Letting of 11/12/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 713-11-0105
Parish: CALDWELL
Routes:
Description: CHILDRESS ROAD BRIDGES
Type Const: grading, removal of bridges, concrete slab bridges, and related work.
Estimated Construction Cost: $1,027,471.25
 
RankLicenseBidderConstruction Bid
1 23112 BEN ALLEN, INC. $912,946.00
2 14788 LOUISIANA BRIDGE, INC. $975,913.75
3 18546 C W & W CONTRACTORS, INC. $984,593.40
4 09476 KEY CONSTRUCTORS, INC. $1,043,756.00
5 12312 GILCHRIST CONSTRUCTION CO. LLC $1,112,406.00
6 09090 GUINN BROTHERS, LLC. $1,136,859.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
BEN ALLEN, INC.
- 2 -
LOUISIANA BRIDGE, INC.
- 3 -
C W & W CONTRACTORS, INC.
- 4 -
KEY CONSTRUCTORS, INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 15,000.00 15,000.00 19,050.00 19,050.00 25,000.00 25,000.00 80,000.00 80,000.00
202-02-A-01 removal of bridges (sta 5+85.80; 19.00'x36.86' timber
bridge)
1      EACH 5,000.00 5,000.00 5,875.00 5,875.00 7,500.00 7,500.00 6,000.00 6,000.00
202-02-A-02 removal of bridges (sta 10+00.00; 19.00'x95.99' timber
bridge)
1      EACH 5,000.00 5,000.00 8,725.00 8,725.00 7,500.00 7,500.00 15,000.00 15,000.00
202-02-A-03 removal of bridges (sta 12+88.59; 20.00'x30.19' timber
bridge)
1      EACH 5,000.00 5,000.00 1,150.00 1,150.00 5,000.00 5,000.00 6,000.00 6,000.00
202-02-I removal of surfacing & base (8" thick) 862.0    sqyd 10.00 8,620.00 10.00 8,620.00 10.00 8,620.00 10.00 8,620.00
203-05 excavation and embankment lump      LUMP 90,000.00 90,000.00 108,000.00 108,000.00 75,000.00 75,000.00 45,000.00 45,000.00
204-02 temporary hay or straw bales 28      EACH 0.00 0.00 1.00 28.00 10.00 280.00 15.00 420.00
204-03 temporary slope drains 240      LNFT 0.00 0.00 1.00 240.00 10.00 2,400.00 14.00 3,360.00
204-05-A temporary sediment check dams (hay) 12      EACH 0.00 0.00 1.00 12.00 125.00 1,500.00 300.00 3,600.00
204-06 temporary silt fencing 1,879      LNFT 3.00 5,637.00 1.00 1,879.00 3.00 5,637.00 4.00 7,516.00
403-01 aggregate roadway surfacing (vehicular measurement) 198.5    CUYD 120.00 23,820.00 81.00 16,078.50 100.00 19,850.00 85.00 16,872.50
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 65.00 13,000.00 69.00 13,800.00 75.00 15,000.00 60.00 12,000.00
704-09 guard rail anchor sections (turndown) 200.0    LNFT 40.00 8,000.00 40.00 8,000.00 40.00 8,000.00 35.00 7,000.00
711-01-C riprap (30 lb,14" thick) 647      SQYD 85.00 54,995.00 92.50 59,847.50 85.00 54,995.00 75.00 48,525.00
711-04 geotextile fabric 647      SQYD 3.00 1,941.00 3.25 2,102.75 3.00 1,941.00 3.00 1,941.00
713-01 temporary signs & barricades lump      LUMP 8,500.00 8,500.00 8,350.00 8,350.00 15,000.00 15,000.00 15,000.00 15,000.00
716-01-A mulch (vegetative) 1.4    TON 1,000.00 1,400.00 1,543.00 2,160.20 1,400.00 1,960.00 700.00 980.00
717-01 seeding 31      LB 25.00 775.00 9.75 302.25 30.00 930.00 10.00 310.00
718-01 fertilizer 690      LB 1.00 690.00 2.25 1,552.50 2.50 1,725.00 0.85 586.50
726-01 bedding material 53.7    CUYD 110.00 5,907.00 125.00 6,712.50 160.00 8,592.00 110.00 5,907.00
727-01 mobilization lump      LUMP 65,000.00 65,000.00 89,575.00 89,575.00 100,000.00 100,000.00 110,000.00 110,000.00
729-16-B object marker assembly (type 2) 4      EACH 90.00 360.00 80.00 320.00 95.00 380.00 70.00 280.00
729-16-C object marker assembly (type 3) 16      EACH 85.00 1,360.00 97.00 1,552.00 140.00 2,240.00 85.00 1,360.00
740-01 construction layout lump      LUMP 9,000.00 9,000.00 11,625.00 11,625.00 20,000.00 20,000.00 30,000.00 30,000.00
804-01-C precast concrete piles (16") 1,941      LNFT 67.00 130,047.00 65.25 126,650.25 110.00 213,510.00 68.00 131,988.00
804-12 loading permanent piles 2      EACH 0.00 0.00 1.00 2.00 1.00 2.00 1,500.00 3,000.00
805-01-B class a concrete (box culvert headwalls) 19.46   CUYD 1,250.00 24,325.00 1,590.00 30,941.40 1,400.00 27,244.00 1,400.00 27,244.00
805-10-A bridge superstructure & substructure (24 ft roadway;
90 deg crossing)
9      SPAN 33,000.00 297,000.00 35,300.00 317,700.00 23,000.00 207,000.00 33,000.00 297,000.00
805-12-I reinforced concrete box culverts (5'x 5') 160.0    LNFT 575.00 92,000.00 522.25 83,560.00 650.00 104,000.00 775.00 124,000.00
806-01 deformed reinforcing steel 1,523      LB 3.00 4,569.00 2.30 3,502.90 3.80 5,787.40 2.00 3,046.00
S-101 concrete approach slabs (24ft roadway;90 deg crossing;
w/o asphalt)
4      EACH 9,000.00 36,000.00 9,500.00 38,000.00 9,500.00 38,000.00 7,800.00 31,200.00
                       
