| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
35,000.00 |
35,000.00 |
3,000.00 |
3,000.00 |
25,000.00 |
25,000.00 |
6,000.00 |
6,000.00 |
| 202-02-H |
removal of guard rail
|
492   |
LNFT |
7.00 |
3,444.00 |
5.00 |
2,460.00 |
10.00 |
4,920.00 |
6.50 |
3,198.00 |
| 204-02 |
temporary hay or straw bales
|
20   |
EACH |
12.00 |
240.00 |
15.00 |
300.00 |
70.00 |
1,400.00 |
62.00 |
1,240.00 |
| 204-06 |
temporary silt fencing
|
600   |
LNFT |
5.00 |
3,000.00 |
3.00 |
1,800.00 |
5.00 |
3,000.00 |
10.00 |
6,000.00 |
| 502-01 |
superpave asphaltic concrete
|
4,784.3 |
TON |
90.00 |
430,587.00 |
95.00 |
454,508.50 |
84.50 |
404,273.35 |
104.00 |
497,567.20 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
450.0 |
TON |
1.00 |
450.00 |
145.00 |
65,250.00 |
150.00 |
67,500.00 |
174.00 |
78,300.00 |
| 509-01 |
cold planing asphaltic pavement
|
43,493   |
SQYD |
1.90 |
82,636.70 |
1.60 |
69,588.80 |
1.98 |
86,116.14 |
3.20 |
139,177.60 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,832   |
CUYD |
7.00 |
- 12,824.00 |
0.00 |
0.00 |
0.10 |
- 183.20 |
FREE |
FREE |
| 510-01-B |
pavement patching (12" minimum thickness)
|
945   |
SQYD |
60.00 |
56,700.00 |
100.00 |
94,500.00 |
100.00 |
94,500.00 |
105.50 |
99,697.50 |
| 701-02-I |
cross drain pipe arch (54" equiv. rcpa)
|
72   |
LNFT |
290.00 |
20,880.00 |
200.00 |
14,400.00 |
350.00 |
25,200.00 |
290.20 |
20,894.40 |
| 701-02-J |
cross drain pipe arch (60" equiv. rcpa)
|
76   |
LNFT |
380.00 |
28,880.00 |
240.00 |
18,240.00 |
450.00 |
34,200.00 |
421.75 |
32,053.00 |
| 701-02-N |
cross drain pipe arch (84" equiv. rcpa)
|
84   |
LNFT |
580.00 |
48,720.00 |
370.00 |
31,080.00 |
750.00 |
63,000.00 |
750.10 |
63,008.40 |
| 704-03 |
blocked out guard rail
|
181.3 |
LNFT |
20.00 |
3,626.00 |
19.00 |
3,444.70 |
20.00 |
3,626.00 |
21.00 |
3,807.30 |
| 704-05 |
guard rail anchor sections (bct)
|
12.5 |
LNFT |
80.00 |
1,000.00 |
80.00 |
1,000.00 |
80.00 |
1,000.00 |
85.00 |
1,062.50 |
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
150.0 |
LNFT |
45.00 |
6,750.00 |
42.00 |
6,300.00 |
45.00 |
6,750.00 |
45.00 |
6,750.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
175.0 |
LNFT |
65.00 |
11,375.00 |
60.00 |
10,500.00 |
65.00 |
11,375.00 |
60.00 |
10,500.00 |
| 704-11-A |
guard rail end treatment (flared)
|
7   |
EACH |
2,400.00 |
16,800.00 |
2,200.00 |
15,400.00 |
2,300.00 |
16,100.00 |
2,400.00 |
16,800.00 |
| 707-04 |
asphaltic curb
|
40.0 |
LNFT |
60.00 |
2,400.00 |
100.00 |
4,000.00 |
35.00 |
1,400.00 |
73.75 |
2,950.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
30,000.00 |
30,000.00 |
9,100.00 |
9,100.00 |
21,000.00 |
21,000.00 |
25,000.00 |
25,000.00 |
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
5.620 |
MILE |
5.00 |
28.10 |
300.00 |
1,686.00 |
145.00 |
814.90 |
1,700.00 |
9,554.00 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
5.620 |
MILE |
10.00 |
56.20 |
210.00 |
1,180.20 |
215.00 |
1,208.30 |
210.00 |
1,180.20 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
14.660 |
MILE |
20.00 |
293.20 |
325.00 |
4,764.50 |
330.00 |
4,837.80 |
325.00 |
4,764.50 |
| 726-01 |
bedding material
|
65.0 |
CUYD |
80.00 |
5,200.00 |
50.00 |
3,250.00 |
85.00 |
5,525.00 |
93.10 |
6,051.50 |
| 727-01 |
mobilization
|
lump |
LUMP |
60,000.00 |
60,000.00 |
60,000.00 |
60,000.00 |
50,000.00 |
50,000.00 |
40,000.00 |
40,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
90.00 |
720.00 |
90.00 |
720.00 |
85.00 |
680.00 |
93.10 |
744.80 |
| 731-02 |
reflectorized raised pavement markers
|
417   |
EACH |
6.00 |
2,502.00 |
6.00 |
2,502.00 |
5.50 |
2,293.50 |
5.10 |
2,126.70 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
7.330 |
MILE |
2,300.00 |
16,859.00 |
