Lead Project: 031-03-0026
Parish: CAMERON
Routes: LA 27
Description: 1.16 MILES SOUTH OF LA 390 - KELSO BAYOU
Type Const: grading, cold planing, pavement patching, superpave asphaltic concrete pavement
and related work.
Estimated Construction Cost: $2,159,250.51
 
RankLicenseBidderConstruction Bid
1 00183 R. E. HEIDT CONSTRUCTION CO., INC. $1,424,175.25
2 34356 PRAIRIE CONTRACTORS INC. $1,494,721.82
3 14096 BESSETTE DEVELOPMENT CORP. $1,734,618.54
4 12312 GILCHRIST CONSTRUCTION CO. LLC $1,868,676.50
5 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,975,958.20
 
Item Number Item Description Quantity Unit of Measure - 1 -
R. E. HEIDT CONSTRUCTION CO., INC.
- 2 -
PRAIRIE CONTRACTORS INC.
- 3 -
BESSETTE DEVELOPMENT CORP.
- 4 -
GILCHRIST CONSTRUCTION CO. LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-07 borrow (vehicular measurement) 2,950      CUYD 36.00 106,200.00 10.00 29,500.00 23.00 67,850.00 20.00 59,000.00
401-02 aggregate surface course (adjusted vehicular
measurement)
1,663      CUYD 78.00 129,714.00 45.00 74,835.00 89.85 149,420.55 75.00 124,725.00
502-01 superpave asphaltic concrete 11,109.7    TON 88.00 977,653.60 102.25 1,135,966.83 101.75 1,130,411.98 106.00 1,177,628.20
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
500.0    TON 102.00 51,000.00 150.00 75,000.00 177.25 88,625.00 195.00 97,500.00
509-01 cold planing asphaltic pavement 73,293      SQYD 0.42 30,783.06 0.01 732.93 1.25 91,616.25 1.50 109,939.50
509-02 contractor retained reclaimed asphaltic pavement - 643      CUYD 13.00 - 8,359.00 0.01 - 6.43 1.00 - 643.00 1.00 - 643.00
510-01-B pavement patching (12" minimum thickness) 500      SQYD 97.00 48,500.00 125.00 62,500.00 67.50 33,750.00 160.00 80,000.00
713-01 temporary signs & barricades lump      LUMP 3,570.00 3,570.00 30,000.00 30,000.00 3,750.00 3,750.00 20,000.00 20,000.00
713-02-D temporary pavement markings (12" width) 24      LNFT 0.63 15.12 0.01 0.24 0.65 15.60 2.00 48.00
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
7.000  MILE 502.00 3,514.00 400.00 2,800.00 475.00 3,325.00 450.00 3,150.00
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
5.120  MILE 315.00 1,612.80 0.01 0.05 330.50 1,692.16 100.00 512.00
713-04-A temporary pavement markings (solid line)(4" width) 19.820  MILE 630.00 12,486.60 0.01 0.20 665.00 13,180.30 100.00 1,982.00
727-01 mobilization lump      LUMP 30,000.00 30,000.00 50,000.00 50,000.00 112,500.00 112,500.00 145,000.00 145,000.00
731-02 reflectorized raised pavement markers 462      EACH 4.73 2,185.26 5.00 2,310.00 5.00 2,310.00 6.50 3,003.00
732-01-D plastic pavement striping (12" width) 12      LNFT 1.58 18.96 1.50 18.00 1.65 19.80 3.00 36.00
732-02-A plastic pavement striping (solid line) (4" width) 9.910  MILE 2,625.00 26,013.75 2,700.00 26,757.00 2,750.00 27,252.50 2,700.00 26,757.00
732-03-A plastic pavement striping (broken line)(4" width) 2.560  MILE 630.00 1,612.80 700.00 1,792.00 665.00 1,702.40 980.00 2,508.80
735-01 mailboxes 16      EACH 1.05 16.80 1.00 16.00 1.25 20.00 2.50 40.00
735-02 mailbox supports (single) 12      EACH 131.25 1,575.00 150.00 1,800.00 135.00 1,620.00 170.00 2,040.00
735-03 mailbox supports (double) 2      EACH 183.75 367.50 300.00 600.00 200.00 400.00 225.00 450.00
740-01 construction layout lump      LUMP 5,695.00 5,695.00 100.00 100.00 5,800.00 5,800.00 15,000.00 15,000.00
                       
 CONTRACTOR TOTAL       1,424,175.25   1,494,721.82   1,734,618.54   1,868,676.50
 
Item Number Item Description Quantity Unit of Measure - 5 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-07 borrow (vehicular measurement) 2,950      CUYD 20.00 59,000.00            
401-02 aggregate surface course (adjusted vehicular
measurement)
1,663      CUYD 95.00 157,985.00            
502-01 superpave asphaltic concrete 11,109.7    TON 118.00 1,310,944.60            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
500.0    TON 180.00 90,000.00            
509-01 cold planing asphaltic pavement 73,293      SQYD 1.00 73,293.00            
509-02 contractor retained reclaimed asphaltic pavement - 643      CUYD 0.10 - 64.30            
510-01-B pavement patching (12" minimum thickness) 500      SQYD 135.00 67,500.00            
713-01 temporary signs & barricades lump      LUMP 15,000.00 15,000.00            
713-02-D temporary pavement markings (12" width) 24      LNFT 0.65 15.60            
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
7.000  MILE 150.00 1,050.00            
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
5.120  MILE 330.00 1,689.60            
713-04-A temporary pavement markings (solid line)(4" width) 19.820  MILE 660.00 13,081.20            
727-01 mobilization lump      LUMP 141,000.00 141,000.00            
731-02 reflectorized raised pavement markers 462      EACH 5.00 2,310.00            
732-01-D plastic pavement striping (12" width) 12      LNFT 1.75 21.00            
732-02-A plastic pavement striping (solid line) (4" width) 9.910  MILE 2,750.00 27,252.50            
732-03-A plastic pavement striping (broken line)(4" width) 2.560  MILE 650.00 1,664.00            
735-01 mailboxes 16      EACH 1.00 16.00            
735-02 mailbox supports (single) 12      EACH 150.00 1,800.00            
735-03 mailbox supports (double) 2      EACH 200.00 400.00            
740-01 construction layout lump      LUMP 12,000.00 12,000.00            
                       
 CONTRACTOR TOTAL       1,975,958.20            