 CONTRACTOR TOTAL       912,946.00   975,913.75   984,593.40   1,043,756.00
 
Item Number Item Description Quantity Unit of Measure - 5 -
GILCHRIST CONSTRUCTION CO. LLC
- 6 -
GUINN BROTHERS, LLC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 50,000.00 50,000.00 45,000.00 45,000.00        
202-02-A-01 removal of bridges (sta 5+85.80; 19.00'x36.86' timber
bridge)
1      EACH 6,000.00 6,000.00 10,000.00 10,000.00        
202-02-A-02 removal of bridges (sta 10+00.00; 19.00'x95.99' timber
bridge)
1      EACH 10,000.00 10,000.00 24,000.00 24,000.00        
202-02-A-03 removal of bridges (sta 12+88.59; 20.00'x30.19' timber
bridge)
1      EACH 6,000.00 6,000.00 8,000.00 8,000.00        
202-02-I removal of surfacing & base (8" thick) 862.0    sqyd 6.00 5,172.00 8.00 6,896.00        
203-05 excavation and embankment lump      LUMP 35,000.00 35,000.00 65,000.00 65,000.00        
204-02 temporary hay or straw bales 28      EACH 10.00 280.00 10.00 280.00        
204-03 temporary slope drains 240      LNFT 20.00 4,800.00 10.00 2,400.00        
204-05-A temporary sediment check dams (hay) 12      EACH 230.00 2,760.00 100.00 1,200.00        
204-06 temporary silt fencing 1,879      LNFT 2.00 3,758.00 4.00 7,516.00        
403-01 aggregate roadway surfacing (vehicular measurement) 198.5    CUYD 65.00 12,902.50 100.00 19,850.00        
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 65.00 13,000.00 69.00 13,800.00        
704-09 guard rail anchor sections (turndown) 200.0    LNFT 38.00 7,600.00 42.00 8,400.00        
711-01-C riprap (30 lb,14" thick) 647      SQYD 80.00 51,760.00 80.00 51,760.00        
711-04 geotextile fabric 647      SQYD 3.00 1,941.00 5.00 3,235.00        
713-01 temporary signs & barricades lump      LUMP 12,000.00 12,000.00 16,500.00 16,500.00        
716-01-A mulch (vegetative) 1.4    TON 450.00 630.00 2,000.00 2,800.00        
717-01 seeding 31      LB 11.00 341.00 30.00 930.00        
718-01 fertilizer 690      LB 1.00 690.00 1.00 690.00        
726-01 bedding material 53.7    CUYD 110.00 5,907.00 100.00 5,370.00        
727-01 mobilization lump      LUMP 250,000.00 250,000.00 150,000.00 150,000.00        
729-16-B object marker assembly (type 2) 4      EACH 85.00 340.00 100.00 400.00        
729-16-C object marker assembly (type 3) 16      EACH 85.00 1,360.00 100.00 1,600.00        
740-01 construction layout lump      LUMP 12,000.00 12,000.00 52,800.00 52,800.00        
804-01-C precast concrete piles (16") 1,941      LNFT 90.00 174,690.00 75.00 145,575.00        
804-12 loading permanent piles 2      EACH 10,000.00 20,000.00 1.00 2.00        
805-01-B class a concrete (box culvert headwalls) 19.46   CUYD 1,500.00 29,190.00 1,550.00 30,163.00        
805-10-A bridge superstructure & substructure (24 ft roadway;
90 deg crossing)
9      SPAN 32,000.00 288,000.00 35,000.00 315,000.00        
805-12-I reinforced concrete box culverts (5'x 5') 160.0    LNFT 450.00 72,000.00 635.00 101,600.00        
806-01 deformed reinforcing steel 1,523      LB 1.50 2,284.50 4.00 6,092.00        
S-101 concrete approach slabs (24ft roadway;90 deg crossing;
w/o asphalt)
4      EACH 8,000.00 32,000.00 10,000.00 40,000.00        
                       
 CONTRACTOR TOTAL       1,112,406.00   1,136,859.00        