Letting of 11/12/2008 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 030-04-0030
Parish: WASHINGTON
Routes: LA 21
Description: JCT LA 1071 - MISSISSIPPI STATE LINE
Type Const: drainage structures, cold planing asphaltic concrete, pavement patching, superpave
asphaltic concrete overlay, and related work.
Estimated Construction Cost: $1,142,089.24
 
RankLicenseBidderConstruction Bid
1 06276 BARRIERE CONSTRUCTION CO., LLC. $868,631.70
2 06487 HUEY STOCKSTILL, INC. $907,081.70
3 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $963,160.39
4 10989 DICKERSON & BOWEN, INC. $1,105,730.35
5 02179 BOH BROS. CONSTRUCTION CO., LLC. $1,218,656.70
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC.
- 2 -
HUEY STOCKSTILL, INC.
- 3 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 4 -
DICKERSON & BOWEN, INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 35,000.00 35,000.00 3,000.00 3,000.00 25,000.00 25,000.00 6,000.00 6,000.00
202-02-H removal of guard rail 492      LNFT 7.00 3,444.00 5.00 2,460.00 10.00 4,920.00 6.50 3,198.00
204-02 temporary hay or straw bales 20      EACH 12.00 240.00 15.00 300.00 70.00 1,400.00 62.00 1,240.00
204-06 temporary silt fencing 600      LNFT 5.00 3,000.00 3.00 1,800.00 5.00 3,000.00 10.00 6,000.00
502-01 superpave asphaltic concrete 4,784.3    TON 90.00 430,587.00 95.00 454,508.50 84.50 404,273.35 104.00 497,567.20
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
450.0    TON 1.00 450.00 145.00 65,250.00 150.00 67,500.00 174.00 78,300.00
509-01 cold planing asphaltic pavement 43,493      SQYD 1.90 82,636.70 1.60 69,588.80 1.98 86,116.14 3.20 139,177.60
509-02 contractor retained reclaimed asphaltic pavement - 1,832      CUYD 7.00 - 12,824.00 0.00 0.00 0.10 - 183.20 FREE FREE
510-01-B pavement patching (12" minimum thickness) 945      SQYD 60.00 56,700.00 100.00 94,500.00 100.00 94,500.00 105.50 99,697.50
701-02-I cross drain pipe arch (54" equiv. rcpa) 72      LNFT 290.00 20,880.00 200.00 14,400.00 350.00 25,200.00 290.20 20,894.40
701-02-J cross drain pipe arch (60" equiv. rcpa) 76      LNFT 380.00 28,880.00 240.00 18,240.00 450.00 34,200.00 421.75 32,053.00
701-02-N cross drain pipe arch (84" equiv. rcpa) 84      LNFT 580.00 48,720.00 370.00 31,080.00 750.00 63,000.00 750.10 63,008.40
704-03 blocked out guard rail 181.3    LNFT 20.00 3,626.00 19.00 3,444.70 20.00 3,626.00 21.00 3,807.30
704-05 guard rail anchor sections (bct) 12.5    LNFT 80.00 1,000.00 80.00 1,000.00 80.00 1,000.00 85.00 1,062.50
704-07-A guard rail bridge attachments (single thrie beam) 150.0    LNFT 45.00 6,750.00 42.00 6,300.00 45.00 6,750.00 45.00 6,750.00
704-08-B guard rail transitions (double thrie beam) 175.0    LNFT 65.00 11,375.00 60.00 10,500.00 65.00 11,375.00 60.00 10,500.00
704-11-A guard rail end treatment (flared) 7      EACH 2,400.00 16,800.00 2,200.00 15,400.00 2,300.00 16,100.00 2,400.00 16,800.00
707-04 asphaltic curb 40.0    LNFT 60.00 2,400.00 100.00 4,000.00 35.00 1,400.00 73.75 2,950.00
713-01 temporary signs & barricades lump      LUMP 30,000.00 30,000.00 9,100.00 9,100.00 21,000.00 21,000.00 25,000.00 25,000.00
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
5.620  MILE 5.00 28.10 300.00 1,686.00 145.00 814.90 1,700.00 9,554.00
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
5.620  MILE 10.00 56.20 210.00 1,180.20 215.00 1,208.30 210.00 1,180.20
713-04-A temporary pavement markings (solid line)(4" width) 14.660  MILE 20.00 293.20 325.00 4,764.50 330.00 4,837.80 325.00 4,764.50
726-01 bedding material 65.0    CUYD 80.00 5,200.00 50.00 3,250.00 85.00 5,525.00 93.10 6,051.50
727-01 mobilization lump      LUMP 60,000.00 60,000.00 60,000.00 60,000.00 50,000.00 50,000.00 40,000.00 40,000.00
729-16-C object marker assembly (type 3) 8      EACH 90.00 720.00 90.00 720.00 85.00 680.00 93.10 744.80
731-02 reflectorized raised pavement markers 417      EACH 6.00 2,502.00 6.00 2,502.00 5.50 2,293.50 5.10 2,126.70
732-02-A plastic pavement striping (solid line) (4" width) 7.330  MILE 2,300.00 16,859.00 2,200.00 16,126.00 2,250.00 16,492.50 2,195.00 16,089.35
732-03-A plastic pavement striping (broken line)(4" width) 2.810  MILE 650.00 1,826.50 600.00 1,686.00 610.00 1,714.10 590.00 1,657.90
735-01 mailboxes 17      EACH 6.00 102.00 5.00 85.00 1.00 17.00 1.50 25.50
735-02 mailbox supports (single) 17      EACH 140.00 2,380.00 130.00 2,210.00 100.00 1,700.00 150.00 2,550.00
740-01 construction layout lump      LUMP 6,000.00 6,000.00 2,000.00 2,000.00 5,000.00 5,000.00 5,000.00 5,000.00
S-001 cleaning existing ditches 600      LNFT 5.00 3,000.00 10.00 6,000.00 4.50 2,700.00 3.30 1,980.00
                       
