Letting of 10/29/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 713-14-0107
Parish: CLAIBORNE
Routes:
Description: CYPRESS BOTTOM RD. & MT. OLIVE RD BRIDGES
Type Const: grading, removal of bridge, class ii base course, superpave ashpaltic concrete,
bridge superstriucture, concrete box culverts and related work.
Estimated Construction Cost: $932,622.50
 
RankLicenseBidderConstruction Bid
1 23112 BEN ALLEN, INC. $790,391.50
2 18546 C W & W CONTRACTORS, INC. $806,029.50
3 49864 TERRAL CONSTRUCTION L.L.C.� $891,453.30
4 50078 FENTON EXCAVATING & CONST. INC. $947,208.90
5 09090 GUINN BROTHERS, LLC. $1,100,040.50
 
Item Number Item Description Quantity Unit of Measure - 1 -
BEN ALLEN, INC.
- 2 -
C W & W CONTRACTORS, INC.
- 3 -
TERRAL CONSTRUCTION L.L.C.�
- 4 -
FENTON EXCAVATING & CONST. INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 8,000.00 8,000.00 10,000.00 10,000.00 28,000.00 28,000.00 30,000.00 30,000.00
202-01 removal of structures & obstructions lump      LUMP 10,000.00 10,000.00 6,000.00 6,000.00 8,000.00 8,000.00 14,350.00 14,350.00
202-02-A-01 removal of bridges (sta 15+00; 23.3' x 31' timber) 1      EACH 3,500.00 3,500.00 5,000.00 5,000.00 7,000.00 7,000.00 4,565.00 4,565.00
203-05 excavation and embankment lump      LUMP 50,000.00 50,000.00 66,000.00 66,000.00 47,000.00 47,000.00 65,692.00 65,692.00
204-03 temporary slope drains 84      LNFT 0.00 0.00 10.00 840.00 1.00 84.00 12.00 1,008.00
204-05-A temporary sediment check dams (hay) 8      EACH 0.00 0.00 100.00 800.00 75.00 600.00 177.00 1,416.00
204-06 temporary silt fencing 2,200      LNFT 4.00 8,800.00 1.00 2,200.00 2.00 4,400.00 2.95 6,490.00
302-01-A class ii base course (stone) 428.0    CUYD 115.00 49,220.00 100.00 42,800.00 153.00 65,484.00 87.00 37,236.00
401-02 aggregate surface course (adjusted vehicular
measurement)
46      CUYD 115.00 5,290.00 100.00 4,600.00 253.00 11,638.00 98.00 4,508.00
403-01 aggregate roadway surfacing (vehicular measurement) 47.2    CUYD 115.00 5,428.00 100.00 4,720.00 253.00 11,941.60 112.00 5,286.40
502-01 superpave asphaltic concrete 331.9    TON 200.00 66,380.00 175.00 58,082.50 330.00 109,527.00 306.00 101,561.40
701-12-U corrugated metal pipe (extension)(84") 10      LNFT 500.00 5,000.00 750.00 7,500.00 500.00 5,000.00 563.00 5,630.00
701-15 concrete collar 1      EACH 800.00 800.00 4,000.00 4,000.00 2,000.00 2,000.00 1,062.00 1,062.00
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 66.00 6,600.00 70.00 7,000.00 60.00 6,000.00 71.00 7,100.00
704-09 guard rail anchor sections (turndown) 100.0    LNFT 72.00 7,200.00 40.00 4,000.00 35.00 3,500.00 80.00 8,000.00
707-04 asphaltic curb 40.0    LNFT 10.00 400.00 90.00 3,600.00 20.00 800.00 14.00 560.00
711-01-D riprap (55 lb, 18" thick ) 350      SQYD 83.00 29,050.00 90.00 31,500.00 114.00 39,900.00 95.00 33,250.00
711-03-E riprap (130 lb) 280.0    TON 90.00 25,200.00 90.00 25,200.00 82.00 22,960.00 88.00 24,640.00
711-04 geotextile fabric 350      SQYD 3.00 1,050.00 3.00 1,050.00 14.00 4,900.00 3.00 1,050.00
713-01 temporary signs & barricades lump      LUMP 12,000.00 12,000.00 12,000.00 12,000.00 13,000.00 13,000.00 13,600.00 13,600.00
716-01-A mulch (vegetative) 1.6    TON 500.00 800.00 3,000.00 4,800.00 650.00 1,040.00 708.00 1,132.80
717-01 seeding 37      LB 25.00 925.00 50.00 1,850.00 12.00 444.00 12.00 444.00
718-01 fertilizer 800      LB 0.50 400.00 3.00 2,400.00 1.00 800.00 0.60 480.00
726-01 bedding material 67.9    CUYD 115.00 7,808.50 120.00 8,148.00 193.00 13,104.70 109.00 7,401.10
727-01 mobilization lump      LUMP 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 84,550.00 84,550.00
729-16-B object marker assembly (type 2) 4      EACH 75.00 300.00 100.00 400.00 75.00 300.00 77.00 308.00
729-16-C object marker assembly (type 3) 8      EACH 85.00 680.00 120.00 960.00 110.00 880.00 94.00 752.00
740-01 construction layout lump      LUMP 8,000.00 8,000.00 10,000.00 10,000.00 8,000.00 8,000.00 18,000.00 18,000.00
804-01-B precast concrete piles (14") 960      LNFT 62.00 59,520.00 90.00 86,400.00 68.00 65,280.00 98.00 94,080.00
804-12 loading permanent piles 1      EACH 0.00 0.00 1.00 1.00 1,000.00 1,000.00 5,014.00 5,014.00
805-01-B class a concrete (box culvert headwalls) 37.84   CUYD 1,150.00 43,516.00 1,300.00 49,192.00 1,200.00 45,408.00 830.00 31,407.20
805-10-A bridge superstructure & substructure,24' clear roadway,
cast-in-place only)
7      SPAN 27,000.00 189,000.00 23,000.00 161,000.00 30,000.00 210,000.00 29,500.00 206,500.00
805-12-P reinforced concrete box culverts (7'x 7') 168.0    LNFT 775.00 130,200.00 750.00 126,000.00 600.00 100,800.00 735.00 123,480.00
806-01 deformed reinforcing steel 2,662      LB 2.00 5,324.00 3.00 7,986.00 1.00 2,662.00 2.50 6,655.00
                       
