| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - HUEY STOCKSTILL, INC. |
- 2 - BARRIERE CONSTRUCTION CO., LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-07 |
borrow (vehicular measurement)
|
100   |
CUYD |
10.00 |
1,000.00 |
1.00 |
100.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
397   |
CUYD |
60.00 |
23,820.00 |
1.00 |
397.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
2,873.3 |
TON |
78.00 |
224,117.40 |
83.00 |
238,483.90 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
250.0 |
TON |
78.00 |
19,500.00 |
83.00 |
20,750.00 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
2,000   |
SQYD |
70.00 |
140,000.00 |
74.00 |
148,000.00 |
|
|
|
|
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
12   |
LNFT |
25.00 |
300.00 |
100.00 |
1,200.00 |
|
|
|
|
| 701-15 |
concrete collar
|
1   |
EACH |
5,000.00 |
5,000.00 |
2,000.00 |
2,000.00 |
|
|
|
|
| 712-02 |
sacked concrete revetment
|
100   |
SQYD |
30.00 |
3,000.00 |
50.00 |
5,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
5,000.00 |
5,000.00 |
60,000.00 |
60,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
2.900 |
MILE |
10.00 |
29.00 |
150.00 |
435.00 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
2.840 |
MILE |
10.00 |
28.40 |
0.10 |
0.28 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
6.390 |
MILE |
10.00 |
63.90 |
0.10 |
0.64 |
|
|
|
|
| 713-05-D |
temporary pavement legends and symbols (rr crossing)
|
2   |
EACH |
10.00 |
20.00 |
0.10 |
0.20 |
|
|
|
|
| 726-01 |
bedding material
|
5.0 |
CUYD |
120.00 |
600.00 |
50.00 |
250.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
27,000.00 |
27,000.00 |
60,000.00 |
60,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
818   |
EACH |
4.00 |
3,272.00 |
5.00 |
4,090.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
6.390 |
MILE |
800.00 |
5,112.00 |
2,250.00 |
14,377.50 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.840 |
MILE |
800.00 |
2,272.00 |
800.00 |
2,272.00 |
|
|
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
1   |
EACH |
450.00 |
450.00 |
400.00 |
400.00 |
|
|
|
|
| 735-01 |
mailboxes
|
50   |
EACH |
1.00 |
50.00 |
1.00 |
50.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
44   |
EACH |
70.00 |
3,080.00 |
1.00 |
44.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
3   |
EACH |
100.00 |
300.00 |
0.10 |
0.30 |
|
|
|
|
| 735-04 |
mailbox supports (multiple)
|
3   |
EACH |
150.00 |
450.00 |
0.10 |
0.30 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
2,000.00 |
2,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-001 |
cleaning existing culverts (18" to 36")
|
50   |
LNFT |
4.00 |
200.00 |
5.00 |
250.00 |
|
|
|
|
| S-002 |
cleaning existing culverts (greater than 36")
|
426   |
LNFT |
4.00 |
1,704.00 |
10.00 |
4,260.00 |
|
|
|
|
| S-003 |
surface preparation
|
lump |
LUMP |
43,700.00 |
43,700.00 |
60,000.00 |
60,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
512,068.70 |
|
642,361.12 |
|
|
|
|
|