Letting of 11/12/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 742-10-0122
Parish: CALCASIEU
Routes:
Description: LOGAN STEET (PICARD RD - IRWIN ST)
Type Const: grading, drainage structure, lime treatment, class ii base course, portland cement
concrete pavement, precast slab span bridge, and related work.
Estimated Construction Cost: $2,648,960.05
 
RankLicenseBidderConstruction Bid
1 01012 CECIL D. GASSIOTT LLC $3,012,659.26
2 12312 GILCHRIST CONSTRUCTION CO. LLC $3,549,899.79
3 14648 MCMANUS CONSTRUCTION, INC. $3,990,697.40
 
Item Number Item Description Quantity Unit of Measure - 1 -
CECIL D. GASSIOTT LLC
- 2 -
GILCHRIST CONSTRUCTION CO. LLC
- 3 -
MCMANUS CONSTRUCTION, INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 81,000.00 81,000.00 10,000.00 10,000.00 50,000.00 50,000.00    
202-01 removal of structures & obstructions lump      LUMP 50,000.00 50,000.00 10,000.00 10,000.00 50,000.00 50,000.00    
202-02-A-01 removal of bridge (sta. 10+00.00, 48'x 34' concrete) 1      EACH 100,000.00 100,000.00 50,000.00 50,000.00 68,750.00 68,750.00    
202-02-C removal of portland cement concrete pavement 5,237      SQYD 20.00 104,740.00 11.00 57,607.00 22.00 115,214.00    
202-02-D removal of concrete walks & drives 1,053      SQYD 20.00 21,060.00 14.00 14,742.00 18.00 18,954.00    
202-02-F removal of concrete combination curb & gutter 346.0    LNFT 20.00 6,920.00 13.50 4,671.00 20.00 6,920.00    
202-02-G removal of surfacing & stabilized base 1,793.2    SQYD 20.00 35,864.00 8.00 14,345.60 20.00 35,864.00    
202-02-H removal of guard rail 75      LNFT 20.00 1,500.00 20.00 1,500.00 25.00 1,875.00    
202-02-I removal of portland cement concrete pavement (channel) 613      SQYD 23.00 14,099.00 12.00 7,356.00 50.00 30,650.00    
203-01 general excavation 455      CUYD 30.00 13,650.00 20.00 9,100.00 25.00 11,375.00    
203-03 embankment 522      CUYD 30.00 15,660.00 17.00 8,874.00 35.00 18,270.00    
203-05 excavation and embankment lump      LUMP 75,000.00 75,000.00 50,000.00 50,000.00 80,000.00 80,000.00    
204-02 temporary hay or straw bales 272      EACH 15.00 4,080.00 15.00 4,080.00 20.00 5,440.00    
204-06 temporary silt fencing 752      LNFT 5.00 3,760.00 2.00 1,504.00 5.00 3,760.00    
302-02-C class ii base course (8" thick) 7,251.2    SQYD 20.00 145,024.00 31.00 224,787.20 23.00 166,777.60    
305-01-B-01 subgrade layer (8" thick)(soil cement 8% by volume) 3,515      SQYD 9.00 31,635.00 31.00 108,965.00 15.00 52,725.00    
305-01-B-02 subgrade layer (8" thick)(lime treatment type d 15% by
volume)
3,515      SQYD 9.00 31,635.00 31.00 108,965.00 12.00 42,180.00    
402-01 traffic maintenance aggregate (vehicular measurement) 500.0    CUYD 95.00 47,500.00 100.00 50,000.00 120.00 60,000.00    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
12.3    TON 250.00 3,075.00 250.00 3,075.00 400.00 4,920.00    
510-02 pavement widening 12.0    SQYD 300.00 3,600.00 198.00 2,376.00 400.00 4,800.00    
601-01-G portland cement concrete pavement (8" thick) 5,552.5    SQYD 46.27 256,914.18 80.00 444,200.00 72.00 399,780.00    
601-01-O portland cement concrete pavement (12" thick) 176.8    SQYD 70.00 12,376.00 125.00 22,100.00 120.00 21,216.00    
601-02-G portland cement concrete pavement (8" thick)
