| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GUINN BROTHERS, LLC. |
- 2 - CHAMBERS CONSTRUCTION CO., INC. |
- 3 - RCS CONTRACTORS, INC. |
- 4 - BOH BROS. CONSTRUCTION CO., LLC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
40,000.00 |
40,000.00 |
46,834.28 |
46,834.28 |
75,000.00 |
75,000.00 |
35,000.00 |
35,000.00 |
| 202-02-A-01 |
removal of bridge (sta. 1+150 - 6.1m x 10.1m timber
bridge |
1   |
ea |
10,000.00 |
10,000.00 |
2,967.58 |
2,967.58 |
6,500.00 |
6,500.00 |
16,000.00 |
16,000.00 |
| 202-02-A-02 |
removal of bridge (sta. 1+150 - 6.2m x 6.0m timber
bridge) |
1   |
ea |
10,000.00 |
10,000.00 |
7,436.45 |
7,436.45 |
6,500.00 |
6,500.00 |
16,000.00 |
16,000.00 |
| 202-02-A-03 |
removal of bridge (sta. 1+150 - 7.5m x 17.8m timber
bridge) |
1   |
ea |
10,000.00 |
10,000.00 |
9,403.11 |
9,403.11 |
8,500.00 |
8,500.00 |
25,000.00 |
25,000.00 |
| 203-05 |
excavation & embankment
|
lump |
lump |
45,000.00 |
45,000.00 |
86,946.16 |
86,946.16 |
48,625.00 |
48,625.00 |
85,000.00 |
85,000.00 |
| 204-02 |
temporary hay or straw bales
|
40   |
ea |
10.00 |
400.00 |
32.93 |
1,317.20 |
15.00 |
600.00 |
22.20 |
888.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
ea |
100.00 |
800.00 |
257.96 |
2,063.68 |
158.00 |
1,264.00 |
220.00 |
1,760.00 |
| 204-06 |
temporary silt fencing
|
120   |
ln m |
10.00 |
1,200.00 |
8.76 |
1,051.20 |
10.00 |
1,200.00 |
7.50 |
900.00 |
| 302-01 |
class ii base course
|
357.3 |
cu m |
115.00 |
41,089.50 |
210.50 |
75,211.65 |
253.39 |
90,536.25 |
158.50 |
56,632.05 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
27   |
cu m |
150.00 |
4,050.00 |
242.17 |
6,538.59 |
125.00 |
3,375.00 |
140.00 |
3,780.00 |
| 502-01 |
superpave asphaltic concrete
|
328.9 |
Mg |
400.00 |
131,560.00 |
381.27 |
125,399.70 |
220.00 |
72,358.00 |
278.00 |
91,434.20 |
| 701-01-P |
cross drain pipe (1350 mm rcp/pcp )
|
60.0 |
ln m |
725.00 |
43,500.00 |
757.81 |
45,468.60 |
1,066.87 |
64,012.20 |
854.00 |
51,240.00 |
| 701-02-J |
cross drain pipe arch (1500 mm equiv. rcpa)
|
100.0 |
ln m |
1,168.00 |
116,800.00 |
831.46 |
83,146.00 |
1,363.81 |
136,381.00 |
971.00 |
97,100.00 |
| 704-03 |
blocked out guard rail
|
15.24 |
ln m |
100.00 |
1,524.00 |
84.56 |
1,288.69 |
72.00 |
1,097.28 |
73.00 |
1,112.52 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
30.48 |
ln m |
250.00 |
7,620.00 |
201.64 |
6,145.99 |
170.00 |
5,181.60 |
172.00 |
5,242.56 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
ea |
3,000.00 |
12,000.00 |
3,252.52 |
13,010.08 |
2,750.00 |
11,000.00 |
2,775.00 |
11,100.00 |
| 705-01 |
barbed wire fence
|
120   |
ln m |
25.00 |
3,000.00 |
52.15 |
6,258.00 |
25.00 |
3,000.00 |
36.50 |
4,380.00 |
| 712-02-A |
sacked concrete revetment headwall and slope
protection |
37   |
cm |
865.00 |
32,005.00 |
861.63 |
31,880.31 |
865.00 |
32,005.00 |
512.00 |
18,944.00 |
| 712-04 |
flexible revetment
|
589   |
sq m |
110.00 |
64,790.00 |
92.64 |
54,564.96 |
85.00 |
50,065.00 |
108.00 |
63,612.00 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
25,000.00 |
25,000.00 |
26,888.79 |
26,888.79 |
18,000.00 |
18,000.00 |
25,000.00 |
25,000.00 |
| 716-01-A |
mulch (vegetative)
|
1,800.0 |
kg |
3.30 |
5,940.00 |
3.26 |
5,868.00 |
0.80 |
1,440.00 |
0.78 |
1,404.00 |
| 717-01 |
seeding
|
13   |
kg |
70.00 |
910.00 |
31.19 |
405.47 |
25.00 |
325.00 |
25.60 |
332.80 |
| 718-01 |
fertilizer
|
335   |
kg |
2.25 |
753.75 |
2.14 |
716.90 |
2.00 |
670.00 |
1.85 |
619.75 |
| 726-01 |
bedding material
|
132.9 |
cu m |
132.00 |
17,542.80 |
97.13 |
12,908.58 |
145.00 |
19,270.50 |
72.15 |
9,588.74 |
| 727-01 |
mobilization
|
lump |
lump |
95,000.00 |
95,000.00 |
67,560.93 |
67,560.93 |
75,000.00 |
75,000.00 |
140,000.00 |
140,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
8   |
ea |
100.00 |
800.00 |
83.84 |
670.72 |
90.00 |
720.00 |
73.00 |
584.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
ea |
150.00 |
600.00 |
104.08 |
416.32 |
90.00 |
360.00 |
90.00 |
360.00 |
| 740-01 |
construction layout
|
lump |
lump |
6,000.00 |
6,000.00 |
14,574.55 |
14,574.55 |
10,000.00 |
10,000.00 |
49,000.00 |
49,000.00 |
| 804-01-B |
precast concrete piles (350 mm)
|
492.0 |
ln m |
155.00 |
76,260.00 |
174.58 |
85,893.36 |
185.00 |
91,020.00 |
192.00 |
94,464.00 |
| 804-12 |
loading permanent piles
|
1   |
ea |
1.00 |
1.00 |
1,301.01 |
1,301.01 |
1,000.00 |
1,000.00 |
10,000.00 |
10,000.00 |
| 805-10-A |
bridge superstructure & substructure(8.5m clear
raodway;90 degree crossing) (cast-in-place) |
5   |
span |
32,500.00 |
162,500.00 |
42,928.78 |
214,643.90 |
46,500.00 |
232,500.00 |
41,500.00 |
207,500.00 |
| S-101 |
concrete approach slab(8.5m clear roadway;90 degree
crossing) |
2   |
ea |
12,000.00 |
24,000.00 |
9,949.93 |
19,899.86 |
8,000.00 |
16,000.00 |
9,200.00 |
18,400.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
990,646.05 |
|
1,058,680.62 |
|
1,083,505.83 |
|
1,142,378.62 |
|