| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DENTON-JAMES LLC |
- 2 - BEST-YET BUILDERS, LLC |
- 3 - INTERSTATE HIGHWAY CONSTRUCTION INC |
- 4 - JAMES CONSTRUCTION GROUP LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
600,000.00 |
600,000.00 |
20,000.00 |
20,000.00 |
9,712.98 |
9,712.98 |
200,000.00 |
200,000.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
5,296.0 |
SQYD |
3.40 |
18,006.40 |
6.00 |
31,776.00 |
5.08 |
26,903.68 |
5.00 |
26,480.00 |
| 202-02-01 |
removal of fence (440' w/dbl swing gate @ sta.
121+00 & 439' w/dbl swing gate @ sta. 182+00) |
879   |
LNFT |
3.00 |
2,637.00 |
2.00 |
1,758.00 |
1.45 |
1,274.55 |
3.00 |
2,637.00 |
| 203-01 |
general excavation
|
224,950   |
CUYD |
3.00 |
674,850.00 |
4.50 |
1,012,275.00 |
4.09 |
920,045.50 |
2.80 |
629,860.00 |
| 203-02 |
drainage excavation
|
1,948   |
CUYD |
6.00 |
11,688.00 |
10.00 |
19,480.00 |
5.08 |
9,895.84 |
12.50 |
24,350.00 |
| 203-03 |
embankment
|
53,826   |
CUYD |
1.60 |
86,121.60 |
8.00 |
430,608.00 |
5.05 |
271,821.30 |
7.25 |
390,238.50 |
| 203-04 |
nonplastic embankment
|
4,786   |
CUYD |
90.00 |
430,740.00 |
80.00 |
382,880.00 |
118.98 |
569,438.28 |
70.00 |
335,020.00 |
| 204-06 |
temporary silt fencing
|
37,682   |
LNFT |
1.80 |
67,827.60 |
2.00 |
75,364.00 |
1.59 |
59,914.38 |
2.25 |
84,784.50 |
| 302-02-A-01 |
class ii base course (4" thick)(stone or recycled pccp)
|
102,545.4 |
SQYD |
12.50 |
1,281,817.50 |
7.25 |
743,454.15 |
12.22 |
1,253,104.79 |
9.00 |
922,908.60 |
| 302-02-B |
class ii base course (8 1/2" thick)
|
29,846.9 |
SQYD |
19.00 |
567,091.10 |
8.50 |
253,698.65 |
23.48 |
700,805.21 |
9.00 |
268,622.10 |
| 302-02-B-01 |
class ii base course (6" thick)(soil cement)
|
136,868.2 |
SQYD |
5.60 |
766,461.92 |
6.50 |
889,643.30 |
6.42 |
878,693.84 |
6.00 |
821,209.20 |
| 302-02-G |
class ii base course (5" thick) (stone or recycled
pccp) |
40,976.0 |
SQYD |
9.00 |
368,784.00 |
8.35 |
342,149.60 |
15.77 |
646,191.52 |
15.00 |
614,640.00 |
| 304-01 |
lime
|
211.53 |
TON |
170.00 |
35,960.10 |
160.00 |
33,844.80 |
176.84 |
37,406.97 |
162.00 |
34,267.86 |
| 304-04-D |
lime treatment (type d) (12" thick)
|
14,923   |
SQYD |
1.20 |
17,907.60 |
2.00 |
29,846.00 |
6.73 |
100,431.79 |
1.00 |
14,923.00 |
| 305-01-D |
subgrade layer (12" thick)
|
136,868   |
SQYD |
8.20 |
1,122,317.60 |
8.00 |
1,094,944.00 |
14.24 |
1,949,000.32 |
7.50 |
1,026,510.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
162   |
CUYD |
110.00 |
17,820.00 |
60.00 |
9,720.00 |
94.85 |
15,365.70 |
25.00 |
4,050.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
1,000.0 |
CUYD |
78.00 |
78,000.00 |
0.10 |
100.00 |
39.04 |
39,040.00 |
85.00 |
85,000.00 |
| 502-01 |
superpave asphaltic concrete
|
7,979.7 |
TON |
120.00 |
957,564.00 |
115.00 |
917,665.50 |
119.58 |
954,212.53 |
118.00 |
941,604.60 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
104.4 |
TON |
225.00 |
23,490.00 |
125.00 |
13,050.00 |
225.51 |
23,543.24 |
223.00 |
23,281.20 |
| 509-01 |
cold planing asphaltic pavement
