| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - W. E. MCDONALD & SON, LLC. |
- 2 - C W & W CONTRACTORS, INC. |
- 3 - GUINN BROTHERS, LLC. |
- 4 - GILCHRIST CONSTRUCTION CO. LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
25,000.00 |
25,000.00 |
20,000.00 |
20,000.00 |
50,000.00 |
50,000.00 |
100,000.00 |
100,000.00 |
| 202-01 |
removal of structures and obstructions
|
lump |
lump |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
| 202-02-A-01 |
removal of bridge(sta. 36+05-20.70 ft.w x 39.00 ft. l
timber bridge) |
1   |
EACH |
6,000.00 |
6,000.00 |
5,000.00 |
5,000.00 |
6,000.00 |
6,000.00 |
25,000.00 |
25,000.00 |
| 202-02-A-03 |
removal of bridge(sta. 15+15-19.00ft.w x 153.00 ft. l
timber bridge) |
1   |
EACH |
14,000.00 |
14,000.00 |
10,000.00 |
10,000.00 |
16,000.00 |
16,000.00 |
30,000.00 |
30,000.00 |
| 203-05 |
excavation and embankment
|
lump |
LUMP |
45,000.00 |
45,000.00 |
60,000.00 |
60,000.00 |
48,000.00 |
48,000.00 |
70,000.00 |
70,000.00 |
| 204-02 |
temporary hay or straw bales
|
230   |
EACH |
10.00 |
2,300.00 |
10.00 |
2,300.00 |
10.00 |
2,300.00 |
10.00 |
2,300.00 |
| 204-03 |
temporary slope drains
|
76   |
LNFT |
25.00 |
1,900.00 |
10.00 |
760.00 |
10.00 |
760.00 |
40.00 |
3,040.00 |
| 204-06 |
temporary silt fencing
|
1,675   |
LNFT |
3.00 |
5,025.00 |
3.00 |
5,025.00 |
3.00 |
5,025.00 |
2.00 |
3,350.00 |
| 302-01-A |
class ii base course (stone or asphaltic concrete)
|
475.5 |
CUYD |
125.00 |
59,437.50 |
100.00 |
47,550.00 |
100.00 |
47,550.00 |
130.00 |
61,815.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
24   |
CUYD |
125.00 |
3,000.00 |
100.00 |
2,400.00 |
100.00 |
2,400.00 |
75.00 |
1,800.00 |
| 502-01 |
superpave asphaltic concrete
|
412.0 |
TON |
185.00 |
76,220.00 |
235.00 |
96,820.00 |
275.00 |
113,300.00 |
150.00 |
61,800.00 |
| 701-01-U |
cross drain pipe (84" cmp)
|
186   |
LNFT |
700.00 |
130,200.00 |
450.00 |
83,700.00 |
545.00 |
101,370.00 |
350.00 |
65,100.00 |
| 701-05-I |
side drain pipe (24")
|
106   |
LNFT |
35.00 |
3,710.00 |
60.00 |
6,360.00 |
85.00 |
9,010.00 |
90.00 |
9,540.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
65.00 |
13,000.00 |
75.00 |
15,000.00 |
68.00 |
13,600.00 |
60.00 |
12,000.00 |
| 704-09 |
guard rail anchor sections (turndown)
|
200.0 |
LNFT |
40.00 |
8,000.00 |
40.00 |
8,000.00 |
35.00 |
7,000.00 |
55.00 |
11,000.00 |
| 705-01 |
barbed wire fence
|
288   |
LNFT |
6.00 |
1,728.00 |
10.00 |
2,880.00 |
8.00 |
2,304.00 |
8.50 |
2,448.00 |
| 711-01-C |
riprap (30 lb, 14" thick)
|
1,260   |
SQYD |
53.00 |
66,780.00 |
85.00 |
107,100.00 |
70.00 |
88,200.00 |
50.00 |
63,000.00 |
| 711-01-D |
riprap (55 lb,18" thick)
|
650   |
SQYD |
60.00 |
39,000.00 |
85.00 |
55,250.00 |
80.00 |
52,000.00 |
55.00 |
35,750.00 |
| 711-03-B |
riprap (10 lb)
|
50.0 |
TON |
100.00 |
5,000.00 |
50.00 |
2,500.00 |
100.00 |
5,000.00 |
60.00 |
3,000.00 |
| 711-04 |
geotextile fabric
|
1,927   |
SQYD |
3.00 |
5,781.00 |
3.00 |
5,781.00 |
5.00 |
9,635.00 |
2.00 |
3,854.00 |
| 712-02 |
sacked concrete revetment
|
591   |
SQYD |
125.00 |
73,875.00 |
95.00 |
56,145.00 |
85.00 |
50,235.00 |
100.00 |
59,100.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
22,500.00 |
22,500.00 |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
50,000.00 |
50,000.00 |
| 716-01-A |
mulch (vegetative)
|
0.8 |
