Letting of 11/12/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 713-05-0104
Parish: AVOYELLES
Routes:
Description: FORT DE RUSSY BRIDGE AND JOHNSON BRIDGE
Type Const: grading, drainage structures, class ii base course, superpave asphaltic concrete
pavement, concrete slab span bridge, and related work.
Estimated Construction Cost: $897,156.65
 
RankLicenseBidderConstruction Bid
1 08815 W. E. MCDONALD & SON, LLC. $793,696.05
2 50078 FENTON EXCAVATING & CONST. INC. $897,624.61
3 12312 GILCHRIST CONSTRUCTION CO. LLC $959,978.05
4 09090 GUINN BROTHERS, LLC. $964,596.47
5 18546 C W & W CONTRACTORS, INC. $1,020,572.70
 
Item Number Item Description Quantity Unit of Measure - 1 -
W. E. MCDONALD & SON, LLC.
- 2 -
FENTON EXCAVATING & CONST. INC.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC
- 4 -
GUINN BROTHERS, LLC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 25,000.00 25,000.00 14,506.00 14,506.00 30,000.00 30,000.00 40,000.00 40,000.00
202-02-A-01 removal of bridge (sta. 3+012.22, 6.10m x24.44m,7-span
timber bridge)
1      each 8,000.00 8,000.00 7,700.00 7,700.00 20,000.00 20,000.00 14,000.00 14,000.00
202-02-A-02 removal of bridge (sta. 3+008.55, 4.90m x17.10m,5-span
timber bridge)
1      each 8,000.00 8,000.00 4,370.00 4,370.00 20,000.00 20,000.00 10,000.00 10,000.00
203-05 excavation and embankment lump      lump 42,000.00 42,000.00 32,700.00 32,700.00 100,000.00 100,000.00 35,000.00 35,000.00
204-02 temporary baled hay or straw 14      each 5.00 70.00 23.00 322.00 15.00 210.00 10.00 140.00
204-03 temporary slope drains 40      ln m 35.00 1,400.00 8.00 320.00 75.00 3,000.00 10.00 400.00
204-06 temporary silt fencing 625      ln m 11.00 6,875.00 7.00 4,375.00 2.50 1,562.50 13.50 8,437.50
302-01 class ii base course 326.1    cu m 140.00 45,654.00 115.00 37,501.50 185.00 60,328.50 130.00 42,393.00
401-02 aggregate surface course (adjusted vehicular
measurement)
2      cu m 500.00 1,000.00 201.00 402.00 90.00 180.00 100.00 200.00
402-01 traffic maintenance aggregate (vehicular measurement) 25.0    cu m 50.00 1,250.00 109.00 2,725.00 75.00 1,875.00 130.00 3,250.00
502-01 superpave asphaltic concrete 279.6    Mg 205.00 57,318.00 236.00 65,985.60 240.00 67,104.00 375.00 104,850.00
701-02-B cross drain pipe arch (450 mm equiv. rcpa) 12.5    ln m 125.00 1,562.50 138.00 1,725.00 560.00 7,000.00 415.00 5,187.50
701-05-G side drain pipe (450 mm) 5.0    ln m 125.00 625.00 137.00 685.00 480.00 2,400.00 525.00 2,625.00
701-05-G-01 side drain pipe (450 mm) (erosion) 8.0    ln m 118.00 944.00 139.00 1,112.00 340.00 2,720.00 525.00 4,200.00
701-05-I side drain pipe (600 mm) 6.0    ln m 118.00 708.00 167.00 1,002.00 485.00 2,910.00 530.00 3,180.00
704-08-B guard rail transitions (double thrie beam) 30.48   ln m 175.00 5,334.00 189.00 5,760.72 210.00 6,400.80 245.00 7,467.60
704-09 guard rail anchor sections (turndown) 30.48   ln m 105.00 3,200.40 113.00 3,444.24 185.00 5,638.80 200.00 6,096.00
705-01 barbed wire fence 80      ln m 20.00 1,600.00 23.00 1,840.00 21.00 1,680.00 26.00 2,080.00
705-09 rebuilt fence 85      ln m 65.00 5,525.00 13.00 1,105.00 68.00 5,780.00 94.00 7,990.00
712-04 flexible revetment 500      sq m 63.00 31,500.00 88.00 44,000.00 73.00 36,500.00 90.00 45,000.00
713-01 temporary signs and barricades lump      lump 17,500.00 17,500.00 12,420.00 12,420.00 35,000.00 35,000.00 17,000.00 17,000.00
716-01-A vegetative mulch 1,837.0    kg 0.50 918.50 1.50 2,755.50 0.55 1,010.35 2.76 5,070.12
717-01 seeding 21      kg 16.40 344.40 76.00 1,596.00 17.00 357.00 70.00 1,470.00
718-01 fertilizer 467      kg 0.75 350.25 3.45 1,611.15 0.80 373.60 2.25 1,050.75
725-03 low profile runaround 1      ea 35,000.00 35,000.00 2,865.00 2,865.00 35,000.00 35,000.00 30,000.00 30,000.00
726-01 bedding material 52.0    cu m 85.00 4,420.00 150.00 7,800.00 135.00 7,020.00 150.00 7,800.00
727-01 mobilization lump      lump 83,000.00 83,000.00 115,413.00 115,413.00 95,000.00 95,000.00 90,000.00 90,000.00
729-16-B object marker assembly (type 2) 6      each 70.00 420.00 81.00 486.00 75.00 450.00 100.00 600.00
729-16-C object marker assembly (type 3) 8      each 100.00 800.00 98.00 784.00 75.00 600.00 100.00 800.00
735-01 mailboxes 1      each 1.00 1.00 14.00 14.00 25.00 25.00 100.00 100.00
735-02 mailbox supports (single) 1      each 800.00 800.00 161.00 161.00 125.00 125.00 100.00 100.00
740-01 construction layout lump      lump 7,500.00 7,500.00 42,550.00 42,550.00 25,000.00 25,000.00 20,000.00 20,000.00
804-01-B precast concrete piles (350mm) 325.5    ln m 190.00 61,845.00 285.00 92,767.50 215.00 69,982.50 180.00 58,590.00
804-12 loading permanent piles 1      each 1.00 1.00 1,150.00 1,150.00 5,000.00 5,000.00 1.00 1.00
805-01-B class a concrete (box culvert headwalls) 28.00   cu m 1,600.00 44,800.00 1,181.00 33,068.00 1,200.00 33,600.00 1,500.00 42,000.00
805-10-A bridge superstructure and substructure(7.3 m clr.
rdwy.;90 degree crossing)
6      span 28,000.00 168,000.00 35,825.00 214,950.00 25,000.00 150,000.00 32,000.00 192,000.00
805-12-P reinforced concrete box culverts (2100mm x 2100mm) 42.30   ln m 2,250.00 95,175.00 2,501.00 105,792.30 2,400.00 101,520.00 2,700.00 114,210.00
806-01 deformed reinforcing steel 1,285      kg 3.00 3,855.00 3.86 4,960.10 5.00 6,425.00 8.80 11,308.00
S-101 concrete approach slabs (7.3m clear rdwy: 90 deg.
crossing)
2      each 8,200.00 16,400.00 8,700.00 17,400.00 8,500.00 17,000.00 10,000.00 20,000.00
S-102 vibration monitoring lump      lump 5,000.00 5,000.00 7,500.00 7,500.00 1,200.00 1,200.00 10,000.00 10,000.00
                       
