| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
1,500.00 |
1,500.00 |
18,000.00 |
18,000.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
52   |
CUYD |
20.00 |
1,040.00 |
60.00 |
3,120.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,080   |
CUYD |
58.60 |
63,288.00 |
125.00 |
135,000.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
4,733.2 |
TON |
110.50 |
523,018.60 |
98.00 |
463,853.60 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
317.5 |
TON |
70.00 |
22,225.00 |
200.00 |
63,500.00 |
|
|
|
|
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
26,170   |
GAL |
3.36 |
87,931.20 |
3.80 |
99,446.00 |
|
|
|
|
| 507-02-B |
aggregate (s2)
|
38,485   |
SQYD |
1.48 |
56,957.80 |
1.60 |
61,576.00 |
|
|
|
|
| 507-02-C |
aggregate (s3)
|
38,485   |
SQYD |
1.35 |
51,954.75 |
1.40 |
53,879.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
960   |
SQYD |
10.00 |
9,600.00 |
8.80 |
8,448.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 43   |
CUYD |
1.00 |
- 43.00 |
1.00 |
- 43.00 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
1,700   |
SQYD |
70.00 |
119,000.00 |
110.00 |
187,000.00 |
|
|
|
|
| 701-02-D/D |
cross drain pipe arch (24" equiv. rcpa or 24" equiv.
cmpa) |
424   |
LNFT |
155.00 |
65,720.00 |
200.00 |
84,800.00 |
|
|
|
|
| 701-02-F/G |
cross drain pipe arch (36" equiv. rcpa or 42" equiv.
cmpa) |
40   |
LNFT |
250.00 |
10,000.00 |
225.00 |
9,000.00 |
|
|
|
|
| 712-02 |
sacked concrete revetment
|
10   |
SQYD |
100.00 |
1,000.00 |
245.00 |
2,450.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
42,300.00 |
42,300.00 |
27,000.00 |
27,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
3.261 |
MILE |
400.00 |
1,304.40 |
450.00 |
1,467.45 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
2.098 |
MILE |
1.00 |
2.10 |
100.00 |
209.80 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
10.702 |
MILE |
1.00 |
10.70 |
100.00 |
1,070.20 |
|
|
|
|
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
1,722   |
EACH |
1.85 |
3,185.70 |
1.00 |
1,722.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
3.3 |
TON |
1,000.00 |
3,300.00 |
475.00 |
1,567.50 |
|
|
|
|
| 717-01 |
seeding
|
48   |
LB |
15.00 |
720.00 |
7.50 |
360.00 |
|
|
|
|
| 718-01 |
fertilizer
|
1,627   |
LB |
1.00 |
1,627.00 |
0.50 |
813.50 |
|
|
|
|
| 726-01 |
bedding material
|
104.0 |
CUYD |
80.00 |
8,320.00 |
67.00 |
6,968.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
42,300.00 |
42,300.00 |
65,000.00 |
65,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
22   |
EACH |
80.00 |
1,760.00 |
85.00 |
1,870.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
430   |
EACH |
4.50 |
1,935.00 |
5.90 |
2,537.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
30   |
LNFT |
3.00 |
90.00 |
3.75 |
112.50 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
5.351 |
MILE |
2,500.00 |
13,377.50 |
4,000.00 |
21,404.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.049 |
MILE |
600.00 |
629.40 |
700.00 |
734.30 |
|
|
|
|
| 735-01 |
mailboxes
|
27   |
EACH |
1.00 |
27.00 |
1.15 |
31.05 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
23   |
EACH |
125.00 |
2,875.00 |
140.00 |
3,220.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
3   |
EACH |
175.00 |
525.00 |
195.00 |
585.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| S-001 |
cleaning existing ditches
|
220   |
LNFT |
10.00 |
2,200.00 |
10.00 |
2,200.00 |
|
|
|
|
| S-002 |
saw cutting asphaltic concrete pavement
|
8,700   |
INFT |
0.01 |
87.00 |
1.40 |
12,180.00 |
|
|
|
|
| S-003 |
surface preparation
|
lump |
LUMP |
55,000.00 |
55,000.00 |
45,000.00 |
45,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,209,768.15 |
|
1,396,081.90 |
|
|
|
|
|