| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - JAMES CONSTRUCTION GROUP LLC |
- 2 - GUINN BROTHERS, LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
100,000.00 |
100,000.00 |
70,000.00 |
70,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
6,000.00 |
6,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-A-01 |
removal of bridges(sta. 125+85.40' 24' x 209'concrete
slab bridge) |
1   |
EACH |
30,000.00 |
30,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| 202-02-A-02 |
removal of bridges(sta. 131+02; 25' x 152' timber
trestle bridge) |
1   |
EACH |
30,000.00 |
30,000.00 |
35,000.00 |
35,000.00 |
|
|
|
|
| 202-02-A-03 |
removal of bridges(sta. 124+78; 24' x 38' concrete
slab bridge) |
1   |
EACH |
10,000.00 |
10,000.00 |
14,000.00 |
14,000.00 |
|
|
|
|
| 202-02-A-04 |
removal of bridges(sta. 128+00; 32' x 38' timber
trestle bridge) |
1   |
EACH |
10,000.00 |
10,000.00 |
14,000.00 |
14,000.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
6,408.9 |
SQYD |
7.00 |
44,862.30 |
6.00 |
38,453.40 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
800   |
LNFT |
5.00 |
4,000.00 |
6.00 |
4,800.00 |
|
|
|
|
| 203-02 |
drainage excavation
|
2,294   |
CUYD |
10.00 |
22,940.00 |
11.50 |
26,381.00 |
|
|
|
|
| 203-05 |
excavation & embankment
|
lump |
LUMP |
80,000.00 |
80,000.00 |
135,000.00 |
135,000.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
7   |
EACH |
150.00 |
1,050.00 |
100.00 |
700.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
3,550   |
LNFT |
3.00 |
10,650.00 |
3.00 |
10,650.00 |
|
|
|
|
| 302-02-A |
class ii base course (4" thick)
|
8,272.3 |
SQYD |
16.00 |
132,356.80 |
13.00 |
107,539.90 |
|
|
|
|
| 302-02-D |
class ii base course (8 1/2" thick)
|
8,272.3 |
SQYD |
15.00 |
124,084.50 |
20.00 |
165,446.00 |
|
|
|
|
| 304-05 |
lime treatment (type e)
|
117.00 |
TON |
300.00 |
35,100.00 |
1,200.00 |
140,400.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
16   |
CUYD |
95.00 |
1,520.00 |
100.00 |
1,600.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
10.0 |
CUYD |
250.00 |
2,500.00 |
100.00 |
1,000.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
1,970.6 |
TON |
150.00 |
295,590.00 |
185.00 |
364,561.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
588.9 |
TON |
200.00 |
117,780.00 |
210.00 |
123,669.00 |
|
|
|
|
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
68   |
LNFT |
75.00 |
5,100.00 |
125.00 |
8,500.00 |
|
|
|
|
| 701-05-G |
side drain pipe (18")
|
44   |
LNFT |
55.00 |
2,420.00 |
105.00 |
4,620.00 |
|
|
|
|
| 701-05-I-01 |
side drain pipe (24")(erosion control)
|
146   |
LNFT |
75.00 |
10,950.00 |
115.00 |
16,790.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
425.0 |
LNFT |
20.00 |
8,500.00 |
25.00 |
10,625.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
400.0 |
LNFT |
60.00 |
24,000.00 |
70.00 |
28,000.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
12   |
EACH |
2,150.00 |
25,800.00 |
2,550.00 |
30,600.00 |
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
4   |
EACH |
2,400.00 |
9,600.00 |
3,200.00 |
12,800.00 |
|
|
|
|
| 705-01 |
barbed wire fence
|
368   |
LNFT |
10.50 |
3,864.00 |
7.00 |
2,576.00 |
|
|
|
|
| 708-01 |
right-of-way monument
|
27   |
EACH |
150.00 |
4,050.00 |
200.00 |
5,400.00 |
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
27   |
EACH |
150.00 |
4,050.00 |
200.00 |
5,400.00 |
|
|
|
|
| 711-01-D |
riprap (55 lb)
|
2,481   |
SQYD |
75.00 |
186,075.00 |
75.00 |
186,075.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
4,088   |
SQYD |
3.00 |
12,264.00 |
5.00 |
20,440.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
25,000.00 |
25,000.00 |
88,000.00 |
88,000.00 |
|
|
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
336   |
SQYD |
3.00 |
1,008.00 |
10.00 |
3,360.00 |
|
|
|
|
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
489   |
SQYD |
4.00 |
1,956.00 |
10.00 |
4,890.00 |
|
|
|
|
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
400   |
SQYD |
4.50 |
1,800.00 |
10.00 |
4,000.00 |
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
15,000.00 |
15,000.00 |
30,000.00 |
30,000.00 |
|
|
|
|
| 726-01 |
bedding material
|
10.0 |
CUYD |
100.00 |
1,000.00 |
100.00 |
1,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
370,000.00 |
370,000.00 |
450,000.00 |
450,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
16   |
EACH |
75.00 |
1,200.00 |
100.00 |
1,600.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
395   |
EACH |
5.00 |
1,975.00 |
8.00 |
3,160.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
1.361 |
MILE |
3,000.00 |
4,083.00 |
3,500.00 |
4,763.50 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.163 |
MILE |
1,000.00 |
163.00 |
1,200.00 |
195.60 |
|
|
|
|
| 739-01 |
hydro-seeding
|
4.41 |
ACRE |
1,600.00 |
7,056.00 |
2,500.00 |
11,025.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
50,000.00 |
50,000.00 |
112,500.00 |
112,500.00 |
|
|
|
|
| 804-01-C |
precast concrete piles (16")
|
7,804   |
LNFT |
62.00 |
483,848.00 |
80.00 |
624,320.00 |
|
|
|
|
| 804-12 |
loading permanent piles
|
4   |
EACH |
2,500.00 |
10,000.00 |
1.00 |
4.00 |
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
237.05 |
CUYD |
750.00 |
177,787.50 |
1,200.00 |
284,460.00 |
|
|
|
|
| 805-03 |
class aa concrete
|
985.16 |
CUYD |
600.00 |
591,096.00 |
1,000.00 |
985,160.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
221,752   |
LB |
1.00 |
221,752.00 |
1.25 |
277,190.00 |
|
|
|
|
| 810-01 |
concrete railing (barrier)
|
1,120.00 |
LNFT |
75.00 |
84,000.00 |
80.00 |
89,600.00 |
|
|
|
|
| 813-01 |
concrete approach slabs
|
1,457.76 |
SQYD |
220.00 |
320,707.20 |
225.00 |
327,996.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,724,538.30 |
|
4,938,250.40 |
|
|
|
|
|