| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - D & J CONSTRUCTION CO., INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-F |
removal of concrete combination curb & gutter
|
1,190.0 |
LNFT |
15.00 |
17,850.00 |
12.00 |
14,280.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
129   |
CUYD |
88.00 |
11,352.00 |
75.00 |
9,675.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
2,164.5 |
TON |
130.00 |
281,385.00 |
130.00 |
281,385.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
325.8 |
TON |
250.00 |
81,450.00 |
200.00 |
65,160.00 |
|
|
|
|
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
12,639   |
GAL |
6.00 |
75,834.00 |
4.25 |
53,715.75 |
|
|
|
|
| 507-02-B |
aggregate (s2)
|
18,587   |
SQYD |
1.95 |
36,244.65 |
1.35 |
25,092.45 |
|
|
|
|
| 507-02-C |
aggregate (s3)
|
18,587   |
SQYD |
1.50 |
27,880.50 |
1.00 |
18,587.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
18,587   |
SQYD |
2.00 |
37,174.00 |
3.00 |
55,761.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 517   |
CUYD |
0.10 |
- 51.70 |
0.01 |
- 5.17 |
|
|
|
|
| 510-01-C |
pavement patching (15" minimum thickness)
|
400   |
SQYD |
160.00 |
64,000.00 |
175.00 |
70,000.00 |
|
|
|
|
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
163   |
LNFT |
150.00 |
24,450.00 |
65.00 |
10,595.00 |
|
|
|
|
| 702-03-C |
catch basins (cb-06)
|
2   |
EACH |
5,000.00 |
10,000.00 |
4,500.00 |
9,000.00 |
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
1,190.0 |
LNFT |
32.00 |
38,080.00 |
26.00 |
30,940.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
9,000.00 |
9,000.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
3.960 |
MILE |
185.00 |
732.60 |
225.00 |
891.00 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
2.445 |
MILE |
350.00 |
855.75 |
300.00 |
733.50 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
12.045 |
MILE |
650.00 |
7,829.25 |
1.00 |
12.05 |
|
|
|
|
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
350   |
EACH |
2.00 |
700.00 |
2.00 |
700.00 |
|
|
|
|
| 726-01 |
bedding material
|
61.2 |
CUYD |
185.00 |
11,322.00 |
100.00 |
6,120.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
63,000.00 |
63,000.00 |
80,000.00 |
80,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
176   |
EACH |
5.00 |
880.00 |
25.00 |
4,400.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
4.015 |
MILE |
3,000.00 |
12,045.00 |
4,500.00 |
18,067.50 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.815 |
MILE |
700.00 |
570.50 |
2,800.00 |
2,282.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
2,000.00 |
2,000.00 |
7,000.00 |
7,000.00 |
|
|
|
|
| 805-06 |
class r concrete
|
10.10 |
CUYD |
150.00 |
1,515.00 |
175.00 |
1,767.50 |
|
|
|
|
| S-001 |
sawcuts for pavement patching
|
1,569.5 |
LNFT |
2.30 |
3,609.85 |
5.00 |
7,847.50 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
819,708.40 |
|
824,007.08 |
|
|
|
|
|