| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-C |
removal of portland cement concrete pavement
|
150   |
SQYD |
115.00 |
17,250.00 |
20.00 |
3,000.00 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
4,600   |
LNFT |
4.50 |
20,700.00 |
5.00 |
23,000.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
6,500   |
CUYD |
31.00 |
201,500.00 |
45.00 |
292,500.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
127,135.1 |
TON |
82.00 |
10,425,078.20 |
95.00 |
12,077,834.50 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
2,628.6 |
TON |
181.00 |
475,776.60 |
120.00 |
315,432.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
92,789   |
SQYD |
2.50 |
231,972.50 |
2.50 |
231,972.50 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 3,866   |
CUYD |
15.00 |
- 57,990.00 |
12.00 |
- 46,392.00 |
|
|
|
|
| 510-01-A |
pavement patching (6" minimum thickness)
|
1,000   |
SQYD |
70.00 |
70,000.00 |
75.00 |
75,000.00 |
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
188,000   |
LNFT |
1.40 |
263,200.00 |
1.50 |
282,000.00 |
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
85,000   |
LNFT |
1.55 |
131,750.00 |
1.70 |
144,500.00 |
|
|
|
|
| 602-03 |
cleaning and sealing random cracks
|
10,000   |
LNFT |
2.60 |
26,000.00 |
3.30 |
33,000.00 |
|
|
|
|
| 602-05-K-01 |
full depth patching of jointed conc pvmt (10" thick)
(16.0 sq yds & under) |
2,000.0 |
SQYD |
230.00 |
460,000.00 |
270.00 |
540,000.00 |
|
|
|
|
| 602-05-K-02 |
full depth patching of jointed conc pvmt (10" thick)
(16.1-48.0 sq yds) |
300.0 |
SQYD |
220.00 |
66,000.00 |
250.00 |
75,000.00 |
|
|
|
|
| 602-05-K-03 |
full depth patching of jointed conc pvmt (10" thick)
(48.1 sq yds & over) |
1,750.0 |
SQYD |
200.00 |
350,000.00 |
230.00 |
402,500.00 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
812.5 |
LNFT |
45.00 |
36,562.50 |
50.00 |
40,625.00 |
|
|
|
|
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
181.3 |
LNFT |
65.00 |
11,784.50 |
70.00 |
12,691.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
3,756.3 |
LNFT |
20.00 |
75,126.00 |
22.00 |
82,638.60 |
|
|
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
137.3 |
LNFT |
89.00 |
12,219.70 |
95.00 |
13,043.50 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
300.0 |
LNFT |
65.00 |
19,500.00 |
65.00 |
19,500.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
34   |
EACH |
3,000.00 |
102,000.00 |
2,700.00 |
91,800.00 |
|
|
|
|
| 707-01 |
concrete curb
|
100.0 |
LNFT |
26.00 |
2,600.00 |
25.00 |
2,500.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
1,488,500.00 |
1,488,500.00 |
350,000.00 |
350,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
106.800 |
MILE |
250.00 |
26,700.00 |
400.00 |
42,720.00 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
73.840 |
MILE |
330.00 |
24,367.20 |
420.00 |
31,012.80 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
53.400 |
MILE |
500.00 |
26,700.00 |
650.00 |
34,710.00 |
|
|
|
|
| 717-01 |
seeding
|
960   |
LB |
6.50 |
6,240.00 |
13.00 |
12,480.00 |
|
|
|
|
| 718-01 |
fertilizer
|
32,000   |
LB |
0.45 |
14,400.00 |
0.50 |
16,000.00 |
|
|
|
|
| 721-01 |
mowing
|
160.0 |
ACRE |
160.00 |
25,600.00 |
65.00 |
10,400.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
1,747,000.00 |
1,747,000.00 |
1,800,000.00 |
1,800,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
56   |
EACH |
80.00 |
4,480.00 |
85.00 |
4,760.00 |
|
|
|
|
| 729-19-A |
dead end road installations(type a)
|
8   |
EACH |
2,250.00 |
18,000.00 |
2,300.00 |
18,400.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
12,172   |
EACH |
6.00 |
73,032.00 |
5.00 |
60,860.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
3,000   |
LNFT |
1.00 |
3,000.00 |
1.00 |
3,000.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
205   |
LNFT |
4.00 |
820.00 |
3.75 |
768.75 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
17.800 |
MILE |
3,000.00 |
53,400.00 |
2,000.00 |
35,600.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
18.460 |
MILE |
750.00 |
13,845.00 |
800.00 |
14,768.00 |
|
|
|
|
| 732-04-A |
plastic pavement legend & symbols (arrow)
|
2   |
EACH |
200.00 |
400.00 |
175.00 |
350.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
40,000.00 |
40,000.00 |
12,000.00 |
12,000.00 |
|
|
|
|
| S-001 |
rumble strips (ground-in)
|
17.8 |
MILE |
605.00 |
10,769.00 |
1,200.00 |
21,360.00 |
|
|
|
|
| S-002 |
dynamic message sign unit
|
2   |
EACH |
15,000.00 |
30,000.00 |
40,000.00 |
80,000.00 |
|
|
|
|
| S-003 |
milling p.c.c. pavement (1.5" thick)
|
500.0 |
SQYD |
150.00 |
75,000.00 |
75.00 |
37,500.00 |
|
|
|
|
| S-922 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
188,000   |
LNFT |
1.15 |
216,200.00 |
1.25 |
235,000.00 |
|
|
|
|
| S-923 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
85,000   |
LNFT |
1.00 |
85,000.00 |
1.35 |
114,750.00 |
|
|
|
|
| S-927 |
sawcuts in asphaltic concrete lifts
|
546,000   |
LNFT |
1.00 |
546,000.00 |
1.05 |
573,300.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
17,470,483.20 |
|
18,221,884.65 |
|
|
|
|
|