| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BENTON & BROWN, LLC. |
- 2 - MADDEN CONTRACTING CO., INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
10   |
SQYD |
60.00 |
600.00 |
39.00 |
390.00 |
|
|
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
2,500.00 |
2,500.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
500   |
CUYD |
25.00 |
12,500.00 |
32.00 |
16,000.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
50   |
CUYD |
85.00 |
4,250.00 |
30.00 |
1,500.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
2,755.9 |
TON |
104.00 |
286,613.60 |
113.50 |
312,794.65 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
100.0 |
TON |
150.00 |
15,000.00 |
70.00 |
7,000.00 |
|
|
|
|
| 510-01-A |
pavement patching (6" minimum thickness)
|
3,400   |
SQYD |
48.50 |
164,900.00 |
54.00 |
183,600.00 |
|
|
|
|
| 712-04 |
flexible revetment
|
80   |
SQYD |
80.00 |
6,400.00 |
100.00 |
8,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
14,500.00 |
14,500.00 |
22,700.00 |
22,700.00 |
|
|
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
13   |
LNFT |
1.00 |
13.00 |
0.10 |
1.30 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
2.000 |
MILE |
330.00 |
660.00 |
400.00 |
800.00 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
0.720 |
MILE |
325.00 |
234.00 |
1.00 |
0.72 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
3.051 |
MILE |
500.00 |
1,525.50 |
1.00 |
3.05 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
14,500.00 |
14,500.00 |
22,700.00 |
22,700.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
133   |
EACH |
5.60 |
744.80 |
4.50 |
598.50 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
3.051 |
MILE |
3,200.00 |
9,763.20 |
2,500.00 |
7,627.50 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.720 |
MILE |
760.00 |
547.20 |
600.00 |
432.00 |
|
|
|
|
| 739-01 |
hydro-seeding
|
1.00 |
ACRE |
2,300.00 |
2,300.00 |
2,500.00 |
2,500.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
12,500.00 |
12,500.00 |
|
|
|
|
| S-001 |
saw cutting concrete drives
|
36   |
LNFT |
25.00 |
900.00 |
30.00 |
1,080.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
543,451.30 |
|
605,227.72 |
|
|
|
|
|