(crossovers & turnouts)
1,125.2    SQYD 46.27 52,063.00 125.00 140,650.00 92.00 103,518.40    
602-05-G-01 full depth patching of jointed conc pvmt (8" thick)
(16.0 sq yds & under)
14.7    SQYD 50.00 735.00 400.00 5,880.00 400.00 5,880.00    
701-03-F storm drain pipe (15" rcp/pcp) 1,105      LNFT 35.00 38,675.00 76.00 83,980.00 76.00 83,980.00    
701-03-G storm drain pipe (18" rcp/pcp) 425      LNFT 40.00 17,000.00 85.00 36,125.00 88.00 37,400.00    
701-03-I storm drain pipe (24" rcp/pcp) 136      LNFT 50.00 6,800.00 145.00 19,720.00 110.00 14,960.00    
701-04-A storm drain pipe arch (15" equiv. rcpa) 125      LNFT 40.00 5,000.00 76.00 9,500.00 92.00 11,500.00    
701-04-B storm drain pipe arch (18" equiv. rcpa) 96      LNFT 50.00 4,800.00 125.00 12,000.00 100.00 9,600.00    
701-04-D storm drain pipe arch (24" equiv. rcpa) 126      LNFT 55.00 6,930.00 130.00 16,380.00 125.00 15,750.00    
701-04-F storm drain pipe arch (36" equiv. rcpa) 36      LNFT 75.00 2,700.00 175.00 6,300.00 230.00 8,280.00    
702-02-A manholes (mh-06) 10      EACH 5,000.00 50,000.00 3,000.00 30,000.00 5,500.00 55,000.00    
702-03-A catch basins (cb-01) 9      EACH 5,000.00 45,000.00 3,000.00 27,000.00 3,500.00 31,500.00    
702-03-C catch basins (cb-06) 18      EACH 5,500.00 99,000.00 6,500.00 117,000.00 4,000.00 72,000.00    
702-03-D catch basins (cb-07) 8      EACH 6,000.00 48,000.00 7,500.00 60,000.00 6,000.00 48,000.00    
702-03-F catch basins (cb-08) 8      EACH 6,000.00 48,000.00 9,000.00 72,000.00 7,500.00 60,000.00    
702-03-G catch basins (cb-09) 14      EACH 6,000.00 84,000.00 10,000.00 140,000.00 6,500.00 91,000.00    
702-04-A adjusting manholes 5      EACH 6,000.00 30,000.00 1,500.00 7,500.00 1,200.00 6,000.00    
702-04-D adjusting water valves 12      EACH 100.00 1,200.00 250.00 3,000.00 400.00 4,800.00    
703-03 perforated pipe underdrains 4,111      LNFT 17.50 71,942.50 15.00 61,665.00 30.00 123,330.00    
704-11-B guard rail end treatment (tangent) 2      EACH 4,500.00 9,000.00 2,500.00 5,000.00 4,000.00 8,000.00    
705-06-C chain link fence (6-foot height) 25      LNFT 90.00 2,250.00 50.00 1,250.00 200.00 5,000.00    
705-08-C 12.5-foot double gates for chain link fence (6-foot
height)
1      DBGT 2,500.00 2,500.00 1,800.00 1,800.00 600.00 600.00    
706-01-A concrete walk (4" thick) 956.3    SQYD 60.00 57,378.00 60.00 57,378.00 52.00 49,727.60    
706-02-C concrete drive (6" thick) 1,063.2    SQYD 65.00 69,108.00 66.00 70,171.20 72.00 76,550.40    
706-04 handicapped curb ramps 12.0    EACH 2,000.00 24,000.00 350.00 4,200.00 1,500.00 18,000.00    
707-01 concrete curb 4,144.3    LNFT 5.25 21,757.58 10.00 41,443.00 12.00 49,731.60    
712-01-C concrete cast-in-place revetment (6" thick) 480      SQYD 75.00 36,000.00 100.00 48,000.00 82.00 39,360.00    
712-01-D concrete cast-in-place revetment (8" thick) 133      SQYD 90.00 11,970.00 135.00 17,955.00 92.00 12,236.00    
713-01 temporary signs & barricades lump      LUMP 50,000.00 50,000.00 100,000.00 100,000.00 125,000.00 125,000.00    
714-01 sodding 913      SQYD 7.50 6,847.50 3.00 2,739.00 6.00 5,478.00    
726-01-A bedding material (granular storm drain pipe backfill) 25.0    CUYD 100.00 2,500.00 92.00 2,300.00 130.00 3,250.00    