|
5,776   |
SQYD |
3.50 |
20,216.00 |
3.00 |
17,328.00 |
2.40 |
13,862.40 |
2.11 |
12,188.52 |
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
192   |
LNFT |
75.00 |
14,400.00 |
70.00 |
13,440.00 |
88.51 |
16,993.92 |
90.00 |
17,280.00 |
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
442   |
LNFT |
58.00 |
25,636.00 |
36.00 |
15,912.00 |
69.49 |
30,714.58 |
55.00 |
24,310.00 |
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
230   |
LNFT |
52.00 |
11,960.00 |
40.00 |
9,200.00 |
77.67 |
17,864.10 |
55.00 |
12,650.00 |
| 701-05-G |
side drain pipe (18")
|
354   |
LNFT |
55.00 |
19,470.00 |
40.00 |
14,160.00 |
78.69 |
27,856.26 |
58.00 |
20,532.00 |
| 701-05-I |
side drain pipe (24")
|
122   |
LNFT |
60.00 |
7,320.00 |
70.00 |
8,540.00 |
99.65 |
12,157.30 |
73.00 |
8,906.00 |
| 702-03-A |
catch basins (cb-01)
|
1   |
EACH |
3,000.00 |
3,000.00 |
3,000.00 |
3,000.00 |
3,818.31 |
3,818.31 |
5,400.00 |
5,400.00 |
| 702-03-C |
catch basins (cb-06)
|
6   |
EACH |
4,000.00 |
24,000.00 |
4,000.00 |
24,000.00 |
4,105.40 |
24,632.40 |
5,600.00 |
33,600.00 |
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
325.0 |
LNFT |
48.00 |
15,600.00 |
53.00 |
17,225.00 |
49.64 |
16,133.00 |
48.00 |
15,600.00 |
| 704-03 |
blocked out guard rail
|
968.8 |
LNFT |
22.00 |
21,313.60 |
24.00 |
23,251.20 |
22.24 |
21,546.11 |
21.50 |
20,829.20 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
250.0 |
LNFT |
65.00 |
16,250.00 |
72.00 |
18,000.00 |
67.23 |
16,807.50 |
65.00 |
16,250.00 |
| 704-11-A |
guard rail end treatment (flared)
|
10   |
EACH |
2,000.00 |
20,000.00 |
2,200.00 |
22,000.00 |
2,068.53 |
20,685.30 |
2,000.00 |
20,000.00 |
| 704-11-C |
guard rail end treatment (bi-directional)
|
4   |
EACH |
4,500.00 |
18,000.00 |
4,950.00 |
19,800.00 |
4,654.20 |
18,616.80 |
4,500.00 |
18,000.00 |
| 705-02 |
combination mesh & barbed wire fence
|
2,300   |
LNFT |
6.00 |
13,800.00 |
7.00 |
16,100.00 |
6.21 |
14,283.00 |
6.00 |
13,800.00 |
| 705-04 |
single swinging driveway gates
|
1   |
EACH |
600.00 |
600.00 |
700.00 |
700.00 |
620.56 |
620.56 |
600.00 |
600.00 |
| 705-09 |
rebuilt fence
|
1,400   |
LNFT |
8.00 |
11,200.00 |
8.80 |
12,320.00 |
8.27 |
11,578.00 |
8.00 |
11,200.00 |
| 706-03-A |
incidental concrete paving (4" thick)
|
1,010.4 |
SQYD |
55.00 |
55,572.00 |
60.00 |
60,624.00 |
52.43 |
52,975.27 |
38.00 |
38,395.20 |
| 706-03-C |
incidental concrete paving (6" thick)
|
96.1 |
SQYD |
75.00 |
7,207.50 |
75.00 |
7,207.50 |
98.63 |
9,478.34 |
60.00 |
5,766.00 |
| 707-01 |
concrete curb
|
2,648.0 |
LNFT |
12.00 |
31,776.00 |
8.00 |
21,184.00 |
18.89 |
50,020.72 |
4.00 |
10,592.00 |
| 711-02-E |
riprap (130 lb)
|
368   |
CUYD |
100.00 |
36,800.00 |
120.00 |
44,160.00 |
118.72 |
43,688.96 |
100.00 |
36,800.00 |
| 711-04 |
geotextile fabric
|
508   |
SQYD |
2.00 |
1,016.00 |
2.00 |
1,016.00 |
3.26 |
1,656.08 |
11.00 |
5,588.00 |
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
2,538   |
SQYD |
60.00 |
152,280.00 |
63.00 |
159,894.00 |
