February 06, 2014 Error processing SSI file

Letting of 11/12/2008 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 450-90-0162
Parish: ORLEANS
Routes: I-10
Description: PARIS RD TO C.S.L.M. 21.24
Type Const: grading, cold planing asphaltic concrete, superpave asphaltic pavement, pavement
patching, and related work.
Estimated Construction Cost: $19,744,003.88
 
RankLicenseBidderConstruction Bid
1 06276 BARRIERE CONSTRUCTION CO., LLC $17,470,483.20
2 02179 BOH BROS. CONSTRUCTION CO., LLC. $18,221,884.65
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC
- 2 -
BOH BROS. CONSTRUCTION CO., LLC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-C removal of portland cement concrete pavement 150      SQYD 115.00 17,250.00 20.00 3,000.00        
202-02-H removal of guard rail 4,600      LNFT 4.50 20,700.00 5.00 23,000.00        
203-07 borrow (vehicular measurement) 6,500      CUYD 31.00 201,500.00 45.00 292,500.00        
502-01 superpave asphaltic concrete 127,135.1    TON 82.00 10,425,078.20 95.00 12,077,834.50        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
2,628.6    TON 181.00 475,776.60 120.00 315,432.00        
509-01 cold planing asphaltic pavement 92,789      SQYD 2.50 231,972.50 2.50 231,972.50        
509-02 contractor retained reclaimed asphaltic pavement - 3,866      CUYD 15.00 - 57,990.00 12.00 - 46,392.00        
510-01-A pavement patching (6" minimum thickness) 1,000      SQYD 70.00 70,000.00 75.00 75,000.00        
602-02-A cleaning and resealing existing longitudinal pavement
joints
188,000      LNFT 1.40 263,200.00 1.50 282,000.00        
602-02-B cleaning and resealing existing transverse pavement
joints
85,000      LNFT 1.55 131,750.00 1.70 144,500.00        
602-03 cleaning and sealing random cracks 10,000      LNFT 2.60 26,000.00 3.30 33,000.00        
602-05-K-01 full depth patching of jointed conc pvmt (10" thick)
(16.0 sq yds & under)
2,000.0    SQYD 230.00 460,000.00 270.00 540,000.00        
602-05-K-02 full depth patching of jointed conc pvmt (10" thick)
(16.1-48.0 sq yds)
300.0    SQYD 220.00 66,000.00 250.00 75,000.00        
602-05-K-03 full depth patching of jointed conc pvmt (10" thick)
(48.1 sq yds & over)
1,750.0    SQYD 200.00 350,000.00 230.00 402,500.00        
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 812.5    LNFT 45.00 36,562.50 50.00 40,625.00        
704-01-C guard rail (double thrie beam)(3'-1 1/2" post spacing) 181.3    LNFT 65.00 11,784.50 70.00 12,691.00        
704-03 blocked out guard rail 3,756.3    LNFT 20.00 75,126.00 22.00 82,638.60        
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
137.3    LNFT 89.00 12,219.70 95.00 13,043.50        
704-08-B guard rail transitions (double thrie beam) 300.0    LNFT 65.00 19,500.00 65.00 19,500.00        
704-11-A guard rail end treatment (flared) 34      EACH 3,000.00 102,000.00 2,700.00 91,800.00        
707-01 concrete curb 100.0    LNFT 26.00 2,600.00 25.00 2,500.00        
713-01 temporary signs & barricades lump      LUMP 1,488,500.00 1,488,500.00 350,000.00 350,000.00        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
106.800  MILE 250.00 26,700.00 400.00 42,720.00        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
73.840  MILE 330.00 24,367.20 420.00 31,012.80        
713-04-A temporary pavement markings (solid line)(4" width) 53.400  MILE 500.00 26,700.00 650.00 34,710.00        
717-01 seeding 960      LB 6.50 6,240.00 13.00 12,480.00        
718-01 fertilizer 32,000      LB 0.45 14,400.00 0.50 16,000.00        
721-01 mowing 160.0    ACRE 160.00 25,600.00 65.00 10,400.00        
727-01 mobilization lump      LUMP 1,747,000.00 1,747,000.00 1,800,000.00 1,800,000.00        
729-16-C object marker assembly (type 3) 56      EACH 80.00 4,480.00 85.00 4,760.00        
729-19-A dead end road installations(type a) 8      EACH 2,250.00 18,000.00 2,300.00 18,400.00        
731-02 reflectorized raised pavement markers 12,172      EACH 6.00 73,032.00 5.00 60,860.00        
732-01-C plastic pavement striping (8" width) 3,000      LNFT 1.00 3,000.00 1.00 3,000.00        
732-01-E plastic pavement striping (24" width) 205      LNFT 4.00 820.00 3.75 768.75        
732-02-A plastic pavement striping (solid line) (4" width) 17.800  MILE 3,000.00 53,400.00 2,000.00 35,600.00        
732-03-A plastic pavement striping (broken line)(4" width) 18.460  MILE 750.00 13,845.00 800.00 14,768.00        
732-04-A plastic pavement legend & symbols (arrow) 2      EACH 200.00 400.00 175.00 350.00        
740-01 construction layout lump      LUMP 40,000.00 40,000.00 12,000.00 12,000.00        
S-001 rumble strips (ground-in) 17.8    MILE 605.00 10,769.00 1,200.00 21,360.00        
S-002 dynamic message sign unit 2      EACH 15,000.00 30,000.00 40,000.00 80,000.00        
S-003 milling p.c.c. pavement (1.5" thick) 500.0    SQYD 150.00 75,000.00 75.00 37,500.00        
S-922 sawing and sealing longitudinal joints in asphaltic
concrete overlay
188,000      LNFT 1.15 216,200.00 1.25 235,000.00        
S-923 sawing and sealing transverse joints in asphaltic
concrete overlay
85,000      LNFT 1.00 85,000.00 1.35 114,750.00        
S-927 sawcuts in asphaltic concrete lifts 546,000      LNFT 1.00 546,000.00 1.05 573,300.00        
                       
 CONTRACTOR TOTAL       17,470,483.20   18,221,884.65        