| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - H & S CONSTRUCTION CO., INC. |
- 2 - M. MATT DURAND, LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
60   |
SQYD |
20.00 |
1,200.00 |
14.75 |
885.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
150   |
CUYD |
22.00 |
3,300.00 |
19.75 |
2,962.50 |
|
|
|
|
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
900   |
CUYD |
16.50 |
14,850.00 |
14.00 |
12,600.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
20   |
EACH |
150.00 |
3,000.00 |
178.00 |
3,560.00 |
|
|
|
|
| 303-01-B |
in-place cement stabilized base course (8 1/2" thick)
|
43,916   |
SQYD |
7.15 |
313,999.40 |
7.50 |
329,370.00 |
|
|
|
|
| 303-02 |
removal of existing patches
|
250   |
SQYD |
16.50 |
4,125.00 |
10.00 |
2,500.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
25   |
CUYD |
80.00 |
2,000.00 |
84.00 |
2,100.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
8,045.3 |
TON |
104.00 |
836,711.20 |
125.00 |
1,005,662.50 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
525.0 |
TON |
145.00 |
76,125.00 |
138.00 |
72,450.00 |
|
|
|
|
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
28,770   |
GAL |
4.65 |
133,780.50 |
5.70 |
163,989.00 |
|
|
|
|
| 507-02-B |
aggregate (s2)
|
42,309   |
SQYD |
1.50 |
63,463.50 |
1.65 |
69,809.85 |
|
|
|
|
| 507-02-C |
aggregate (s3)
|
42,309   |
SQYD |
1.25 |
52,886.25 |
1.32 |
55,847.88 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
32,664   |
SQYD |
2.50 |
81,660.00 |
1.60 |
52,262.40 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,722   |
CUYD |
0.01 |
- 27.22 |
2.00 |
- 5,444.00 |
|
|
|
|
| 701-08 |
relaying pipe
|
32   |
LNFT |
90.00 |
2,880.00 |
200.00 |
6,400.00 |
|
|
|
|
| 706-02-A |
concrete drive (4" thick)
|
10.0 |
SQYD |
250.00 |
2,500.00 |
210.00 |
2,100.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
25,000.00 |
25,000.00 |
75,000.00 |
75,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
5.450 |
MILE |
568.00 |
3,095.60 |
0.25 |
1.36 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
5.246 |
MILE |
303.00 |
1,589.54 |
326.00 |
1,710.20 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
12.953 |
MILE |
468.00 |
6,062.00 |
504.00 |
6,528.31 |
|
|
|
|
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
712   |
EACH |
1.10 |
783.20 |
2.40 |
1,708.80 |
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
3,300.00 |
3,300.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| 726-01 |
bedding material
|
10.0 |
CUYD |
110.00 |
1,100.00 |
124.00 |
1,240.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
100,000.00 |
100,000.00 |
47,000.00 |
47,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
3   |
EACH |
66.00 |
198.00 |
69.00 |
207.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
360   |
EACH |
5.65 |
2,034.00 |
6.00 |
2,160.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
6.477 |
MILE |
2,871.00 |
18,595.47 |
3,101.00 |
20,085.18 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.623 |
MILE |
792.00 |
2,077.42 |
854.00 |
2,240.04 |
|
|
|
|
| 735-01 |
mailboxes
|
43   |
EACH |
1.10 |
47.30 |
6.00 |
258.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
43   |
EACH |
110.00 |
4,730.00 |
118.00 |
5,074.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
4   |
EACH |
143.00 |
572.00 |
437.00 |
1,748.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
5,500.00 |
5,500.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| S-001 |
cement treatment (10" thick)
|
10,000   |
SQYD |
5.83 |
58,300.00 |
9.00 |
90,000.00 |
|
|
|
|
| S-002 |
full depth sawcutting of existing portland cement
concrete drives |
600   |
INFT |
1.50 |
900.00 |
1.50 |
900.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,826,338.16 |
|
2,097,916.02 |
|
|
|
|
|