Letting of 10/29/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 713-46-0107
Parish: ST HELENA
Routes:
Description: SHILOH BAPTIST CHURCH ROAD BRIDGES I & II& REEVES RD.BRIDGE
Type Const: grading, drainage structures, class ii base course, superpave asphaltic concrete
pavement, concrete slab span bridges, and related work.
Estimated Construction Cost: $918,828.50
 
RankLicenseBidderConstruction Bid
1 09090 GUINN BROTHERS, LLC. $990,646.05
2 02109 CHAMBERS CONSTRUCTION CO., INC. $1,058,680.62
3 25088 RCS CONTRACTORS, INC. $1,083,505.83
4 02179 BOH BROS. CONSTRUCTION CO., LLC. $1,142,378.62
 
Item Number Item Description Quantity Unit of Measure - 1 -
GUINN BROTHERS, LLC.
- 2 -
CHAMBERS CONSTRUCTION CO., INC.
- 3 -
RCS CONTRACTORS, INC.
- 4 -
BOH BROS. CONSTRUCTION CO., LLC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 40,000.00 40,000.00 46,834.28 46,834.28 75,000.00 75,000.00 35,000.00 35,000.00
202-02-A-01 removal of bridge (sta. 1+150 - 6.1m x 10.1m timber
bridge
1      ea 10,000.00 10,000.00 2,967.58 2,967.58 6,500.00 6,500.00 16,000.00 16,000.00
202-02-A-02 removal of bridge (sta. 1+150 - 6.2m x 6.0m timber
bridge)
1      ea 10,000.00 10,000.00 7,436.45 7,436.45 6,500.00 6,500.00 16,000.00 16,000.00
202-02-A-03 removal of bridge (sta. 1+150 - 7.5m x 17.8m timber
bridge)
1      ea 10,000.00 10,000.00 9,403.11 9,403.11 8,500.00 8,500.00 25,000.00 25,000.00
203-05 excavation & embankment lump      lump 45,000.00 45,000.00 86,946.16 86,946.16 48,625.00 48,625.00 85,000.00 85,000.00
204-02 temporary hay or straw bales 40      ea 10.00 400.00 32.93 1,317.20 15.00 600.00 22.20 888.00
204-05-A temporary sediment check dams (hay) 8      ea 100.00 800.00 257.96 2,063.68 158.00 1,264.00 220.00 1,760.00
204-06 temporary silt fencing 120      ln m 10.00 1,200.00 8.76 1,051.20 10.00 1,200.00 7.50 900.00
302-01 class ii base course 357.3    cu m 115.00 41,089.50 210.50 75,211.65 253.39 90,536.25 158.50 56,632.05
401-02 aggregate surface course (adjusted vehicular
measurement)
27      cu m 150.00 4,050.00 242.17 6,538.59 125.00 3,375.00 140.00 3,780.00
502-01 superpave asphaltic concrete 328.9    Mg 400.00 131,560.00 381.27 125,399.70 220.00 72,358.00 278.00 91,434.20
701-01-P cross drain pipe (1350 mm rcp/pcp ) 60.0    ln m 725.00 43,500.00 757.81 45,468.60 1,066.87 64,012.20 854.00 51,240.00
701-02-J cross drain pipe arch (1500 mm equiv. rcpa) 100.0    ln m 1,168.00 116,800.00 831.46 83,146.00 1,363.81 136,381.00 971.00 97,100.00
704-03 blocked out guard rail 15.24   ln m 100.00 1,524.00 84.56 1,288.69 72.00 1,097.28 73.00 1,112.52
704-08-B guard rail transitions (double thrie beam) 30.48   ln m 250.00 7,620.00 201.64 6,145.99 170.00 5,181.60 172.00 5,242.56
704-11-A guard rail end treatment (flared) 4      ea 3,000.00 12,000.00 3,252.52 13,010.08 2,750.00 11,000.00 2,775.00 11,100.00
705-01 barbed wire fence 120      ln m 25.00 3,000.00 52.15 6,258.00 25.00 3,000.00 36.50 4,380.00
712-02-A sacked concrete revetment headwall and slope
protection
37      cm 865.00 32,005.00 861.63 31,880.31 865.00 32,005.00 512.00 18,944.00
712-04 flexible revetment 589      sq m 110.00 64,790.00 92.64 54,564.96 85.00 50,065.00 108.00 63,612.00
713-01 temporary signs & barricades lump      lump 25,000.00 25,000.00 26,888.79 26,888.79 18,000.00 18,000.00 25,000.00 25,000.00
716-01-A mulch (vegetative) 1,800.0    kg 3.30 5,940.00 3.26 5,868.00 0.80 1,440.00 0.78 1,404.00
717-01 seeding 13      kg 70.00 910.00 31.19 405.47 25.00 325.00 25.60 332.80
718-01 fertilizer 335      kg 2.25 753.75 2.14 716.90 2.00 670.00 1.85 619.75
726-01 bedding material 132.9    cu m 132.00 17,542.80 97.13 12,908.58 145.00 19,270.50 72.15 9,588.74
727-01 mobilization lump      lump 95,000.00 95,000.00 67,560.93 67,560.93 75,000.00 75,000.00 140,000.00 140,000.00
729-16-B object marker assembly (type 2) 8      ea 100.00 800.00 83.84 670.72 90.00 720.00 73.00 584.00
729-16-C object marker assembly (type 3) 4      ea 150.00 600.00 104.08 416.32 90.00 360.00 90.00 360.00
740-01 construction layout lump      lump 6,000.00 6,000.00 14,574.55 14,574.55 10,000.00 10,000.00 49,000.00 49,000.00
804-01-B precast concrete piles (350 mm) 492.0    ln m 155.00 76,260.00 174.58 85,893.36 185.00 91,020.00 192.00 94,464.00
804-12 loading permanent piles 1      ea 1.00 1.00 1,301.01 1,301.01 1,000.00 1,000.00 10,000.00 10,000.00
805-10-A bridge superstructure & substructure(8.5m clear
raodway;90 degree crossing) (cast-in-place)
5      span 32,500.00 162,500.00 42,928.78 214,643.90 46,500.00 232,500.00 41,500.00 207,500.00
S-101 concrete approach slab(8.5m clear roadway;90 degree
crossing)
2      ea 12,000.00 24,000.00 9,949.93 19,899.86 8,000.00 16,000.00 9,200.00 18,400.00
                       
 CONTRACTOR TOTAL       990,646.05   1,058,680.62   1,083,505.83   1,142,378.62