| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
- 2 - COASTAL BRIDGE CO., L.L.C. |
- 3 - BARBER BROS. CONTRACTING CO., L.L.C |
- 4 - DIAMOND B CONSTRUCTION CO., L.L.C. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 204-02 |
temporary hay or straw bales
|
224   |
EACH |
8.00 |
1,792.00 |
15.00 |
3,360.00 |
20.00 |
4,480.00 |
35.00 |
7,840.00 |
| 204-06 |
temporary silt fencing
|
3,007   |
LNFT |
1.40 |
4,209.80 |
2.00 |
6,014.00 |
1.50 |
4,510.50 |
6.00 |
18,042.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
5,881   |
CUYD |
20.00 |
117,620.00 |
77.00 |
452,837.00 |
72.00 |
423,432.00 |
85.00 |
499,885.00 |
| 502-01 |
superpave asphaltic concrete
|
16,506.3 |
TON |
90.00 |
1,485,567.00 |
88.50 |
1,460,807.55 |
105.00 |
1,733,161.50 |
115.00 |
1,898,224.50 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,226.7 |
TON |
150.00 |
184,005.00 |
125.00 |
153,337.50 |
125.00 |
153,337.50 |
200.00 |
245,340.00 |
| 509-01 |
cold planing asphaltic pavement (1" average depth)
|
4,980   |
SQYD |
20.00 |
99,600.00 |
4.00 |
19,920.00 |
6.00 |
29,880.00 |
6.00 |
29,880.00 |
| 510-01-B |
pavement patching (12" minimum thickness)
|
600   |
SQYD |
100.00 |
60,000.00 |
120.00 |
72,000.00 |
100.00 |
60,000.00 |
115.00 |
69,000.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
125,000.00 |
125,000.00 |
10,000.00 |
10,000.00 |
70,000.00 |
70,000.00 |
25,000.00 |
25,000.00 |
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
11.390 |
MILE |
600.00 |
6,834.00 |
400.00 |
4,556.00 |
250.00 |
2,847.50 |
150.00 |
1,708.50 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
7.545 |
MILE |
100.00 |
754.50 |
300.00 |
2,263.50 |
1.00 |
7.55 |
300.00 |
2,263.50 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
32.320 |
MILE |
100.00 |
3,232.00 |
450.00 |
14,544.00 |
1.00 |
32.32 |
450.00 |
14,544.00 |
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
1,506   |
EACH |
0.25 |
376.50 |
0.00 |
0.00 |
1.00 |
1,506.00 |
2.25 |
3,388.50 |
| 727-01 |
mobilization
|
lump |
LUMP |
126,800.00 |
126,800.00 |
260,000.00 |
260,000.00 |
85,000.00 |
85,000.00 |
135,000.00 |
135,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
46   |
EACH |
60.00 |
2,760.00 |
75.00 |
3,450.00 |
68.00 |
3,128.00 |
55.00 |
2,530.00 |
| 729-16-C |
object marker assembly (type 3)
|
12   |
EACH |
80.00 |
960.00 |
85.00 |
1,020.00 |
95.00 |
1,140.00 |
80.00 |
960.00 |
| 731-02 |
reflectorized raised pavement markers
|
1,506   |
EACH |
6.00 |
9,036.00 |
5.50 |
8,283.00 |
6.00 |
9,036.00 |
5.50 |
8,283.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
32.320 |
MILE |
3,000.00 |
96,960.00 |
2,750.00 |
88,880.00 |
2,950.00 |
95,344.00 |
2,500.00 |
80,800.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
7.545 |
MILE |
1,000.00 |
7,545.00 |
750.00 |
5,658.75 |
795.00 |
5,998.28 |
725.00 |
5,470.13 |
| 735-01 |
mailboxes
|
58   |
EACH |
5.00 |
290.00 |
1.00 |
58.00 |
6.00 |
348.00 |
1.00 |
58.00 |
| 735-02 |
mailbox supports (single)
|
39   |
EACH |
125.00 |
4,875.00 |
125.00 |
4,875.00 |
128.00 |
4,992.00 |
100.00 |
3,900.00 |
| 735-03 |
mailbox supports (double)
|
4   |
EACH |
150.00 |
600.00 |
225.00 |
900.00 |
200.00 |
800.00 |
125.00 |
500.00 |
| 735-04 |
mailbox supports (multiple)
|
3   |
EACH |
275.00 |
825.00 |
350.00 |
1,050.00 |
250.00 |
750.00 |
220.00 |
660.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
25,000.00 |
25,000.00 |
7,500.00 |
7,500.00 |
3,000.00 |
3,000.00 |
12,000.00 |
12,000.00 |
| S-001 |
surface preparation
|
lump |
LUMP |
75,000.00 |
75,000.00 |
75,000.00 |
75,000.00 |
75,000.00 |
75,000.00 |
146,000.00 |
146,000.00 |
| S-002 |
saw cutting asphaltic concrete patches (12" deep)
|
2,774   |
LNFT |
5.00 |
13,870.00 |
5.00 |
13,870.00 |
6.50 |
18,031.00 |
1.55 |
4,299.70 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,453,511.80 |
|
2,670,184.30 |
|
2,785,762.15 |
|
3,215,576.83 |
|