726-01-B bedding material (stone) 52.0    CUYD 100.00 5,200.00 100.00 5,200.00 130.00 6,760.00    
727-01 mobilization lump      LUMP 150,000.00 150,000.00 350,000.00 350,000.00 300,000.00 300,000.00    
729-16-C object marker assembly (type 3) 5      EACH 100.00 500.00 75.00 375.00 300.00 1,500.00    
731-02 reflectorized raised pavement markers 54      EACH 10.00 540.00 5.00 270.00 9.00 486.00    
732-01-E plastic pavement striping (24" width) 110      LNFT 7.50 825.00 5.00 550.00 6.00 660.00    
732-02-A-03 plastic pvmt striping(solid line)(4" width)hot appl
thermo (40mil thickness)
1.465  MILE 3,000.00 4,395.00 2,500.00 3,662.50 3,000.00 4,395.00    
732-03-A-03 plastic pvmt striping(broken line)(4" width) hot appl
thermo (40 mil thickness)
0.022  MILE 1,000.00 22.00 820.00 18.04 3,000.00 66.00    
735-01 mailboxes 33      EACH 25.00 825.00 1.25 41.25 300.00 9,900.00    
735-02 mailbox supports (single) 33      EACH 125.00 4,125.00 100.00 3,300.00 300.00 9,900.00    
739-01 hydro-seeding 0.92   ACRE 2,500.00 2,300.00 2,200.00 2,024.00 4,800.00 4,416.00    
740-01 construction layout lump      LUMP 100,000.00 100,000.00 40,000.00 40,000.00 150,000.00 150,000.00    
742-01-A sanitary sewer pipe (8"sdr-26 pvc) 20      LNFT 50.00 1,000.00 100.00 2,000.00 100.00 2,000.00    
742-01-B sanitary sewer pipe (8" ductile iron with ceramic
lining)
155      LNFT 132.00 20,460.00 150.00 23,250.00 150.00 23,250.00    
805-06 class r concrete 50.00   CUYD 250.00 12,500.00 275.00 13,750.00 120.00 6,000.00    
807-08 structural metalwork lump      LUMP 2,500.00 2,500.00 4,500.00 4,500.00 12,347.50 12,347.50    
810-01 concrete railing (barrier) 230.00   LNFT 50.00 11,500.00 330.00 75,900.00 148.50 34,155.00    
813-01 concrete approach slabs 255.10   SQYD 275.00 70,152.50 300.00 76,530.00 253.00 64,540.30    
814-01-C drilled shaft (30") 592.0    LNFT 200.00 118,400.00 425.00 251,600.00 313.00 185,296.00    
S-001 dewatering lump      LUMP 25,000.00 25,000.00 5,500.00 5,500.00 110,000.00 110,000.00    
S-002 geotextile drainage net composite 480      SQYD 16.00 7,680.00 8.00 3,840.00 7.00 3,360.00    
S-003 slope revetement footing 150      LNFT 20.00 3,000.00 90.00 13,500.00 33.00 4,950.00    
S-004 saw cutting pavement 5,842      INFT 8.00 46,736.00 2.50 14,605.00 1.50 8,763.00    
S-005 tie-in of existing storm drain pipe 8      EACH 4,000.00 32,000.00 2,000.00 16,000.00 2,000.00 16,000.00    
S-006 removal and replacement of existing water main (6"
ductile iron)
lump      LUMP 15,000.00 15,000.00 2,500.00 2,500.00 10,000.00 10,000.00    
S-007 sanitary sewer manhole 1      EACH 5,000.00 5,000.00 3,500.00 3,500.00 2,500.00 2,500.00    
S-008 tie-in proposed sanitary sewer main into existing
sanitary sewer manhole
2      EACH 1,500.00 3,000.00 2,500.00 5,000.00 5,000.00 10,000.00    
S-101 precast concrete bridge lump      LUMP 400,000.00 400,000.00 220,000.00 220,000.00 580,050.00 580,050.00    
S-102 coating for pedestrian guardrail lump      LUMP 5,000.00 5,000.00 3,000.00 3,000.00 3,000.00 3,000.00    
S-103 flexible post delineators 5      EACH 150.00 750.00 60.00 300.00 300.00 1,500.00    
                       
 CONTRACTOR TOTAL       3,012,659.26   3,549,899.79   3,990,697.40    