February 06, 2014 Error processing SSI file

Letting of 10/29/2008 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 829-10-0018
Parish: LAFOURCHE
Routes: LA 654
Description: LA 308 TO DEGRUISE LANE
Type Const: surface preparation, drainage structures, pavement patching, superpave asphaltic
concrete pavement, and related work.
Estimated Construction Cost: $852,445.16
 
RankLicenseBidderConstruction Bid
1 06487 HUEY STOCKSTILL, INC. $512,068.70
2 06276 BARRIERE CONSTRUCTION CO., LLC $642,361.12
 
Item Number Item Description Quantity Unit of Measure - 1 -
HUEY STOCKSTILL, INC.
- 2 -
BARRIERE CONSTRUCTION CO., LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-07 borrow (vehicular measurement) 100      CUYD 10.00 1,000.00 1.00 100.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
397      CUYD 60.00 23,820.00 1.00 397.00        
502-01 superpave asphaltic concrete 2,873.3    TON 78.00 224,117.40 83.00 238,483.90        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
250.0    TON 78.00 19,500.00 83.00 20,750.00        
510-01-B pavement patching (12" minimum thickness) 2,000      SQYD 70.00 140,000.00 74.00 148,000.00        
701-01-I cross drain pipe (24" rcp/pcp) 12      LNFT 25.00 300.00 100.00 1,200.00        
701-15 concrete collar 1      EACH 5,000.00 5,000.00 2,000.00 2,000.00        
712-02 sacked concrete revetment 100      SQYD 30.00 3,000.00 50.00 5,000.00        
713-01 temporary signs & barricades lump      LUMP 5,000.00 5,000.00 60,000.00 60,000.00        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
2.900  MILE 10.00 29.00 150.00 435.00        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
2.840  MILE 10.00 28.40 0.10 0.28        
713-04-A temporary pavement markings (solid line)(4" width) 6.390  MILE 10.00 63.90 0.10 0.64        
713-05-D temporary pavement legends and symbols (rr crossing) 2      EACH 10.00 20.00 0.10 0.20        
726-01 bedding material 5.0    CUYD 120.00 600.00 50.00 250.00        
727-01 mobilization lump      LUMP 27,000.00 27,000.00 60,000.00 60,000.00        
731-02 reflectorized raised pavement markers 818      EACH 4.00 3,272.00 5.00 4,090.00        
732-02-A plastic pavement striping (solid line) (4" width) 6.390  MILE 800.00 5,112.00 2,250.00 14,377.50        
732-03-A plastic pavement striping (broken line)(4" width) 2.840  MILE 800.00 2,272.00 800.00 2,272.00        
732-04-D plastic pavement legends & symbols (rr crossing) 1      EACH 450.00 450.00 400.00 400.00        
735-01 mailboxes 50      EACH 1.00 50.00 1.00 50.00        
735-02 mailbox supports (single) 44      EACH 70.00 3,080.00 1.00 44.00        
735-03 mailbox supports (double) 3      EACH 100.00 300.00 0.10 0.30        
735-04 mailbox supports (multiple) 3      EACH 150.00 450.00 0.10 0.30        
740-01 construction layout lump      LUMP 2,000.00 2,000.00 20,000.00 20,000.00        
S-001 cleaning existing culverts (18" to 36") 50      LNFT 4.00 200.00 5.00 250.00        
S-002 cleaning existing culverts (greater than 36") 426      LNFT 4.00 1,704.00 10.00 4,260.00        
S-003 surface preparation lump      LUMP 43,700.00 43,700.00 60,000.00 60,000.00        
                       
 CONTRACTOR TOTAL       512,068.70   642,361.12        