| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BEN ALLEN, INC. |
- 2 - LOUISIANA BRIDGE, INC. |
- 3 - C W & W CONTRACTORS, INC. |
- 4 - KEY CONSTRUCTORS, INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
15,000.00 |
15,000.00 |
19,050.00 |
19,050.00 |
25,000.00 |
25,000.00 |
80,000.00 |
80,000.00 |
| 202-02-A-01 |
removal of bridges (sta 5+85.80; 19.00'x36.86' timber
bridge) |
1   |
EACH |
5,000.00 |
5,000.00 |
5,875.00 |
5,875.00 |
7,500.00 |
7,500.00 |
6,000.00 |
6,000.00 |
| 202-02-A-02 |
removal of bridges (sta 10+00.00; 19.00'x95.99' timber
bridge) |
1   |
EACH |
5,000.00 |
5,000.00 |
8,725.00 |
8,725.00 |
7,500.00 |
7,500.00 |
15,000.00 |
15,000.00 |
| 202-02-A-03 |
removal of bridges (sta 12+88.59; 20.00'x30.19' timber
bridge) |
1   |
EACH |
5,000.00 |
5,000.00 |
1,150.00 |
1,150.00 |
5,000.00 |
5,000.00 |
6,000.00 |
6,000.00 |
| 202-02-I |
removal of surfacing & base (8" thick)
|
862.0 |
sqyd |
10.00 |
8,620.00 |
10.00 |
8,620.00 |
10.00 |
8,620.00 |
10.00 |
8,620.00 |
| 203-05 |
excavation and embankment
|
lump |
LUMP |
90,000.00 |
90,000.00 |
108,000.00 |
108,000.00 |
75,000.00 |
75,000.00 |
45,000.00 |
45,000.00 |
| 204-02 |
temporary hay or straw bales
|
28   |
EACH |
0.00 |
0.00 |
1.00 |
28.00 |
10.00 |
280.00 |
15.00 |
420.00 |
| 204-03 |
temporary slope drains
|
240   |
LNFT |
0.00 |
0.00 |
1.00 |
240.00 |
10.00 |
2,400.00 |
14.00 |
3,360.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
12   |
EACH |
0.00 |
0.00 |
1.00 |
12.00 |
125.00 |
1,500.00 |
300.00 |
3,600.00 |
| 204-06 |
temporary silt fencing
|
1,879   |
LNFT |
3.00 |
5,637.00 |
1.00 |
1,879.00 |
3.00 |
5,637.00 |
4.00 |
7,516.00 |
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
198.5 |
CUYD |
120.00 |
23,820.00 |
81.00 |
16,078.50 |
100.00 |
19,850.00 |
85.00 |
16,872.50 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
65.00 |
13,000.00 |
69.00 |
13,800.00 |
75.00 |
15,000.00 |
60.00 |
12,000.00 |
| 704-09 |
guard rail anchor sections (turndown)
|
200.0 |
LNFT |
40.00 |
8,000.00 |
40.00 |
8,000.00 |
40.00 |
8,000.00 |
35.00 |
7,000.00 |
| 711-01-C |
riprap (30 lb,14" thick)
|
647   |
SQYD |
85.00 |
54,995.00 |
92.50 |
59,847.50 |
85.00 |
54,995.00 |
75.00 |
48,525.00 |
| 711-04 |
geotextile fabric
|
647   |
SQYD |
3.00 |
1,941.00 |
3.25 |
2,102.75 |
3.00 |
1,941.00 |
3.00 |
1,941.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
8,500.00 |
8,500.00 |
8,350.00 |
8,350.00 |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
| 716-01-A |
mulch (vegetative)
|
1.4 |
TON |
1,000.00 |
1,400.00 |
1,543.00 |
2,160.20 |
1,400.00 |
1,960.00 |
700.00 |
980.00 |
| 717-01 |
seeding
|
31   |
LB |
25.00 |
775.00 |
9.75 |
302.25 |
30.00 |
930.00 |
10.00 |
310.00 |
| 718-01 |
fertilizer
|
690   |
LB |
1.00 |
690.00 |
2.25 |
1,552.50 |
2.50 |
1,725.00 |
0.85 |
586.50 |
| 726-01 |
bedding material
|
53.7 |
CUYD |
110.00 |
5,907.00 |
125.00 |
6,712.50 |
160.00 |
8,592.00 |
110.00 |
5,907.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
65,000.00 |
65,000.00 |
89,575.00 |
89,575.00 |
100,000.00 |
100,000.00 |
110,000.00 |
110,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
90.00 |
360.00 |
80.00 |
320.00 |
95.00 |
380.00 |
70.00 |
280.00 |
| 729-16-C |
object marker assembly (type 3)
|
16   |
EACH |
85.00 |
1,360.00 |
97.00 |
1,552.00 |
140.00 |
2,240.00 |
85.00 |
1,360.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
9,000.00 |
9,000.00 |
11,625.00 |
11,625.00 |
20,000.00 |
20,000.00 |
30,000.00 |
30,000.00 |
| 804-01-C |
precast concrete piles (16")
|
1,941   |
LNFT |
67.00 |
130,047.00 |
65.25 |
126,650.25 |
110.00 |
213,510.00 |
68.00 |
131,988.00 |
| 804-12 |
loading permanent piles
|
2   |
EACH |
0.00 |
0.00 |
1.00 |
2.00 |
1.00 |
2.00 |
1,500.00 |
3,000.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
19.46 |
CUYD |
1,250.00 |
24,325.00 |
1,590.00 |
30,941.40 |
1,400.00 |
27,244.00 |
1,400.00 |
27,244.00 |
| 805-10-A |
bridge superstructure & substructure (24 ft roadway;
90 deg crossing) |
9   |
SPAN |
33,000.00 |
297,000.00 |
35,300.00 |
317,700.00 |
23,000.00 |
207,000.00 |
33,000.00 |
297,000.00 |
| 805-12-I |
