Letting of 11/12/2008 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 140-01-0010
Parish: VERNON
Routes: LA 113
Description: JCT. LA 10 - RAPIDES PH. LINE
Type Const: cold planing asphaltic concrete, pavement patching,superpave asphaltic concrete
overlay and related work.
Estimated Construction Cost: $2,630,603.83
 
RankLicenseBidderConstruction Bid
1 34356 PRAIRIE CONTRACTORS INC. $1,955,395.33
2 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $2,099,879.50
3 05789 D & J CONSTRUCTION CO., INC. $2,159,995.53
4 12312 GILCHRIST CONSTRUCTION CO. LLC $2,196,370.05
 
Item Number Item Description Quantity Unit of Measure - 1 -
PRAIRIE CONTRACTORS INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 3 -
D & J CONSTRUCTION CO., INC.
- 4 -
GILCHRIST CONSTRUCTION CO. LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 1,400      LNFT 25.00 35,000.00 3.50 4,900.00 7.00 9,800.00 12.00 16,800.00
401-02 aggregate surface course (adjusted vehicular
measurement)
2,203      CUYD 10.00 22,030.00 80.00 176,240.00 75.00 165,225.00 110.00 242,330.00
502-01 superpave asphaltic concrete 10,058.0    TON 102.00 1,025,916.00 94.00 945,452.00 110.00 1,106,380.00 98.00 985,684.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,577.0    TON 70.00 110,390.00 150.00 236,550.00 110.00 173,470.00 150.00 236,550.00
507-01-A asphaltic material (crs-2p emulsion) 49,743      GAL 3.50 174,100.50 5.00 248,715.00 4.20 208,920.60 3.60 179,074.80
507-02-B aggregate (s2) 73,152      SQYD 2.00 146,304.00 1.25 91,440.00 1.15 84,124.80 1.25 91,440.00
507-02-C aggregate (s3) 73,152      SQYD 2.00 146,304.00 1.00 73,152.00 0.85 62,179.20 1.15 84,124.80
509-01 cold planing asphaltic pavement 6,808      SQYD 4.35 29,614.80 3.75 25,530.00 3.25 22,126.00 3.25 22,126.00
509-02 contractor retained reclaimed asphaltic pavement - 300      CUYD 0.01 - 3.00 0.10 - 30.00 0.01 - 3.00 0.01 - 3.00
510-01-B pavement patching (12" minimum thickness) 400      SQYD 155.00 62,000.00 95.00 38,000.00 150.00 60,000.00 125.00 50,000.00
704-03 blocked out guard rail 200.0    LNFT 25.00 5,000.00 24.00 4,800.00 21.00 4,200.00 22.00 4,400.00
704-07-A guard rail bridge attachments (single thrie beam) 200.0    LNFT 45.00 9,000.00 48.00 9,600.00 42.00 8,400.00 42.00 8,400.00
704-08-B guard rail transitions (double thrie beam) 400.0    LNFT 60.00 24,000.00 67.00 26,800.00 58.00 23,200.00 59.00 23,600.00
704-11-A guard rail end treatment (flared) 16      EACH 2,100.00 33,600.00 2,100.00 33,600.00 2,100.00 33,600.00 2,200.00 35,200.00
713-01 temporary signs & barricades lump      LUMP 25,000.00 25,000.00 10,000.00 10,000.00 40,000.00 40,000.00 20,000.00 20,000.00
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
6.249  MILE 400.00 2,499.60 135.00 843.62 225.00 1,406.03 450.00 2,812.05
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
10.953  MILE 0.01 0.11 225.00 2,464.43 200.00 2,190.60 100.00 1,095.30
713-04-A temporary pavement markings (solid line)(4" width) 12.034  MILE 0.01 0.12 500.00 6,017.00 400.00 4,813.60 100.00 1,203.40
713-06-A temporary reflectorized raised pavement markers (tabs) 3,300      EACH 1.50 4,950.00 1.50 4,950.00 1.50 4,950.00 1.00 3,300.00
716-01-A mulch (vegetative) 6.0    TON 1,000.00 6,000.00 440.00 2,640.00 400.00 2,400.00 420.00 2,520.00
717-01 seeding 90      LB 25.00 2,250.00 8.00 720.00 8.00 720.00 7.80 702.00
718-01 fertilizer 3,000      LB 1.10 3,300.00 0.55 1,650.00 0.50 1,500.00 0.75 2,250.00
727-01 mobilization lump      LUMP 30,000.00 30,000.00 65,000.00 65,000.00 57,000.00 57,000.00 70,000.00 70,000.00
729-16-C object marker assembly (type 3) 16      EACH 80.00 1,280.00 80.00 1,280.00 75.00 1,200.00 85.00 1,360.00
731-02 reflectorized raised pavement markers 825      EACH 6.00 4,950.00 5.50 4,537.50 6.00 4,950.00 5.85 4,826.25
732-01-E plastic pavement striping (24" width) 34      LNFT 3.50 119.00 3.50 119.00 15.00 510.00 3.50 119.00
732-02-A plastic pavement striping (solid line) (4" width) 7.357  MILE 2,500.00 18,392.50 2,250.00 16,553.25 2,900.00 21,335.30 2,200.00 16,185.40
732-03-A plastic pavement striping (broken line)(4" width) 5.477  MILE 600.00 3,286.20 600.00 3,286.20 1,200.00 6,572.40 650.00 3,560.05
735-01 mailboxes 32      EACH 5.00 160.00 1.00 32.00 25.00 800.00 5.00 160.00
735-02 mailbox supports (single) 25      EACH 150.00 3,750.00 125.00 3,125.00 125.00 3,125.00 140.00 3,500.00
735-03 mailbox supports (double) 2      EACH 300.00 600.00 175.00 350.00 200.00 400.00 195.00 390.00
735-04 mailbox supports (multiple) 1      EACH 400.00 400.00 325.00 325.00 350.00 350.00 360.00 360.00
740-01 construction layout lump      LUMP 100.00 100.00 4,200.00 4,200.00 9,000.00 9,000.00 12,000.00 12,000.00
S-001 saw cutting asphaltic concrete pavement 10,150      INFT 0.01 101.50 0.25 2,537.50 1.00 10,150.00 2.00 20,300.00
S-002 surface preparation lump      LUMP 25,000.00 25,000.00 54,500.00 54,500.00 25,000.00 25,000.00 50,000.00 50,000.00
                       
 CONTRACTOR TOTAL       1,955,395.33   2,099,879.50   2,159,995.53   2,196,370.05