63.97 |
162,355.86 |
68.00 |
172,584.00 |
| 712-03 |
stone revetment
|
159   |
SQYD |
80.00 |
12,720.00 |
100.00 |
15,900.00 |
71.23 |
11,325.57 |
75.00 |
11,925.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
80,000.00 |
80,000.00 |
100,000.00 |
100,000.00 |
30,124.27 |
30,124.27 |
37,000.00 |
37,000.00 |
| 716-01-A |
mulch (vegetative)
|
58.0 |
TON |
600.00 |
34,800.00 |
440.00 |
25,520.00 |
791.07 |
45,882.06 |
590.00 |
34,220.00 |
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
59,921.31 |
59,921.31 |
20,000.00 |
20,000.00 |
| 725-01 |
temporary detour roads
|
9,585.5 |
SQYD |
30.00 |
287,565.00 |
50.00 |
479,275.00 |
60.26 |
577,622.23 |
100.00 |
958,550.00 |
| 726-01 |
bedding material
|
626.8 |
CUYD |
65.00 |
40,742.00 |
70.00 |
43,876.00 |
82.10 |
51,460.28 |
92.00 |
57,665.60 |
| 727-01 |
mobilization
|
lump |
LUMP |
2,000,000.00 |
2,000,000.00 |
2,000,000.00 |
2,000,000.00 |
1,000,000.00 |
1,000,000.00 |
2,100,000.00 |
2,100,000.00 |
| 729-01 |
sign (type a)
|
302.0 |
SQFT |
35.00 |
10,570.00 |
25.00 |
7,550.00 |
45.19 |
13,647.38 |
40.00 |
12,080.00 |
| 729-04 |
sign (type d)
|
40.0 |
SQFT |
25.00 |
1,000.00 |
30.00 |
1,200.00 |
40.17 |
1,606.80 |
33.00 |
1,320.00 |
| 729-16-C |
object marker assembly (type 3)
|
161   |
EACH |
90.00 |
14,490.00 |
100.00 |
16,100.00 |
93.08 |
14,985.88 |
90.00 |
14,490.00 |
| 729-19-A |
dead end road installations(type a)
|
1   |
EACH |
2,000.00 |
2,000.00 |
2,000.00 |
2,000.00 |
2,008.28 |
2,008.28 |
2,000.00 |
2,000.00 |
| 729-21 |
u-channel post
|
62   |
EACH |
150.00 |
9,300.00 |
100.00 |
6,200.00 |
100.41 |
6,225.42 |
100.00 |
6,200.00 |
| 731-01 |
nonreflectorized raised pavement markers
|
447   |
EACH |
15.00 |
6,705.00 |
14.85 |
6,637.95 |
15.22 |
6,803.34 |
15.00 |
6,705.00 |
| 731-02 |
reflectorized raised pavement markers
|
2,525   |
EACH |
5.50 |
13,887.50 |
5.65 |
14,266.25 |
5.58 |
14,089.50 |
5.50 |
13,887.50 |
| 732-01-C |
plastic pavement striping (8" width)
|
2,461   |
LNFT |
1.00 |
2,461.00 |
1.05 |
2,584.05 |
1.01 |
2,485.61 |
1.00 |
2,461.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
1,385   |
LNFT |
4.50 |
6,232.50 |
4.35 |
6,024.75 |
4.57 |
6,329.45 |
4.50 |
6,232.50 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
17.046 |
MILE |
2,300.00 |
39,205.80 |
3,245.00 |
55,314.27 |
2,334.38 |
39,791.84 |
2,300.00 |
39,205.80 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.992 |
MILE |
850.00 |
843.20 |
1,015.00 |
1,006.88 |
862.71 |
855.81 |
850.00 |
843.20 |
| 739-01 |
hydro-seeding
|
38.61 |
ACRE |
1,200.00 |
46,332.00 |
1,485.00 |
57,335.85 |
1,541.91 |
59,533.15 |
1,150.00 |
44,401.50 |
| 740-01 |
construction layout
|
lump |
LUMP |
200,000.00 |
200,000.00 |
500,000.00 |
500,000.00 |
255,052.14 |
255,052.14 |
250,000.00 |
250,000.00 |
| 805-01-F |
class a concrete (bents)
|
645.87 |
CUYD |
640.00 |
413,356.80 |
600.00 |
387,522.00 |
609.23 |
393,483.38 |
680.00 |
439,191.60 |
| 805-03 |
class aa concrete
|
58.31 |
CUYD |
1,100.00 |
64,141.00 |
700.00 |
