| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - HUEY STOCKSTILL, INC. |
- 2 - BARBER BROS. CONTRACTING CO., L.L.C |
- 3 - BARRIERE CONSTRUCTION CO., LLC |
- 4 - COASTAL BRIDGE CO., L.L.C. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 204-02 |
temporary hay or straw bales
|
22   |
EACH |
1.00 |
22.00 |
35.00 |
770.00 |
1.00 |
22.00 |
25.00 |
550.00 |
| 204-06 |
temporary silt fencing
|
2,650   |
LNFT |
0.10 |
265.00 |
1.85 |
4,902.50 |
0.50 |
1,325.00 |
3.00 |
7,950.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,387   |
CUYD |
32.00 |
44,384.00 |
82.00 |
113,734.00 |
1.00 |
1,387.00 |
90.00 |
124,830.00 |
| 502-01 |
superpave asphaltic concrete
|
7,658.1 |
TON |
82.00 |
627,964.20 |
100.00 |
765,810.00 |
99.00 |
758,151.90 |
105.85 |
810,609.89 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,217.6 |
TON |
82.00 |
99,843.20 |
120.00 |
146,112.00 |
99.00 |
120,542.40 |
105.85 |
128,882.96 |
| 509-01-A |
cold planing asphaltic pavement (1 1/2" average depth)
|
1,887   |
SQYD |
2.00 |
3,774.00 |
4.00 |
7,548.00 |
1.00 |
1,887.00 |
8.00 |
15,096.00 |
| 509-01-B |
cold planing asphaltic pavement (2" deep)
|
398   |
SQYD |
4.00 |
1,592.00 |
12.00 |
4,776.00 |
1.00 |
398.00 |
8.00 |
3,184.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 75   |
CUYD |
0.00 |
0.00 |
0.00 |
0.00 |
1.00 |
- 75.00 |
0.00 |
0.00 |
| 510-01-B |
pavement patching (12" minimum thickness)
|
4,099   |
SQYD |
69.00 |
282,831.00 |
75.00 |
307,425.00 |
90.00 |
368,910.00 |
82.50 |
338,167.50 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
100,000.00 |
100,000.00 |
15,000.00 |
15,000.00 |
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
5.200 |
MILE |
160.00 |
832.00 |
375.00 |
1,950.00 |
100.00 |
520.00 |
400.00 |
2,080.00 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
4.095 |
MILE |
10.00 |
40.95 |
515.00 |
2,108.93 |
0.10 |
0.41 |
350.00 |
1,433.25 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
5.055 |
MILE |
10.00 |
50.55 |
800.00 |
4,044.00 |
0.10 |
0.51 |
525.00 |
2,653.88 |
| 727-01 |
mobilization
|
lump |
LUMP |
135,000.00 |
135,000.00 |
50,000.00 |
50,000.00 |
150,000.00 |
150,000.00 |
215,000.00 |
215,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
30   |
EACH |
50.00 |
1,500.00 |
75.00 |
2,250.00 |
50.00 |
1,500.00 |
75.00 |
2,250.00 |
| 729-16-C |
object marker assembly (type 3)
|
6   |
EACH |
75.00 |
450.00 |
80.00 |
480.00 |
75.00 |
450.00 |
85.00 |
510.00 |
| 731-02 |
reflectorized raised pavement markers
|
690   |
EACH |
4.50 |
3,105.00 |
7.00 |
4,830.00 |
5.00 |
3,450.00 |
5.75 |
3,967.50 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
5.055 |
MILE |
3,500.00 |
17,692.50 |
2,500.00 |
12,637.50 |
2,200.00 |
11,121.00 |
3,100.00 |
15,670.50 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.095 |
MILE |
500.00 |
2,047.50 |
915.00 |
3,746.93 |
800.00 |
3,276.00 |
775.00 |
3,173.63 |
| 735-01 |
mailboxes
|
94   |
EACH |
1.00 |
94.00 |
5.00 |
470.00 |
1.00 |
94.00 |
1.00 |
94.00 |
| 735-02 |
mailbox supports (single)
|
75   |
EACH |
95.00 |
7,125.00 |
145.00 |
10,875.00 |
100.00 |
7,500.00 |
125.00 |
9,375.00 |
| 735-03 |
mailbox supports (double)
|
2   |
EACH |
125.00 |
250.00 |
150.00 |
300.00 |
125.00 |
250.00 |
250.00 |
500.00 |
| 735-04 |
mailbox supports (multiple)
|
5   |
EACH |
225.00 |
1,125.00 |
300.00 |
1,500.00 |
225.00 |
1,125.00 |
400.00 |
2,000.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
3,300.00 |
3,300.00 |
1,500.00 |
1,500.00 |
27,000.00 |
27,000.00 |
15,000.00 |
15,000.00 |
| S-001 |
surface preparation
|
lump |
LUMP |
59,000.00 |
59,000.00 |
70,000.00 |
70,000.00 |
140,000.00 |
140,000.00 |
20,000.00 |
20,000.00 |
| S-002 |
saw cutting asphaltic concrete patches (12" deep)
|
6,776   |
LNFT |
8.35 |
56,579.60 |
8.00 |
54,208.00 |
0.10 |
677.60 |
6.00 |
40,656.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,358,867.50 |
|
1,581,977.86 |
|
1,699,512.82 |
|
1,778,634.11 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 204-02 |
temporary hay or straw bales
|
22   |
EACH |
10.00 |
220.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
2,650   |
LNFT |
1.50 |
3,975.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,387   |
CUYD |
40.00 |
55,480.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
7,658.1 |
TON |
100.00 |
765,810.00 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,217.6 |
TON |
150.00 |
182,640.00 |
|
|
|
|
|
|
| 509-01-A |
cold planing asphaltic pavement (1 1/2" average depth)
|
1,887   |
SQYD |
15.00 |
28,305.00 |
|
|
|
|
|
|
| 509-01-B |
cold planing asphaltic pavement (2" deep)
|
398   |
SQYD |
15.00 |
5,970.00 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 75   |
CUYD |
0.01 |
- 0.75 |
|
|
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
4,099   |
SQYD |
70.00 |
286,930.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
180,000.00 |
180,000.00 |
|
|
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
5.200 |
MILE |
600.00 |
3,120.00 |
|
|
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
4.095 |
MILE |
100.00 |
409.50 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
5.055 |
MILE |
100.00 |
505.50 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
200,000.00 |
200,000.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
30   |
EACH |
60.00 |
1,800.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
6   |
EACH |
80.00 |
480.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
690   |
EACH |
6.00 |
4,140.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
5.055 |
MILE |
3,000.00 |
15,165.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.095 |
MILE |
900.00 |
3,685.50 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
94   |
EACH |
5.00 |
470.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
75   |
EACH |
125.00 |
9,375.00 |
|
|
|
|
|
|
| 735-03 |
mailbox supports (double)
|
2   |
EACH |
150.00 |
300.00 |
|
|
|
|
|
|
| 735-04 |
mailbox supports (multiple)
|
5   |
EACH |
275.00 |
1,375.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
30,000.00 |
30,000.00 |
|
|
|
|
|
|
| S-001 |
surface preparation
|
lump |
LUMP |
65,000.00 |
65,000.00 |
|
|
|
|
|
|
| S-002 |
saw cutting asphaltic concrete patches (12" deep)
|
6,776   |
LNFT |
5.00 |
33,880.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,879,034.75 |
|
|
|
|
|
|
|