 CONTRACTOR TOTAL       868,631.70   907,081.70   963,160.39   1,105,730.35
 
Item Number Item Description Quantity Unit of Measure - 5 -
BOH BROS. CONSTRUCTION CO., LLC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 5,000.00 5,000.00            
202-02-H removal of guard rail 492      LNFT 7.00 3,444.00            
204-02 temporary hay or straw bales 20      EACH 15.00 300.00            
204-06 temporary silt fencing 600      LNFT 1.50 900.00            
502-01 superpave asphaltic concrete 4,784.3    TON 100.00 478,430.00            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
450.0    TON 150.00 67,500.00            
509-01 cold planing asphaltic pavement 43,493      SQYD 3.50 152,225.50            
509-02 contractor retained reclaimed asphaltic pavement - 1,832      CUYD 15.00 - 27,480.00            
510-01-B pavement patching (12" minimum thickness) 945      SQYD 150.00 141,750.00            
701-02-I cross drain pipe arch (54" equiv. rcpa) 72      LNFT 350.00 25,200.00            
701-02-J cross drain pipe arch (60" equiv. rcpa) 76      LNFT 390.00 29,640.00            
701-02-N cross drain pipe arch (84" equiv. rcpa) 84      LNFT 580.00 48,720.00            
704-03 blocked out guard rail 181.3    LNFT 20.00 3,626.00            
704-05 guard rail anchor sections (bct) 12.5    LNFT 80.00 1,000.00            
704-07-A guard rail bridge attachments (single thrie beam) 150.0    LNFT 45.00 6,750.00            
704-08-B guard rail transitions (double thrie beam) 175.0    LNFT 65.00 11,375.00            
704-11-A guard rail end treatment (flared) 7      EACH 2,400.00 16,800.00            
707-04 asphaltic curb 40.0    LNFT 30.00 1,200.00            
713-01 temporary signs & barricades lump      LUMP 95,000.00 95,000.00            
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
5.620  MILE 10.00 56.20            
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
5.620  MILE 15.00 84.30            
713-04-A temporary pavement markings (solid line)(4" width) 14.660  MILE 20.00 293.20            
726-01 bedding material 65.0    CUYD 100.00 6,500.00            
727-01 mobilization lump      LUMP 120,000.00 120,000.00            
729-16-C object marker assembly (type 3) 8      EACH 90.00 720.00            
731-02 reflectorized raised pavement markers 417      EACH 5.50 2,293.50            
732-02-A plastic pavement striping (solid line) (4" width) 7.330  MILE 2,200.00 16,126.00            
732-03-A plastic pavement striping (broken line)(4" width) 2.810  MILE 600.00 1,686.00            
735-01 mailboxes 17      EACH 1.00 17.00            
735-02 mailbox supports (single) 17      EACH 100.00 1,700.00            
740-01 construction layout lump      LUMP 3,000.00 3,000.00            
S-001 cleaning existing ditches 600      LNFT 8.00 4,800.00            
                       
 CONTRACTOR TOTAL       1,218,656.70            