40,817.00 |
304.61 |
17,761.81 |
1,000.00 |
58,310.00 |
| 805-04 |
class aa(m) concrete
|
1,344.54 |
CUYD |
560.00 |
752,942.40 |
675.00 |
907,564.50 |
685.38 |
921,520.83 |
625.00 |
840,337.50 |
| 805-08-D |
precast-prestressed concrete girders (type iv)
|
4,775.4 |
LNFT |
160.00 |
764,064.00 |
182.00 |
869,122.80 |
184.80 |
882,493.92 |
190.00 |
907,326.00 |
| 805-11 |
strip seal joints
|
246.39 |
LNFT |
165.00 |
40,654.35 |
160.00 |
39,422.40 |
162.46 |
40,028.52 |
175.00 |
43,118.25 |
| 805-12-X |
reinforced concrete box culverts (10'x 10')
|
496.0 |
LNFT |
920.00 |
456,320.00 |
1,500.00 |
744,000.00 |
1,332.24 |
660,791.04 |
1,100.00 |
545,600.00 |
| 806-01 |
deformed reinforcing steel
|
237,639   |
LB |
1.00 |
237,639.00 |
0.82 |
194,863.98 |
0.83 |
197,240.37 |
1.10 |
261,402.90 |
| 806-02 |
deformed reinforcing steel (epoxy coated)
|
446,620   |
LB |
1.15 |
513,613.00 |
1.11 |
495,748.20 |
1.13 |
504,680.60 |
1.25 |
558,275.00 |
| 807-08 |
structural metalwork
|
lump |
LUMP |
8,000.00 |
8,000.00 |
9,000.00 |
9,000.00 |
9,138.41 |
9,138.41 |
10,000.00 |
10,000.00 |
| 810-01 |
concrete railing (barrier)
|
1,760.00 |
LNFT |
62.00 |
109,120.00 |
60.00 |
105,600.00 |
60.92 |
107,219.20 |
52.00 |
91,520.00 |
| 813-01 |
concrete approach slabs
|
1,332.08 |
SQYD |
220.00 |
293,057.60 |
175.00 |
233,114.00 |
177.69 |
236,697.30 |
210.00 |
279,736.80 |
| 814-01-B |
drilled shaft (24")
|
200.0 |
LNFT |
100.00 |
20,000.00 |
90.00 |
18,000.00 |
91.38 |
18,276.00 |
175.00 |
35,000.00 |
| 814-01-D |
drilled shaft (36")
|
440.0 |
LNFT |
180.00 |
79,200.00 |
180.00 |
79,200.00 |
182.77 |
80,418.80 |
225.00 |
99,000.00 |
| 814-01-G |
drilled shaft (72")
|
480.0 |
LNFT |
680.00 |
326,400.00 |
675.00 |
324,000.00 |
685.38 |
328,982.40 |
605.00 |
290,400.00 |
| 814-01-J |
drilled shaft (42")
|
960.0 |
LNFT |
220.00 |
211,200.00 |
242.00 |
232,320.00 |
245.72 |
235,891.20 |
235.00 |
225,600.00 |
| 814-01-K |
drilled shaft (66")
|
300.0 |
LNFT |
580.00 |
174,000.00 |
510.00 |
153,000.00 |
517.84 |
155,352.00 |
460.00 |
138,000.00 |
| 814-02-G |
trial shaft (72")
|
40.0 |
LNFT |
500.00 |
20,000.00 |
550.00 |
22,000.00 |
558.46 |
22,338.40 |
940.00 |
37,600.00 |
| 814-02-K |
trial shaft (66")
|
50.0 |
LNFT |
420.00 |
21,000.00 |
465.00 |
23,250.00 |
472.15 |
23,607.50 |
795.00 |
39,750.00 |
| 814-04-D |
crosshole sonic logging (36")
|
8   |
EACH |
300.00 |
2,400.00 |
10.00 |
80.00 |
10.15 |
81.20 |
5,000.00 |
40,000.00 |
| 814-04-G |
crosshole sonic logging (72")
|
12   |
EACH |
500.00 |
6,000.00 |
10.00 |
120.00 |
10.15 |
121.80 |
6,570.00 |
78,840.00 |
| 814-04-J |
crosshole sonic logging (42")
|
16   |
EACH |
350.00 |
5,600.00 |
10.00 |
160.00 |
10.15 |
162.40 |
2,000.00 |
32,000.00 |
| 814-04-K |
crosshole sonic logging (66")
|
6   |
EACH |
500.00 |
3,000.00 |
10.00 |
60.00 |
10.15 |
60.90 |
6,700.00 |
40,200.00 |
| S-001 |
rumble strips (ground-in)
|
4.7 |
MILE |
1,000.00 |
4,700.00 |
2,800.00 |
13,160.00 |
1,073.42 |
5,045.07 |
1,000.00 |
4,700.00 |
| S-003 |