TON |
600.00 |
480.00 |
750.00 |
600.00 |
2,000.00 |
1,600.00 |
2,100.00 |
1,680.00 |
| 717-01 |
seeding
|
15   |
LB |
15.00 |
225.00 |
19.00 |
285.00 |
30.00 |
450.00 |
26.00 |
390.00 |
| 718-01 |
fertilizer
|
320   |
LB |
1.00 |
320.00 |
1.25 |
400.00 |
1.00 |
320.00 |
2.75 |
880.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
2,250   |
SQYD |
1.50 |
3,375.00 |
2.00 |
4,500.00 |
2.00 |
4,500.00 |
2.20 |
4,950.00 |
| 726-01 |
bedding material
|
72.2 |
CUYD |
125.00 |
9,025.00 |
125.00 |
9,025.00 |
100.00 |
7,220.00 |
85.00 |
6,137.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
37,500.00 |
37,500.00 |
78,000.00 |
78,000.00 |
105,000.00 |
105,000.00 |
140,000.00 |
140,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
75.00 |
300.00 |
95.00 |
380.00 |
100.00 |
400.00 |
75.00 |
300.00 |
| 729-16-C |
object marker assembly (type 3)
|
16   |
EACH |
75.00 |
1,200.00 |
140.00 |
2,240.00 |
125.00 |
2,000.00 |
75.00 |
1,200.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
7,000.00 |
7,000.00 |
25,000.00 |
25,000.00 |
18,000.00 |
18,000.00 |
14,000.00 |
14,000.00 |
| 804-01-B |
precast concrete piles (14")
|
720   |
LNFT |
54.00 |
38,880.00 |
100.00 |
72,000.00 |
59.50 |
42,840.00 |
65.00 |
46,800.00 |
| 804-01-C |
precast concrete piles (16")
|
1,917   |
LNFT |
64.00 |
122,688.00 |
100.00 |
191,700.00 |
75.00 |
143,775.00 |
64.00 |
122,688.00 |
| 804-12 |
loading permanent piles
|
2   |
EACH |
1.00 |
2.00 |
1.00 |
2.00 |
1.00 |
2.00 |
7,500.00 |
15,000.00 |
| 805-10-A |
bridge superstructure & substructure (24', 90 degree
crossing , c.i.p. bents) |
8   |
SPAN |
26,000.00 |
208,000.00 |
23,000.00 |
184,000.00 |
32,000.00 |
256,000.00 |
31,000.00 |
248,000.00 |
| 805-10-B |
bridge superstructure & substructure (24', 90 degree
crossing) (c.i.p.) |
3   |
SPAN |
26,000.00 |
78,000.00 |
23,000.00 |
69,000.00 |
32,000.00 |
96,000.00 |
31,000.00 |
93,000.00 |
| S-101 |
concrete approach slabs (24',90 degree crossing)
(w/asphalt) |
3   |
EACH |
9,000.00 |
27,000.00 |
10,000.00 |
30,000.00 |
10,000.00 |
30,000.00 |
10,000.00 |
30,000.00 |
| S-102 |
concrete approach slabs (24',90 degree crossing)
(curved)(w/asphalt) |
1   |
EACH |
9,000.00 |
9,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,160,451.50 |
|
1,294,703.00 |
|
1,382,796.00 |
|
1,418,922.00 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - KEY CONSTRUCTORS, INC. |
- 6 - FENTON EXCAVATING & CONST. INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
90,000.00 |
90,000.00 |
32,724.00 |
32,724.00 |
|
|
|
|
| 202-01 |
removal of structures and obstructions
|
lump |
lump |
10,000.00 |
10,000.00 |
14,868.00 |
14,868.00 |
|
|
|
|
| 202-02-A-01 |
removal of bridge(sta. 36+05-20.70 ft.w x 39.00 ft. l
timber bridge) |
1   |
EACH |
6,000.00 |
6,000.00 |
4,600.00 |
4,600.00 |
|
|
|
|
| 202-02-A-03 |
removal of bridge(sta. 15+15-19.00ft.w x 153.00 ft. l
timber bridge) |
1   |
EACH |
20,000.00 |
20,000.00 |
8,625.00 |
8,625.00 |
|
|
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
35,000.00 |
35,000.00 |
63,375.00 |
63,375.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
230   |
EACH |
15.00 |
3,450.00 |
9.20 |
2,116.00 |
|
|
|
|
| 204-03 |
temporary slope drains
|
76   |
LNFT |
20.00 |
1,520.00 |
11.50 |
874.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
1,675   |
LNFT |
4.00 |