reinforced concrete box culverts (5'x 5')
|
160.0 |
LNFT |
575.00 |
92,000.00 |
522.25 |
83,560.00 |
650.00 |
104,000.00 |
775.00 |
124,000.00 |
| 806-01 |
deformed reinforcing steel
|
1,523   |
LB |
3.00 |
4,569.00 |
2.30 |
3,502.90 |
3.80 |
5,787.40 |
2.00 |
3,046.00 |
| S-101 |
concrete approach slabs (24ft roadway;90 deg crossing;
w/o asphalt) |
4   |
EACH |
9,000.00 |
36,000.00 |
9,500.00 |
38,000.00 |
9,500.00 |
38,000.00 |
7,800.00 |
31,200.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
912,946.00 |
|
975,913.75 |
|
984,593.40 |
|
1,043,756.00 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - GILCHRIST CONSTRUCTION CO. LLC |
- 6 - GUINN BROTHERS, LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
50,000.00 |
50,000.00 |
45,000.00 |
45,000.00 |
|
|
|
|
| 202-02-A-01 |
removal of bridges (sta 5+85.80; 19.00'x36.86' timber
bridge) |
1   |
EACH |
6,000.00 |
6,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-A-02 |
removal of bridges (sta 10+00.00; 19.00'x95.99' timber
bridge) |
1   |
EACH |
10,000.00 |
10,000.00 |
24,000.00 |
24,000.00 |
|
|
|
|
| 202-02-A-03 |
removal of bridges (sta 12+88.59; 20.00'x30.19' timber
bridge) |
1   |
EACH |
6,000.00 |
6,000.00 |
8,000.00 |
8,000.00 |
|
|
|
|
| 202-02-I |
removal of surfacing & base (8" thick)
|
862.0 |
sqyd |
6.00 |
5,172.00 |
8.00 |
6,896.00 |
|
|
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
35,000.00 |
35,000.00 |
65,000.00 |
65,000.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
28   |
EACH |
10.00 |
280.00 |
10.00 |
280.00 |
|
|
|
|
| 204-03 |
temporary slope drains
|
240   |
LNFT |
20.00 |
4,800.00 |
10.00 |
2,400.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
12   |
EACH |
230.00 |
2,760.00 |
100.00 |
1,200.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
1,879   |
LNFT |
2.00 |
3,758.00 |
4.00 |
7,516.00 |
|
|
|
|
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
198.5 |
CUYD |
65.00 |
12,902.50 |
100.00 |
19,850.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
65.00 |
13,000.00 |
69.00 |
13,800.00 |
|
|
|
|
| 704-09 |
guard rail anchor sections (turndown)
|
200.0 |
LNFT |
38.00 |
7,600.00 |
42.00 |
8,400.00 |
|
|
|
|
| 711-01-C |
riprap (30 lb,14" thick)
|
647   |
SQYD |
80.00 |
51,760.00 |
80.00 |
51,760.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
647   |
SQYD |
3.00 |
1,941.00 |
5.00 |
3,235.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
12,000.00 |
12,000.00 |
16,500.00 |
16,500.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
1.4 |
TON |
450.00 |
630.00 |
2,000.00 |
2,800.00 |
|
|
|
|
| 717-01 |
seeding
|
31   |
LB |
11.00 |
341.00 |
30.00 |
930.00 |
|
|
|
|
| 718-01 |
fertilizer
|
690   |
LB |
1.00 |
690.00 |
1.00 |
690.00 |
|
|
|
|
| 726-01 |
bedding material
|
53.7 |
CUYD |
110.00 |
5,907.00 |
100.00 |
5,370.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
250,000.00 |
250,000.00 |
150,000.00 |
150,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
85.00 |
340.00 |
100.00 |
400.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
16   |
EACH |
85.00 |
1,360.00 |
100.00 |
1,600.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
12,000.00 |
12,000.00 |
52,800.00 |
52,800.00 |
|
|
|
|
| 804-01-C |
precast concrete piles (16")
|
1,941   |
LNFT |
90.00 |
174,690.00 |
75.00 |
145,575.00 |
|
|
|
|
| 804-12 |
loading permanent piles
|
2   |
EACH |
10,000.00 |
20,000.00 |
1.00 |
2.00 |
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
19.46 |
CUYD |
1,500.00 |
29,190.00 |
1,550.00 |
30,163.00 |
|
|
|
|
| 805-10-A |
bridge superstructure & substructure (24 ft roadway;
90 deg crossing) |
9   |
SPAN |
32,000.00 |
288,000.00 |
35,000.00 |
315,000.00 |
|
|
|
|
| 805-12-I |
reinforced concrete box culverts (5'x 5')
|
160.0 |
LNFT |
450.00 |
72,000.00 |
635.00 |
101,600.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
1,523   |
LB |
1.50 |
2,284.50 |
4.00 |
6,092.00 |
|
|
|
|
| S-101 |
concrete approach slabs (24ft roadway;90 deg crossing;
w/o asphalt) |
4   |
EACH |
8,000.00 |
32,000.00 |
10,000.00 |
40,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,112,406.00 |
|
1,136,859.00 |
|
|
|
|
|