precast concrete barrier (department furnished)
|
153   |
EACH |
170.00 |
26,010.00 |
300.00 |
45,900.00 |
152.31 |
23,303.43 |
135.00 |
20,655.00 |
| S-004 |
impact attenuators (kinetic)
|
1   |
EACH |
16,000.00 |
16,000.00 |
20,000.00 |
20,000.00 |
15,514.00 |
15,514.00 |
18,000.00 |
18,000.00 |
| S-101 |
test drilled shaft (72")
|
1   |
EACH |
26,000.00 |
26,000.00 |
35,000.00 |
35,000.00 |
35,538.27 |
35,538.27 |
75,000.00 |
75,000.00 |
| S-102 |
test drilled shaft (66")
|
1   |
EACH |
24,000.00 |
24,000.00 |
40,000.00 |
40,000.00 |
40,615.17 |
40,615.17 |
74,000.00 |
74,000.00 |
| S-103 |
load testing a drilled shaft
|
2   |
EACH |
75,000.00 |
150,000.00 |
85,000.00 |
170,000.00 |
86,307.23 |
172,614.46 |
95,000.00 |
190,000.00 |
| S-104 |
pier protection system
|
4   |
EACH |
65,000.00 |
260,000.00 |
60,000.00 |
240,000.00 |
60,922.75 |
243,691.00 |
30,000.00 |
120,000.00 |
| | SUBTOTAL GENERAL |
|
|
|
15,513,773.67 |
|
15,640,134.58 |
|
16,627,566.89 |
|
16,184,007.63 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
portland cement concrete pavement
|
|
|
|
|
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
12,047.4 |
TON |
80.00 |
963,792.00 |
120.00 |
1,445,688.00 |
100.84 |
1,214,859.82 |
100.00 |
1,204,740.00 |
| 601-01-M |
portland cement concrete pavement (11" thick)
|
96,659.4 |
SQYD |
45.50 |
4,398,002.70 |
50.00 |
4,832,970.00 |
43.36 |
4,191,151.58 |
48.00 |
4,639,651.20 |
| 601-04 |
portland cement concrete pavement coring
|
169   |
EACH |
100.00 |
16,900.00 |
100.00 |
16,900.00 |
39.84 |
6,732.96 |
120.00 |
20,280.00 |
| 732-03-A-01 |
plastic pvmt striping (broken line)(4"width)preformed
marking tape (type v) |
4.640 |
MILE |
3,300.00 |
15,312.00 |
4,675.00 |
21,692.00 |
3,298.59 |
15,305.46 |
3,250.00 |
15,080.00 |
| | SUBTOTAL ALT A1 |
|
|
|
5,394,006.70 |
|
6,317,250.00 |
|
5,428,049.82 |
|
5,879,751.20 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
superpave asphaltic concrete pavement
|
|
|
|
|
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
71,141.0 |
TON |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.640 |
MILE |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| S-002 |
rumble strips (ground-in)
|
4.5 |
MILE |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
20,907,780.37 |
|
21,957,384.58 |
|
22,055,616.71 |
|
22,063,758.83 |
| | NUMBER OF DAYS BID AT $1,000 PER DAY. |
|
|
|
365,000.00 |
|
550,000.00 |
|
425,000.00 |
|
750,000.00 |
| | LIFE CYCLE COST |
|
|
|
490,500.00 |
|
490,500.00 |
|
490,500.00 |
|
490,500.00 |
| | TOTAL BID |
|
|
|
21,763,280.37 |
|
22,997,884.58 |
|
22,971,116.71 |
|
23,304,258.83 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - AUSTIN BRIDGE & ROAD, LP |
- 6 - BLOUNT BROS. CONSTRUCTION, INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
101,943.26 |
101,943.26 |
200,000.00 |
200,000.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
5,296.0 |
SQYD |
6.00 |
31,776.00 |
4.50 |
23,832.00 |
|
|
|
|
| 202-02-01 |
removal of fence (440' w/dbl swing gate @ sta.
