| 201-01 |
clearing and grubbing
|
lump |
LUMP |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
30,000.00 |
30,000.00 |
| 202-02-A-01 |
removal of bridge (sta. 15+25 - 26.1 ft. x 45.5 ft.
timber bridge) |
1   |
EACH |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
5,300.00 |
5,300.00 |
30,000.00 |
30,000.00 |
| 203-05 |
excavation and embankment
|
lump |
LUMP |
25,000.00 |
25,000.00 |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
30,000.00 |
30,000.00 |
| 204-02 |
temporary hay or straw bales
|
11   |
EACH |
10.00 |
110.00 |
10.00 |
110.00 |
12.00 |
132.00 |
20.00 |
220.00 |
| 204-03 |
temporary slope drains
|
180   |
LNFT |
15.00 |
2,700.00 |
5.00 |
900.00 |
2.00 |
360.00 |
20.00 |
3,600.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
5   |
EACH |
125.00 |
625.00 |
125.00 |
625.00 |
120.00 |
600.00 |
400.00 |
2,000.00 |
| 204-06 |
temporary silt fencing
|
1,060   |
LNFT |
3.00 |
3,180.00 |
2.00 |
2,120.00 |
2.40 |
2,544.00 |
3.00 |
3,180.00 |
| 302-01 |
class ii base course
|
249.8 |
CUYD |
100.00 |
24,980.00 |
70.00 |
17,486.00 |
125.00 |
31,225.00 |
90.00 |
22,482.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
2   |
CUYD |
100.00 |
200.00 |
500.00 |
1,000.00 |
180.00 |
360.00 |
100.00 |
200.00 |
| 502-01 |
superpave asphaltic concrete
|
196.3 |
TON |
175.00 |
34,352.50 |
220.00 |
43,186.00 |
300.00 |
58,890.00 |
160.00 |
31,408.00 |
| 704-03 |
blocked out guard rail
|
50.0 |
LNFT |
30.00 |
1,500.00 |
28.00 |
1,400.00 |
25.00 |
1,250.00 |
30.00 |
1,500.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
75.00 |
7,500.00 |
72.00 |
7,200.00 |
84.00 |
8,400.00 |
75.00 |
7,500.00 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,900.00 |
11,600.00 |
2,300.00 |
9,200.00 |
3,300.00 |
13,200.00 |
2,500.00 |
10,000.00 |
| 705-01 |
barbed wire fence
|
293   |
LNFT |
8.50 |
2,490.50 |
5.50 |
1,611.50 |
12.00 |
3,516.00 |
6.00 |
1,758.00 |
| 712-02 |
sacked concrete revetment
|
372   |
SQYD |
85.00 |
31,620.00 |
60.00 |
22,320.00 |
87.00 |
32,364.00 |
90.00 |
33,480.00 |
| 713-01 |
temporary signs and barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
8,000.00 |
8,000.00 |
9,600.00 |
9,600.00 |
15,000.00 |
15,000.00 |
| 716-01-A |
mulch (vegetative)
|
0.6 |
TON |
2,400.00 |
1,440.00 |
1,000.00 |
600.00 |
2,000.00 |
1,200.00 |
1,000.00 |
600.00 |
| 717-01 |
seeding
|
13   |
LB |
13.00 |
169.00 |
30.00 |
390.00 |
1.00 |
13.00 |
20.00 |
260.00 |
| 718-01 |
fertilizer
|
280   |
LB |
1.00 |
280.00 |
2.00 |
560.00 |
2.00 |
560.00 |
1.00 |
280.00 |
| 727-01 |
moblization
|
lump |
LUMP |
35,000.00 |
35,000.00 |
18,000.00 |
18,000.00 |
40,000.00 |
40,000.00 |
50,000.00 |
50,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
95.00 |
380.00 |
110.00 |
440.00 |
100.00 |
400.00 |
200.00 |
800.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
7,500.00 |
7,500.00 |
3,000.00 |
3,000.00 |
20,000.00 |
20,000.00 |
| 804-01-B |
precast concrete piles (14")
|
736   |
LNFT |
100.00 |
73,600.00 |
147.00 |
108,192.00 |
60.00 |
44,160.00 |
90.00 |
66,240.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
1.00 |
1.00 |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
5,000.00 |
5,000.00 |
| 805-10-A |
bridge superstructure and substructure (28ft. clr.
rdwy.; 60deg crossing) (precast only) |
3   |
SPAN |
30,000.00 |
90,000.00 |
32,000.00 |
96,000.00 |
40,000.00 |
120,000.00 |
42,000.00 |
126,000.00 |
| S-101 |
concrete approach slabs (28ft. clr. rdwy.; 60deg
crossing) |
2   |
EACH |
10,000.00 |
20,000.00 |
7,500.00 |
15,000.00 |
10,000.00 |
20,000.00 |
8,000.00 |
16,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
391,728.00 |
|
402,840.50 |
|
428,074.00 |
|
507,508.00 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - GUINN BROTHERS, LLC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
LUMP |
30,000.00 |
30,000.00 |
|
|
|
|
|
|
| 202-02-A-01 |
removal of bridge (sta. 15+25 - 26.1 ft. x 45.5 ft.
timber bridge) |
1   |
EACH |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
30,000.00 |
30,000.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
11   |
EACH |
10.00 |
110.00 |
|
|
|
|
|
|
| 204-03 |
temporary slope drains
|
180   |
LNFT |
10.00 |
1,800.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
5   |
EACH |
100.00 |
500.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
1,060   |
LNFT |
5.00 |
5,300.00 |
|
|
|
|
|
|
| 302-01 |
class ii base course
|
249.8 |
CUYD |
105.00 |
26,229.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
2   |
CUYD |
100.00 |
200.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
196.3 |
TON |
602.00 |
118,172.60 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
50.0 |
LNFT |
40.00 |
2,000.00 |
|
|
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
80.00 |
8,000.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
3,800.00 |
15,200.00 |
|
|
|
|
|
|
| 705-01 |
barbed wire fence
|
293   |
LNFT |
8.00 |
2,344.00 |
|
|
|
|
|
|
| 712-02 |
sacked concrete revetment
|
372   |
SQYD |
125.00 |
46,500.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs and barricades
|
lump |
LUMP |
15,000.00 |
15,000.00 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
0.6 |
TON |
2,800.00 |
1,680.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
13   |
LB |
30.00 |
390.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
280   |
LB |
1.00 |
280.00 |
|
|
|
|
|
|
| 727-01 |
moblization
|
lump |
LUMP |
55,000.00 |
55,000.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
100.00 |
400.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
17,000.00 |
17,000.00 |
|
|
|
|
|
|
| 804-01-B |
precast concrete piles (14")
|
736   |
LNFT |
70.00 |
51,520.00 |
|
|
|
|
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 805-10-A |
bridge superstructure and substructure (28ft. clr.
rdwy.; 60deg crossing) (precast only) |
3   |
SPAN |
45,000.00 |
135,000.00 |
|
|
|
|
|
|
| S-101 |
concrete approach slabs (28ft. clr. rdwy.; 60deg
crossing) |
2   |
EACH |
15,000.00 |
30,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|