| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
4,000.00 |
4,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
303   |
LNFT |
10.00 |
3,030.00 |
18.00 |
5,454.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
540   |
CUYD |
45.00 |
24,300.00 |
36.00 |
19,440.00 |
|
|
|
|
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
876   |
CUYD |
18.00 |
15,768.00 |
24.00 |
21,024.00 |
|
|
|
|
| 308-01-A |
in-place cement treated base course (12" thick)
|
50,528   |
SQYD |
12.00 |
606,336.00 |
13.55 |
684,654.40 |
|
|
|
|
| 308-01-B |
in-place cement treated base course (14" thick)
|
5,336   |
SQYD |
14.00 |
74,704.00 |
16.13 |
86,069.68 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
30   |
CUYD |
250.00 |
7,500.00 |
165.00 |
4,950.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
457.9 |
CUYD |
65.00 |
29,763.50 |
77.00 |
35,258.30 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
5,195.7 |
TON |
128.00 |
665,049.60 |
127.00 |
659,853.90 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
98.2 |
TON |
200.00 |
19,640.00 |
250.00 |
24,550.00 |
|
|
|
|
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
8,659   |
GAL |
4.25 |
36,800.75 |
5.35 |
46,325.65 |
|
|
|
|
| 507-02-C |
aggregate (s3)
|
27,932   |
SQYD |
1.00 |
27,932.00 |
2.00 |
55,864.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
642   |
SQYD |
15.00 |
9,630.00 |
20.00 |
12,840.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 38   |
CUYD |
0.01 |
- 0.38 |
0.10 |
- 3.80 |
|
|
|
|
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
8   |
LNFT |
150.00 |
1,200.00 |
135.00 |
1,080.00 |
|
|
|
|
| 701-01-M |
cross drain pipe (36" rcp/pcp)
|
52   |
LNFT |
225.00 |
11,700.00 |
210.00 |
10,920.00 |
|
|
|
|
| 701-15 |
concrete collar
|
3   |
EACH |
700.00 |
2,100.00 |
650.00 |
1,950.00 |
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
50.0 |
LNFT |
50.00 |
2,500.00 |
50.00 |
2,500.00 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
114.0 |
LNFT |
65.00 |
7,410.00 |
65.00 |
7,410.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
50.0 |
LNFT |
30.00 |
1,500.00 |
30.00 |
1,500.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,500.00 |
10,000.00 |
2,250.00 |
9,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
130,000.00 |
130,000.00 |
65,000.00 |
65,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
6.675 |
MILE |
250.00 |
1,668.75 |
150.00 |
1,001.25 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
5.526 |
MILE |
200.00 |
1,105.20 |
310.00 |
1,713.06 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
16.398 |
MILE |
1.00 |
16.40 |
625.00 |
10,248.75 |
|
|
|
|
| 713-05-D |
temporary pavement legends and symbols (rr crossing)
|
6   |
EACH |
150.00 |
900.00 |
225.00 |
1,350.00 |
|
|
|
|
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
275   |
EACH |
2.00 |
550.00 |
2.25 |
618.75 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
8.6 |
TON |
400.00 |
3,440.00 |
400.00 |
3,440.00 |
|
|
|
|
| 717-01 |
seeding
|
194   |
LB |
8.00 |
1,552.00 |
8.00 |
1,552.00 |
|
|
|
|
| 718-01 |
fertilizer
|
4,314   |
LB |
0.45 |
1,941.30 |
0.50 |
2,157.00 |
|
|
|
|
| 726-01 |
bedding material
|
14.7 |
CUYD |
100.00 |
1,470.00 |
110.00 |
1,617.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
190,000.00 |
190,000.00 |
170,000.00 |
170,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
5   |
EACH |
100.00 |
500.00 |
80.00 |
400.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
100.00 |
400.00 |
80.00 |
320.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
295   |
EACH |
16.00 |
4,720.00 |
5.00 |
1,475.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
5.467 |
MILE |
4,000.00 |
21,868.00 |
3,000.00 |
16,401.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.842 |
MILE |
3,000.00 |
5,526.00 |
650.00 |
1,197.30 |
|
|
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
2   |
EACH |
1,200.00 |
2,400.00 |
450.00 |
900.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
10,600.00 |
10,600.00 |
|
|
|
|
| S-001 |
cleaning existing ditches
|
375   |
LNFT |
18.00 |
6,750.00 |
11.00 |
4,125.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,950,671.12 |
|
1,994,756.24 |
|
|
|
|
|