121+00 & 439' w/dbl swing gate @ sta. 182+00) |
879   |
LNFT |
12.00 |
10,548.00 |
2.00 |
1,758.00 |
|
|
|
|
| 203-01 |
general excavation
|
224,950   |
CUYD |
5.95 |
1,338,452.50 |
4.00 |
899,800.00 |
|
|
|
|
| 203-02 |
drainage excavation
|
1,948   |
CUYD |
13.45 |
26,200.60 |
10.00 |
19,480.00 |
|
|
|
|
| 203-03 |
embankment
|
53,826   |
CUYD |
5.90 |
317,573.40 |
8.00 |
430,608.00 |
|
|
|
|
| 203-04 |
nonplastic embankment
|
4,786   |
CUYD |
93.00 |
445,098.00 |
10.00 |
47,860.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
37,682   |
LNFT |
1.65 |
62,175.30 |
2.00 |
75,364.00 |
|
|
|
|
| 302-02-A-01 |
class ii base course (4" thick)(stone or recycled pccp)
|
102,545.4 |
SQYD |
8.85 |
907,526.79 |
10.00 |
1,025,454.00 |
|
|
|
|
| 302-02-B |
class ii base course (8 1/2" thick)
|
29,846.9 |
SQYD |
18.90 |
564,106.41 |
20.00 |
596,938.00 |
|
|
|
|
| 302-02-B-01 |
class ii base course (6" thick)(soil cement)
|
136,868.2 |
SQYD |
7.90 |
1,081,258.78 |
10.00 |
1,368,682.00 |
|
|
|
|
| 302-02-G |
class ii base course (5" thick) (stone or recycled
pccp) |
40,976.0 |
SQYD |
11.00 |
450,736.00 |
15.00 |
614,640.00 |
|
|
|
|
| 304-01 |
lime
|
211.53 |
TON |
170.00 |
35,960.10 |
160.00 |
33,844.80 |
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
14,923   |
SQYD |
0.90 |
13,430.70 |
2.00 |
29,846.00 |
|
|
|
|
| 305-01-D |
subgrade layer (12" thick)
|
136,868   |
SQYD |
9.50 |
1,300,246.00 |
12.00 |
1,642,416.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
162   |
CUYD |
90.00 |
14,580.00 |
60.00 |
9,720.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
1,000.0 |
CUYD |
78.50 |
78,500.00 |
60.00 |
60,000.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
7,979.7 |
TON |
133.50 |
1,065,289.95 |
100.00 |
797,970.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
104.4 |
TON |
250.00 |
26,100.00 |
250.00 |
26,100.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
5,776   |
SQYD |
2.50 |
14,440.00 |
3.00 |
17,328.00 |
|
|
|
|
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
192   |
LNFT |
65.00 |
12,480.00 |
60.00 |
11,520.00 |
|
|
|
|
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
442   |
LNFT |
50.00 |
22,100.00 |
30.00 |
13,260.00 |
|
|
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
230   |
LNFT |
42.00 |
9,660.00 |
40.00 |
9,200.00 |
|
|
|
|
| 701-05-G |
side drain pipe (18")
|
354   |
LNFT |
49.00 |
17,346.00 |
35.00 |
12,390.00 |
|
|
|
|
| 701-05-I |
side drain pipe (24")
|
122   |
LNFT |
57.00 |
6,954.00 |
60.00 |
7,320.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
1   |
EACH |
3,400.00 |
3,400.00 |
4,000.00 |
4,000.00 |
|
|
|
|
| 702-03-C |
catch basins (cb-06)
|
6   |
EACH |
4,000.00 |
24,000.00 |
4,500.00 |
27,000.00 |
|
|
|
|
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
325.0 |
LNFT |
65.00 |
21,125.00 |
60.00 |
19,500.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
968.8 |
LNFT |
25.00 |
24,220.00 |
28.00 |
27,126.40 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
250.0 |
LNFT |
65.00 |
16,250.00 |
80.00 |
20,000.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
10   |
EACH |
2,500.00 |
25,000.00 |
2,500.00 |
25,000.00 |
|
|
|
|
| 704-11-C |
guard rail end treatment (bi-directional)
|
4   |
EACH |
5,000.00 |
20,000.00 |
4,500.00 |
18,000.00 |
|
|
|
|
| 705-02 |
combination mesh & barbed wire fence
|
2,300   |
LNFT |
8.50 |
19,550.00 |
8.00 |
18,400.00 |
|
|
|
|
| 705-04 |
single swinging driveway gates
|
1   |
EACH |
800.00 |
800.00 |
800.00 |
800.00 |
|
|
|
|
| 705-09 |
rebuilt fence
|
1,400   |
LNFT |
11.00 |
15,400.00 |
10.00 |
14,000.00 |
|
|
