| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
2,000.00 |
2,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
66.0 |
LNFT |
20.00 |
1,320.00 |
21.00 |
1,386.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
60.0 |
CUYD |
30.00 |
1,800.00 |
120.00 |
7,200.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
1,979.4 |
TON |
112.50 |
222,682.50 |
150.00 |
296,910.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
350.2 |
TON |
158.00 |
55,331.60 |
250.00 |
87,550.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
21,178   |
SQYD |
2.90 |
61,416.20 |
3.50 |
74,123.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 701   |
CUYD |
1.00 |
- 701.00 |
0.10 |
- 70.10 |
|
|
|
|
| 602-05-G-01 |
full depth patching of jointed conc pvmt (8" thick)
(16.0 sq yds & under) |
43.0 |
SQYD |
265.00 |
11,395.00 |
250.00 |
10,750.00 |
|
|
|
|
| 602-05-G-03 |
full depth patching of jointed conc pvmt (8" thick)
(48.1 sq yds & over) |
75.1 |
SQYD |
180.00 |
13,518.00 |
250.00 |
18,775.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
8   |
EACH |
1,100.00 |
8,800.00 |
1,250.00 |
10,000.00 |
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
20.0 |
SQYD |
50.00 |
1,000.00 |
55.00 |
1,100.00 |
|
|
|
|
| 706-04 |
handicapped curb ramps
|
13.0 |
each |
800.00 |
10,400.00 |
880.00 |
11,440.00 |
|
|
|
|
| 707-01 |
concrete curb
|
66.0 |
LNFT |
15.00 |
990.00 |
20.00 |
1,320.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
22,000.00 |
22,000.00 |
38,000.00 |
38,000.00 |
|
|
|
|
| 713-02-C |
temporary pavement markings (8" width)
|
525   |
LNFT |
0.20 |
105.00 |
0.22 |
115.50 |
|
|
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
497   |
LNFT |
0.60 |
298.20 |
0.66 |
328.02 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
2.260 |
MILE |
400.00 |
904.00 |
130.00 |
293.80 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
2.260 |
MILE |
400.00 |
904.00 |
440.00 |
994.40 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
1.305 |
MILE |
800.00 |
1,044.00 |
880.00 |
1,148.40 |
|
|
|
|
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
1   |
EACH |
50.00 |
50.00 |
55.00 |
55.00 |
|
|
|
|
| 713-05-C |
temporary pavement legends and symbols (only)
|
2   |
EACH |
50.00 |
100.00 |
55.00 |
110.00 |
|
|
|
|
| 713-05-F |
temporary pavement legends and symbols (exit)
|
2   |
EACH |
100.00 |
200.00 |
110.00 |
220.00 |
|
|
|
|
| 713-05-G |
temporary pavement legends and symbols (lane)
|
2   |
EACH |
100.00 |
200.00 |
110.00 |
220.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
22,000.00 |
22,000.00 |
56,300.00 |
56,300.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,944   |
EACH |
4.50 |
8,748.00 |
5.00 |
9,720.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
525   |
LNFT |
1.00 |
525.00 |
1.10 |
577.50 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
497   |
LNFT |
3.00 |
1,491.00 |
3.30 |
1,640.10 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
1.305 |
MILE |
5,000.00 |
6,525.00 |
5,500.00 |
7,177.50 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.130 |
MILE |
1,000.00 |
1,130.00 |
1,100.00 |
1,243.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
1   |
EACH |
200.00 |
200.00 |
220.00 |
220.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
2   |
EACH |
200.00 |
400.00 |
220.00 |
440.00 |
|
|
|
|
| 732-04-F |
plastic pavement legends & symbols (exit)
|
2   |
EACH |
300.00 |
600.00 |
330.00 |
660.00 |
|
|
|
|
| 732-04-G |
plastic pavement legends & symbols (lane)
|
2   |
EACH |
300.00 |
600.00 |
330.00 |
660.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
6,500.00 |
6,500.00 |
|
|
|
|
| 741-11 |
adjusting water valve and meter box
|
1   |
EACH |
750.00 |
750.00 |
850.00 |
850.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
473,726.50 |
|
667,957.12 |
|
|
|
|
|