| Lead Project: 087-02-0017 |
| Parish: WEBSTER |
| Routes: LA 159 |
| Description: LA 157 TO ARKANSAS STATE LINE |
Type Const:
grading, drainage structures, superpave asphaltic concrete overlay, pavement patching,
and related work. |
| Estimated Construction Cost: $1,260,370.15 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
1,740   |
LNFT |
7.00 |
12,180.00 |
|
|
|
|
|
|
| 202-02-I |
removal of asphaltic surfacing from bridge deck
|
861   |
EACH |
0.01 |
8.61 |
|
|
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
4,000   |
CUYD |
16.00 |
64,000.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
300   |
CUYD |
25.00 |
7,500.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
6,725.8 |
TON |
113.00 |
760,015.40 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,050.0 |
TON |
70.00 |
73,500.00 |
|
|
|
|
|
|
| 510-01-A |
pavement patching (6" minimum thickness)
|
600   |
SQYD |
71.00 |
42,600.00 |
|
|
|
|
|
|
| 701-08 |
relaying pipe
|
28   |
LNFT |
150.00 |
4,200.00 |
|
|
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
8   |
LNFT |
200.00 |
1,600.00 |
|
|
|
|
|
|
| 701-15 |
concrete collar
|
2   |
EACH |
625.00 |
1,250.00 |
|
|
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
400.0 |
LNFT |
50.00 |
20,000.00 |
|
|
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
646.0 |
LNFT |
64.00 |
41,344.00 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
400.0 |
LNFT |
22.00 |
8,800.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
16   |
EACH |
2,100.00 |
33,600.00 |
|
|
|
|
|
|
| 712-04 |
flexible revetment
|
150   |
SQYD |
80.00 |
12,000.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
97,300.00 |
97,300.00 |
|
|
|
|
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
70   |
LNFT |
0.10 |
7.00 |
|
|
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
3.880 |
MILE |
400.00 |
1,552.00 |
|
|
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
2.887 |
MILE |
1.00 |
2.89 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
10.942 |
MILE |
1.00 |
10.94 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
23.6 |
TON |
600.00 |
14,160.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
97,300.00 |
97,300.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
16   |
EACH |
75.00 |
1,200.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
490   |
EACH |
4.50 |
2,205.00 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
70   |
LNFT |
3.00 |
210.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
10.942 |
MILE |
2,500.00 |
27,355.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.887 |
MILE |
600.00 |
1,732.20 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
27   |
EACH |
1.00 |
27.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
27   |
EACH |
125.00 |
3,375.00 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
13.47 |
ACRE |
1,200.00 |
16,164.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
25,000.00 |
25,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,370,199.04 |
|
|
|
|
|
|
|