2,200.00 |
16,126.00 |
2,250.00 |
16,492.50 |
2,195.00 |
16,089.35 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.810 |
MILE |
650.00 |
1,826.50 |
600.00 |
1,686.00 |
610.00 |
1,714.10 |
590.00 |
1,657.90 |
| 735-01 |
mailboxes
|
17   |
EACH |
6.00 |
102.00 |
5.00 |
85.00 |
1.00 |
17.00 |
1.50 |
25.50 |
| 735-02 |
mailbox supports (single)
|
17   |
EACH |
140.00 |
2,380.00 |
130.00 |
2,210.00 |
100.00 |
1,700.00 |
150.00 |
2,550.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
6,000.00 |
6,000.00 |
2,000.00 |
2,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
| S-001 |
cleaning existing ditches
|
600   |
LNFT |
5.00 |
3,000.00 |
10.00 |
6,000.00 |
4.50 |
2,700.00 |
3.30 |
1,980.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
868,631.70 |
|
907,081.70 |
|
963,160.39 |
|
1,105,730.35 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - BOH BROS. CONSTRUCTION CO., LLC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,000.00 |
5,000.00 |
|
|
|
|
|
|
| 202-02-H |
removal of guard rail
|
492   |
LNFT |
7.00 |
3,444.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
20   |
EACH |
15.00 |
300.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
600   |
LNFT |
1.50 |
900.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
4,784.3 |
TON |
100.00 |
478,430.00 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
450.0 |
TON |
150.00 |
67,500.00 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
43,493   |
SQYD |
3.50 |
152,225.50 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,832   |
CUYD |
15.00 |
- 27,480.00 |
|
|
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
945   |
SQYD |
150.00 |
141,750.00 |
|
|
|
|
|
|
| 701-02-I |
cross drain pipe arch (54" equiv. rcpa)
|
72   |
LNFT |
350.00 |
25,200.00 |
|
|
|
|
|
|
| 701-02-J |
cross drain pipe arch (60" equiv. rcpa)
|
76   |
LNFT |
390.00 |
29,640.00 |
|
|
|
|
|
|
| 701-02-N |
cross drain pipe arch (84" equiv. rcpa)
|
84   |
LNFT |
580.00 |
48,720.00 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
181.3 |
LNFT |
20.00 |
3,626.00 |
|
|
|
|
|
|
| 704-05 |
guard rail anchor sections (bct)
|
12.5 |
LNFT |
80.00 |
1,000.00 |
|
|
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
150.0 |
LNFT |
45.00 |
6,750.00 |
|
|
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
175.0 |
LNFT |
65.00 |
11,375.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
7   |
EACH |
2,400.00 |
16,800.00 |
|
|
|
|
|
|
| 707-04 |
asphaltic curb
|
40.0 |
LNFT |
30.00 |
1,200.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
95,000.00 |
95,000.00 |
|
|
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
5.620 |
MILE |
10.00 |
56.20 |
|
|
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
5.620 |
MILE |
15.00 |
84.30 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
14.660 |
MILE |
20.00 |
293.20 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
65.0 |
CUYD |
100.00 |
6,500.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
120,000.00 |
120,000.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
90.00 |
720.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
417   |
EACH |
5.50 |
2,293.50 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
7.330 |
MILE |
2,200.00 |
16,126.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.810 |
MILE |
600.00 |
1,686.00 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
17   |
EACH |
1.00 |
17.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
17   |
EACH |
100.00 |
1,700.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
3,000.00 |
3,000.00 |
|
|
|
|
|
|
| S-001 |
cleaning existing ditches
|
600   |
LNFT |
8.00 |
4,800.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,218,656.70 |
|
|
|
|
|
|
|