitary sewer main into existing
sanitary sewer manhole |
2   |
EACH |
1,500.00 |
3,000.00 |
2,500.00 |
5,000.00 |
5,000.00 |
10,000.00 |
|
|
| S-101 |
precast concrete bridge
|
lump |
LUMP |
400,000.00 |
400,000.00 |
220,000.00 |
220,000.00 |
580,050.00 |
580,050.00 |
|
|
| S-102 |
coating for pedestrian guardrail
|
lump |
LUMP |
5,000.00 |
5,000.00 |
3,000.00 |
3,000.00 |
3,000.00 |
3,000.00 |
|
|
| S-103 |
flexible post delineators
|
5   |
EACH |
150.00 |
750.00 |
60.00 |
300.00 |
300.00 |
1,500.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,012,659.26 |
|
3,549,899.79 |
|
3,990,697.40 |
|
|
|