 CONTRACTOR TOTAL       793,696.05   897,624.61   959,978.05   964,596.47
 
Item Number Item Description Quantity Unit of Measure - 5 -
C W & W CONTRACTORS, INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 10,000.00 10,000.00            
202-02-A-01 removal of bridge (sta. 3+012.22, 6.10m x24.44m,7-span
timber bridge)
1      each 7,500.00 7,500.00            
202-02-A-02 removal of bridge (sta. 3+008.55, 4.90m x17.10m,5-span
timber bridge)
1      each 5,000.00 5,000.00            
203-05 excavation and embankment lump      lump 70,000.00 70,000.00            
204-02 temporary baled hay or straw 14      each 10.00 140.00            
204-03 temporary slope drains 40      ln m 45.00 1,800.00            
204-06 temporary silt fencing 625      ln m 10.00 6,250.00            
302-01 class ii base course 326.1    cu m 125.00 40,762.50            
401-02 aggregate surface course (adjusted vehicular
measurement)
2      cu m 125.00 250.00            
402-01 traffic maintenance aggregate (vehicular measurement) 25.0    cu m 125.00 3,125.00            
502-01 superpave asphaltic concrete 279.6    Mg 260.00 72,696.00            
701-02-B cross drain pipe arch (450 mm equiv. rcpa) 12.5    ln m 300.00 3,750.00            
701-05-G side drain pipe (450 mm) 5.0    ln m 220.00 1,100.00            
701-05-G-01 side drain pipe (450 mm) (erosion) 8.0    ln m 220.00 1,760.00            
701-05-I side drain pipe (600 mm) 6.0    ln m 280.00 1,680.00            
704-08-B guard rail transitions (double thrie beam) 30.48   ln m 225.00 6,858.00            
704-09 guard rail anchor sections (turndown) 30.48   ln m 135.00 4,114.80            
705-01 barbed wire fence 80      ln m 25.00 2,000.00            
705-09 rebuilt fence 85      ln m 85.00 7,225.00            
712-04 flexible revetment 500      sq m 125.00 62,500.00            
713-01 temporary signs and barricades lump      lump 20,000.00 20,000.00            
716-01-A vegetative mulch 1,837.0    kg 0.70 1,285.90            
717-01 seeding 21      kg 20.00 420.00            
718-01 fertilizer 467      kg 1.00 467.00            
725-03 low profile runaround 1      ea 75,000.00 75,000.00            
726-01 bedding material 52.0    cu m 150.00 7,800.00            
727-01 mobilization lump      lump 100,000.00 100,000.00            
729-16-B object marker assembly (type 2) 6      each 90.00 540.00            
729-16-C object marker assembly (type 3) 8      each 110.00 880.00            
735-01 mailboxes 1      each 15.00 15.00            
735-02 mailbox supports (single) 1      each 175.00 175.00            
740-01 construction layout lump      lump 25,000.00 25,000.00            
804-01-B precast concrete piles (350mm) 325.5    ln m 365.00 118,807.50            
804-12 loading permanent piles 1      each 1.00 1.00            
805-01-B class a concrete (box culvert headwalls) 28.00   cu m 1,500.00 42,000.00            
805-10-A bridge superstructure and substructure(7.3 m clr.
rdwy.;90 degree crossing)
6      span 25,000.00 150,000.00            
805-12-P reinforced concrete box culverts (2100mm x 2100mm) 42.30   ln m 3,150.00 133,245.00            
806-01 deformed reinforcing steel 1,285      kg 5.00 6,425.00            
S-101 concrete approach slabs (7.3m clear rdwy: 90 deg.
crossing)
2      each 10,000.00 20,000.00            
S-102 vibration monitoring lump      lump 10,000.00 10,000.00            
                       
 CONTRACTOR TOTAL       1,020,572.70            