| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
584   |
CUYD |
55.00 |
32,120.00 |
150.00 |
87,600.00 |
150.00 |
87,600.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
2,652.4 |
TON |
115.00 |
305,026.00 |
130.00 |
344,812.00 |
130.00 |
344,812.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
145.7 |
TON |
200.00 |
29,140.00 |
225.00 |
32,782.50 |
225.00 |
32,782.50 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
83   |
SQYD |
50.00 |
4,150.00 |
165.00 |
13,695.00 |
41.00 |
3,403.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 5   |
CUYD |
1.00 |
- 5.00 |
0.10 |
- 0.50 |
10.00 |
- 50.00 |
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
522   |
SQYD |
130.00 |
67,860.00 |
130.00 |
67,860.00 |
150.00 |
78,300.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
15,000.00 |
15,000.00 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
3.545 |
MILE |
350.00 |
1,240.75 |
583.00 |
2,066.74 |
800.00 |
2,836.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
33,000.00 |
33,000.00 |
40,000.00 |
40,000.00 |
45,000.00 |
45,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
235   |
EACH |
11.00 |
2,585.00 |
4.50 |
1,057.50 |
8.00 |
1,880.00 |
|
|
| 732-02-A-03 |
plast pvmt striping(solid line)(4" width)hot appl
thermo (40mil thickness) |
3.545 |
MILE |
2,800.00 |
9,926.00 |
2,500.00 |
8,862.50 |
4,000.00 |
14,180.00 |
|
|
| 735-01 |
mailboxes
|
12   |
EACH |
1.00 |
12.00 |
5.00 |
60.00 |
25.00 |
300.00 |
|
|
| 735-02 |
mailbox supports (single)
|
12   |
EACH |
125.00 |
1,500.00 |
130.00 |
1,560.00 |
150.00 |
1,800.00 |
|
|
| S-001 |
sawcuts for pavement patching
|
1,031   |
LNFT |
8.00 |
8,248.00 |
4.50 |
4,639.50 |
5.75 |
5,928.25 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
499,802.75 |
|
609,995.24 |
|
633,771.75 |
|
|
|