6,700.00 |
3.45 |
5,778.75 |
|
|
|
|
| 302-01-A |
class ii base course (stone or asphaltic concrete)
|
475.5 |
CUYD |
110.00 |
52,305.00 |
112.70 |
53,588.85 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
24   |
CUYD |
90.00 |
2,160.00 |
58.00 |
1,392.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
412.0 |
TON |
185.00 |
76,220.00 |
216.00 |
88,992.00 |
|
|
|
|
| 701-01-U |
cross drain pipe (84" cmp)
|
186   |
LNFT |
400.00 |
74,400.00 |
519.00 |
96,534.00 |
|
|
|
|
| 701-05-I |
side drain pipe (24")
|
106   |
LNFT |
60.00 |
6,360.00 |
98.00 |
10,388.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
60.00 |
12,000.00 |
65.00 |
13,000.00 |
|
|
|
|
| 704-09 |
guard rail anchor sections (turndown)
|
200.0 |
LNFT |
60.00 |
12,000.00 |
65.00 |
13,000.00 |
|
|
|
|
| 705-01 |
barbed wire fence
|
288   |
LNFT |
8.00 |
2,304.00 |
24.00 |
6,912.00 |
|
|
|
|
| 711-01-C |
riprap (30 lb, 14" thick)
|
1,260   |
SQYD |
70.00 |
88,200.00 |
86.00 |
108,360.00 |
|
|
|
|
| 711-01-D |
riprap (55 lb,18" thick)
|
650   |
SQYD |
115.00 |
74,750.00 |
100.00 |
65,000.00 |
|
|
|
|
| 711-03-B |
riprap (10 lb)
|
50.0 |
TON |
65.00 |
3,250.00 |
86.00 |
4,300.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
1,927   |
SQYD |
3.00 |
5,781.00 |
1.38 |
2,659.26 |
|
|
|
|
| 712-02 |
sacked concrete revetment
|
591   |
SQYD |
75.00 |
44,325.00 |
81.00 |
47,871.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
25,000.00 |
25,000.00 |
9,000.00 |
9,000.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
0.8 |
TON |
700.00 |
560.00 |
805.00 |
644.00 |
|
|
|
|
| 717-01 |
seeding
|
15   |
LB |
15.00 |
225.00 |
23.00 |
345.00 |
|
|
|
|
| 718-01 |
fertilizer
|
320   |
LB |
1.00 |
320.00 |
0.75 |
240.00 |
|
|
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
2,250   |
SQYD |
1.75 |
3,937.50 |
1.84 |
4,140.00 |
|
|
|
|
| 726-01 |
bedding material
|
72.2 |
CUYD |
110.00 |
7,942.00 |
108.00 |
7,797.60 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
150,000.00 |
150,000.00 |
130,567.00 |
130,567.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
70.00 |
280.00 |
80.50 |
322.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
16   |
EACH |
85.00 |
1,360.00 |
98.00 |
1,568.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
40,000.00 |
40,000.00 |
51,840.00 |
51,840.00 |
|
|
|
|
| 804-01-B |
precast concrete piles (14")
|
720   |
LNFT |
70.00 |
50,400.00 |
75.60 |
54,432.00 |
|
|
|
|
| 804-01-C |
precast concrete piles (16")
|
1,917   |
LNFT |
90.00 |
172,530.00 |
81.00 |
155,277.00 |
|
|
|
|
| 804-12 |
loading permanent piles
|
2   |
EACH |
1,500.00 |
3,000.00 |
1,400.00 |
2,800.00 |
|
|
|
|
| 805-10-A |
bridge superstructure & substructure (24', 90 degree
crossing , c.i.p. bents) |
8   |
SPAN |
33,000.00 |
264,000.00 |
34,970.00 |
279,760.00 |
|
|
|
|
| 805-10-B |
bridge superstructure & substructure (24', 90 degree
crossing) (c.i.p.) |
3   |
SPAN |
34,500.00 |
103,500.00 |
40,763.00 |
122,289.00 |
|
|
|
|
| S-101 |
concrete approach slabs (24',90 degree crossing)
(w/asphalt) |
3   |
EACH |
9,000.00 |
27,000.00 |
11,400.00 |
34,200.00 |
|
|
|
|
| S-102 |
concrete approach slabs (24',90 degree crossing)
(curved)(w/asphalt) |
1   |
EACH |
10,000.00 |
10,000.00 |
12,000.00 |
12,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,486,779.50 |
|
1,512,179.46 |
|
|
|
|
|