| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,000.00 |
5,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
90   |
SQYD |
25.00 |
2,250.00 |
16.00 |
1,440.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
4,600   |
CUYD |
18.00 |
82,800.00 |
23.00 |
105,800.00 |
|
|
|
|
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
1,856   |
CUYD |
15.00 |
27,840.00 |
32.00 |
59,392.00 |
|
|
|
|
| 308-01-A |
in-place cement treated base course (12" thick)
|
58,713   |
SQYD |
12.00 |
704,556.00 |
11.90 |
698,684.70 |
|
|
|
|
| 308-02 |
removal of existing patches
|
100   |
SQYD |
25.00 |
2,500.00 |
100.00 |
10,000.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
213   |
CUYD |
100.00 |
21,300.00 |
105.00 |
22,365.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
447.7 |
CUYD |
75.00 |
33,577.50 |
117.00 |
52,380.90 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
6,205.5 |
TON |
130.00 |
806,715.00 |
120.00 |
744,660.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
216.7 |
TON |
200.00 |
43,340.00 |
240.00 |
52,008.00 |
|
|
|
|
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
17,489   |
GAL |
4.50 |
78,700.50 |
6.00 |
104,934.00 |
|
|
|
|
| 507-02-C |
aggregate (s3)
|
56,414   |
SQYD |
0.90 |
50,772.60 |
2.25 |
126,931.50 |
|
|
|
|
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
119   |
LNFT |
110.00 |
13,090.00 |
110.00 |
13,090.00 |
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
28   |
LNFT |
150.00 |
4,200.00 |
150.00 |
4,200.00 |
|
|
|
|
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
8   |
LNFT |
150.00 |
1,200.00 |
165.00 |
1,320.00 |
|
|
|
|
| 701-10-O |
reinforced concrete pipe (extension)(48")
|
15   |
LNFT |
250.00 |
3,750.00 |
260.00 |
3,900.00 |
|
|
|
|
| 701-15 |
concrete collar
|
5   |
EACH |
700.00 |
3,500.00 |
775.00 |
3,875.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
69.2 |
SQYD |
75.00 |
5,190.00 |
75.00 |
5,190.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
140,000.00 |
140,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
7.983 |
MILE |
225.00 |
1,796.18 |
175.00 |
1,397.03 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
2.130 |
MILE |
200.00 |
426.00 |
390.00 |
830.70 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
29.204 |
MILE |
1.00 |
29.20 |
600.00 |
17,522.40 |
|
|
|
|
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
1,109   |
EACH |
1.75 |
1,940.75 |
2.00 |
2,218.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
15.5 |
TON |
500.00 |
7,750.00 |
550.00 |
8,525.00 |
|
|
|
|
| 717-01 |
seeding
|
348   |
LB |
8.50 |
2,958.00 |
8.00 |
2,784.00 |
|
|
|
|
| 718-01 |
fertilizer
|
7,740   |
LB |
0.70 |
5,418.00 |
0.70 |
5,418.00 |
|
|
|
|
| 726-01 |
bedding material
|
78.0 |
CUYD |
100.00 |
7,800.00 |
100.00 |
7,800.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
215,000.00 |
215,000.00 |
243,000.00 |
243,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
14   |
EACH |
100.00 |
1,400.00 |
110.00 |
1,540.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
528   |
EACH |
10.00 |
5,280.00 |
5.00 |
2,640.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
14.602 |
MILE |
3,000.00 |
43,806.00 |
3,000.00 |
43,806.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.065 |
MILE |
2,000.00 |
2,130.00 |
900.00 |
958.50 |
|
|
|
|
| 735-01 |
mailboxes
|
17   |
EACH |
25.00 |
425.00 |
5.00 |
85.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
15   |
EACH |
150.00 |
2,250.00 |
175.00 |
2,625.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
1   |
EACH |
200.00 |
200.00 |
250.00 |
250.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
25,000.00 |
25,000.00 |
35,000.00 |
35,000.00 |
|
|
|
|
| S-001 |
tree trimming
|
lump |
LUMP |
40,000.00 |
40,000.00 |
42,000.00 |
42,000.00 |
|
|
|
|
| S-002 |
cleaning existing ditches
|
675   |
LNFT |
10.00 |
6,750.00 |
10.00 |
6,750.00 |
|
|
|
|
| S-003 |
saw cutting concrete drives (6" depth) in asphaltic
concrete overlay |
67   |
LNFT |
8.00 |
536.00 |
11.00 |
737.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,401,176.73 |
|