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
1,010.4 |
SQYD |
38.00 |
38,395.20 |
50.00 |
50,520.00 |
|
|
|
|
| 706-03-C |
incidental concrete paving (6" thick)
|
96.1 |
SQYD |
70.00 |
6,727.00 |
55.00 |
5,285.50 |
|
|
|
|
| 707-01 |
concrete curb
|
2,648.0 |
LNFT |
16.00 |
42,368.00 |
7.00 |
18,536.00 |
|
|
|
|
| 711-02-E |
riprap (130 lb)
|
368   |
CUYD |
75.00 |
27,600.00 |
75.00 |
27,600.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
508   |
SQYD |
8.50 |
4,318.00 |
3.00 |
1,524.00 |
|
|
|
|
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
2,538   |
SQYD |
50.00 |
126,900.00 |
60.00 |
152,280.00 |
|
|
|
|
| 712-03 |
stone revetment
|
159   |
SQYD |
80.00 |
12,720.00 |
65.00 |
10,335.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
40,000.00 |
40,000.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
58.0 |
TON |
330.00 |
19,140.00 |
600.00 |
34,800.00 |
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
25,000.00 |
25,000.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| 725-01 |
temporary detour roads
|
9,585.5 |
SQYD |
55.00 |
527,202.50 |
80.00 |
766,840.00 |
|
|
|
|
| 726-01 |
bedding material
|
626.8 |
CUYD |
63.50 |
39,801.80 |
75.00 |
47,010.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
1,780,000.00 |
1,780,000.00 |
1,500,000.00 |
1,500,000.00 |
|
|
|
|
| 729-01 |
sign (type a)
|
302.0 |
SQFT |
12.00 |
3,624.00 |
25.00 |
7,550.00 |
|
|
|
|
| 729-04 |
sign (type d)
|
40.0 |
SQFT |
22.00 |
880.00 |
30.00 |
1,200.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
161   |
EACH |
115.00 |
18,515.00 |
125.00 |
20,125.00 |
|
|
|
|
| 729-19-A |
dead end road installations(type a)
|
1   |
EACH |
2,200.00 |
2,200.00 |
2,500.00 |
2,500.00 |
|
|
|
|
| 729-21 |
u-channel post
|
62   |
EACH |
150.00 |
9,300.00 |
100.00 |
6,200.00 |
|
|
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
447   |
EACH |
17.00 |
7,599.00 |
20.00 |
8,940.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,525   |
EACH |
6.00 |
15,150.00 |
7.00 |
17,675.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
2,461   |
LNFT |
1.15 |
2,830.15 |
1.50 |
3,691.50 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
1,385   |
LNFT |
5.00 |
6,925.00 |
5.50 |
7,617.50 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
17.046 |
MILE |
2,600.00 |
44,319.60 |
3,000.00 |
51,138.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.992 |
MILE |
955.00 |
947.36 |
1,000.00 |
992.00 |
|
|
|
|
| 739-01 |
hydro-seeding
|
38.61 |
ACRE |
1,400.00 |
54,054.00 |
1,600.00 |
61,776.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
400,000.00 |
400,000.00 |
200,000.00 |
200,000.00 |
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
645.87 |
CUYD |
700.00 |
452,109.00 |
800.00 |
516,696.00 |
|
|
|
|
| 805-03 |
class aa concrete
|
58.31 |
CUYD |
800.00 |
46,648.00 |
700.00 |
40,817.00 |
|
|
|
|
| 805-04 |
class aa(m) concrete
|
1,344.54 |
CUYD |
800.00 |
1,075,632.00 |
1,000.00 |
1,344,540.00 |
|
|
|
|
| 805-08-D |
precast-prestressed concrete girders (type iv)
|
4,775.4 |
LNFT |
179.00 |
854,796.60 |
225.00 |
1,074,465.00 |
|
|
|
|
| 805-11 |
strip seal joints
|
246.39 |
LNFT |
195.00 |
48,046.05 |
150.00 |
36,958.50 |
|
|
|
|
| 805-12-X |
reinforced concrete box culverts (10'x 10')
|
496.0 |
LNFT |
1,350.00 |
669,600.00 |
2,600.00 |
1,289,600.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
237,639   |
LB |
0.95 |
225,757.05 |
1.40 |
332,694.60 |
|
|
|
|
| 806-02 |
deformed reinforcing steel (epoxy coated)
|
446,620   |
LB |
1.15 |
513,613.00 |
1.80 |
803,916.00 |
|
|
|
|
| 807-08 |
structural metalwork
|
lump |
LUMP |
7,500.00 |
