| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - D & J CONSTRUCTION CO., INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-G |
removal of surfacing & stabilized base
|
503.7 |
SQYD |
10.00 |
5,037.00 |
21.00 |
10,577.70 |
18.00 |
9,066.60 |
|
|
| 202-02-H |
removal of guard rail
|
1,530   |
LNFT |
25.00 |
38,250.00 |
8.00 |
12,240.00 |
6.00 |
9,180.00 |
|
|
| 203-07 |
borrow (vehicular measurement)
|
180   |
CUYD |
30.00 |
5,400.00 |
60.00 |
10,800.00 |
55.00 |
9,900.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
2,102.5 |
TON |
130.00 |
273,325.00 |
125.00 |
262,812.50 |
135.00 |
283,837.50 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
346.1 |
TON |
150.00 |
51,915.00 |
150.00 |
51,915.00 |
200.00 |
69,220.00 |
|
|
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
21,247   |
GAL |
4.50 |
95,611.50 |
5.40 |
114,733.80 |
4.25 |
90,299.75 |
|
|
| 507-02-B |
aggregate (s2)
|
40,317   |
SQYD |
1.20 |
48,380.40 |
1.50 |
60,475.50 |
1.20 |
48,380.40 |
|
|
| 507-02-C |
aggregate (s3)
|
17,469   |
SQYD |
1.00 |
17,469.00 |
1.10 |
19,215.90 |
0.90 |
15,722.10 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
21,074   |
SQYD |
2.25 |
47,416.50 |
3.00 |
63,222.00 |
2.75 |
57,953.50 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 529   |
CUYD |
0.01 |
- 5.29 |
0.10 |
- 52.90 |
0.10 |
- 52.90 |
|
|
| 510-01-C |
pavement patching (18" minimum thickness)
|
285   |
SQYD |
175.00 |
49,875.00 |
195.00 |
55,575.00 |
200.00 |
57,000.00 |
|
|
| 704-03 |
blocked out guard rail
|
250.2 |
LNFT |
21.00 |
5,254.20 |
22.00 |
5,504.40 |
21.00 |
5,254.20 |
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
50.0 |
LNFT |
43.00 |
2,150.00 |
43.00 |
2,150.00 |
45.00 |
2,250.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
60.00 |
6,000.00 |
59.00 |
5,900.00 |
60.00 |
6,000.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,200.00 |
8,800.00 |
2,200.00 |
8,800.00 |
2,500.00 |
10,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
11,000.00 |
11,000.00 |
35,000.00 |
35,000.00 |
125,000.00 |
125,000.00 |
|
|
| 713-02-C |
temporary pavement markings (8" width)
|
475   |
LNFT |
0.40 |
190.00 |
0.25 |
118.75 |
1.60 |
760.00 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
8.992 |
MILE |
450.00 |
4,046.40 |
130.00 |
1,168.96 |
250.00 |
2,248.00 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
8.992 |
MILE |
400.00 |
3,596.80 |
320.00 |
2,877.44 |
225.00 |
2,023.20 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
13.220 |
MILE |
650.00 |
8,593.00 |
630.00 |
8,328.60 |
375.00 |
4,957.50 |
|
|
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
3   |
EACH |
60.00 |
180.00 |
55.00 |
165.00 |
150.00 |
450.00 |
|
|
| 713-05-C |
temporary pavement legends and symbols (only)
|
3   |
EACH |
90.00 |
270.00 |
55.00 |
165.00 |
150.00 |
450.00 |
|
|
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
631   |
EACH |
1.00 |
631.00 |
1.75 |
1,104.25 |
2.00 |
1,262.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
0.2 |
TON |
3,100.00 |
620.00 |
3,200.00 |
640.00 |
3,000.00 |
600.00 |
|
|
| 717-01 |
seeding
|
5   |
LB |
26.00 |
130.00 |
27.00 |
135.00 |
25.00 |
125.00 |
|
|
| 718-01 |
fertilizer
|
120   |
LB |
2.50 |
300.00 |
3.00 |
360.00 |
3.00 |
360.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
70,000.00 |
70,000.00 |
144,000.00 |
144,000.00 |
170,000.00 |
170,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
75.00 |
300.00 |
80.00 |
320.00 |
75.00 |
300.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
602   |
EACH |
6.00 |
3,612.00 |
5.00 |
3,010.00 |
8.00 |
4,816.00 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
475   |
LNFT |
1.00 |
475.00 |
1.10 |
522.50 |
5.00 |
2,375.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
8.456 |
MILE |
3,000.00 |
25,368.00 |
2,600.00 |
21,985.60 |
3,000.00 |
25,368.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.228 |
MILE |
900.00 |
3,805.20 |
650.00 |
2,748.20 |
1,200.00 |
5,073.60 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
1   |
EACH |
210.00 |
210.00 |
225.00 |
225.00 |
800.00 |
800.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
1   |
EACH |
225.00 |
225.00 |
225.00 |
225.00 |
800.00 |
800.00 |
|
|
| 732-05 |
removal of existing markings
|
4.228 |
MILE |
4,000.00 |
16,912.00 |
4,000.00 |
16,912.00 |
3,300.00 |
13,952.40 |
|
|
| 735-01 |
mailboxes
|
2   |
EACH |
5.00 |
10.00 |
1.00 |
2.00 |
25.00 |
50.00 |
|
|
| 735-02 |
mailbox supports (single)
|
2   |
EACH |
500.00 |
1,000.00 |
500.00 |
1,000.00 |
500.00 |
1,000.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
7,500.00 |
7,500.00 |
7,500.00 |
7,500.00 |
|
|
| S-001 |
ultra-thin hmac wearing course system (0.75 inch thick)
|
71,116   |
SQYD |
9.00 |
640,044.00 |
9.80 |
696,936.80 |
9.00 |
640,044.00 |
|
|
| S-002 |
sawcuts for pavement patching
|
262   |
LNFT |
6.00 |
1,572.00 |
12.35 |
3,235.70 |
30.00 |
7,860.00 |
|
|
| S-003 |
rumble strips (ground-in)
|
4.2 |
MILE |
1,300.00 |
5,460.00 |
1,926.30 |
8,090.46 |
2,000.00 |
8,400.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,463,428.71 |
|
1,640,645.16 |
|
1,700,585.85 |
|
|
|