7,500.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 810-01 |
concrete railing (barrier)
|
1,760.00 |
LNFT |
80.00 |
140,800.00 |
100.00 |
176,000.00 |
|
|
|
|
| 813-01 |
concrete approach slabs
|
1,332.08 |
SQYD |
215.00 |
286,397.20 |
175.00 |
233,114.00 |
|
|
|
|
| 814-01-B |
drilled shaft (24")
|
200.0 |
LNFT |
98.00 |
19,600.00 |
200.00 |
40,000.00 |
|
|
|
|
| 814-01-D |
drilled shaft (36")
|
440.0 |
LNFT |
198.00 |
87,120.00 |
250.00 |
110,000.00 |
|
|
|
|
| 814-01-G |
drilled shaft (72")
|
480.0 |
LNFT |
730.00 |
350,400.00 |
700.00 |
336,000.00 |
|
|
|
|
| 814-01-J |
drilled shaft (42")
|
960.0 |
LNFT |
260.00 |
249,600.00 |
300.00 |
288,000.00 |
|
|
|
|
| 814-01-K |
drilled shaft (66")
|
300.0 |
LNFT |
615.00 |
184,500.00 |
600.00 |
180,000.00 |
|
|
|
|
| 814-02-G |
trial shaft (72")
|
40.0 |
LNFT |
740.00 |
29,600.00 |
1,000.00 |
40,000.00 |
|
|
|
|
| 814-02-K |
trial shaft (66")
|
50.0 |
LNFT |
575.00 |
28,750.00 |
900.00 |
45,000.00 |
|
|
|
|
| 814-04-D |
crosshole sonic logging (36")
|
8   |
EACH |
5,000.00 |
40,000.00 |
5,000.00 |
40,000.00 |
|
|
|
|
| 814-04-G |
crosshole sonic logging (72")
|
12   |
EACH |
6,000.00 |
72,000.00 |
6,000.00 |
72,000.00 |
|
|
|
|
| 814-04-J |
crosshole sonic logging (42")
|
16   |
EACH |
4,800.00 |
76,800.00 |
4,500.00 |
72,000.00 |
|
|
|
|
| 814-04-K |
crosshole sonic logging (66")
|
6   |
EACH |
6,500.00 |
39,000.00 |
5,800.00 |
34,800.00 |
|
|
|
|
| S-001 |
rumble strips (ground-in)
|
4.7 |
MILE |
450.00 |
2,115.00 |
5,000.00 |
23,500.00 |
|
|
|
|
| S-003 |
precast concrete barrier (department furnished)
|
153   |
EACH |
125.00 |
19,125.00 |
150.00 |
22,950.00 |
|
|
|
|
| S-004 |
impact attenuators (kinetic)
|
1   |
EACH |
20,000.00 |
20,000.00 |
30,000.00 |
30,000.00 |
|
|
|
|
| S-101 |
test drilled shaft (72")
|
1   |
EACH |
32,000.00 |
32,000.00 |
70,000.00 |
70,000.00 |
|
|
|
|
| S-102 |
test drilled shaft (66")
|
1   |
EACH |
31,000.00 |
31,000.00 |
69,000.00 |
69,000.00 |
|
|
|
|
| S-103 |
load testing a drilled shaft
|
2   |
EACH |
80,000.00 |
160,000.00 |
95,000.00 |
190,000.00 |
|
|
|
|
| S-104 |
pier protection system
|
4   |
EACH |
25,000.00 |
100,000.00 |
40,000.00 |
160,000.00 |
|
|
|
|
| | SUBTOTAL GENERAL |
|
|
|
17,243,252.30 |
|
18,945,343.80 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
portland cement concrete pavement
|
|
|
|
|
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
12,047.4 |
TON |
112.50 |
1,355,332.50 |
110.00 |
1,325,214.00 |
|
|
|
|
| 601-01-M |
portland cement concrete pavement (11" thick)
|
96,659.4 |
SQYD |
43.00 |
4,156,354.20 |
59.00 |
5,702,904.60 |
|
|
|
|
| 601-04 |
portland cement concrete pavement coring
|
169   |
EACH |
125.00 |
21,125.00 |
150.00 |
25,350.00 |
|
|
|
|
| 732-03-A-01 |
plastic pvmt striping (broken line)(4"width)preformed
marking tape (type v) |
4.640 |
MILE |
3,650.00 |
16,936.00 |
1,500.00 |
6,960.00 |
|
|
|
|
| | SUBTOTAL ALT A1 |
|
|
|
5,549,747.70 |
|
7,060,428.60 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
superpave asphaltic concrete pavement
|
|
|
|
|
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
71,141.0 |
TON |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.640 |
MILE |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| S-002 |
rumble strips (ground-in)
|
4.5 |
MILE |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
22,793,000.00 |
|
26,005,772.40 |
|
|
|
|
| | NUMBER OF DAYS BID AT $1,000 PER DAY. |
|
|
|
540,000.00 |
|
750,000.00 |
|
|
|
|
| | LIFE CYCLE COST |
|
|
|
490,500.00 |
|
490,500.00 |
|
|
|
|
| | TOTAL BID |
|
|
|
23,823,500.00 |
|
27,246,272.40 |
|
|
|
|
|