 CONTRACTOR TOTAL       790,391.50   806,029.50   891,453.30   947,208.90
 
Item Number Item Description Quantity Unit of Measure - 5 -
GUINN BROTHERS, LLC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 42,000.00 42,000.00            
202-01 removal of structures & obstructions lump      LUMP 25,000.00 25,000.00            
202-02-A-01 removal of bridges (sta 15+00; 23.3' x 31' timber) 1      EACH 6,000.00 6,000.00            
203-05 excavation and embankment lump      LUMP 80,000.00 80,000.00            
204-03 temporary slope drains 84      LNFT 10.00 840.00            
204-05-A temporary sediment check dams (hay) 8      EACH 100.00 800.00            
204-06 temporary silt fencing 2,200      LNFT 5.00 11,000.00            
302-01-A class ii base course (stone) 428.0    CUYD 100.00 42,800.00            
401-02 aggregate surface course (adjusted vehicular
measurement)
46      CUYD 100.00 4,600.00            
403-01 aggregate roadway surfacing (vehicular measurement) 47.2    CUYD 100.00 4,720.00            
502-01 superpave asphaltic concrete 331.9    TON 275.00 91,272.50            
701-12-U corrugated metal pipe (extension)(84") 10      LNFT 1,275.00 12,750.00            
701-15 concrete collar 1      EACH 10,000.00 10,000.00            
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 90.00 9,000.00            
704-09 guard rail anchor sections (turndown) 100.0    LNFT 65.00 6,500.00            
707-04 asphaltic curb 40.0    LNFT 50.00 2,000.00            
711-01-D riprap (55 lb, 18" thick ) 350      SQYD 100.00 35,000.00            
711-03-E riprap (130 lb) 280.0    TON 100.00 28,000.00            
711-04 geotextile fabric 350      SQYD 5.00 1,750.00            
713-01 temporary signs & barricades lump      LUMP 25,000.00 25,000.00            
716-01-A mulch (vegetative) 1.6    TON 2,000.00 3,200.00            
717-01 seeding 37      LB 20.00 740.00            
718-01 fertilizer 800      LB 1.00 800.00            
726-01 bedding material 67.9    CUYD 100.00 6,790.00            
727-01 mobilization lump      LUMP 110,000.00 110,000.00            
729-16-B object marker assembly (type 2) 4      EACH 100.00 400.00            
729-16-C object marker assembly (type 3) 8      EACH 100.00 800.00            
740-01 construction layout lump      LUMP 10,000.00 10,000.00            
804-01-B precast concrete piles (14") 960      LNFT 60.00 57,600.00            
804-12 loading permanent piles 1      EACH 1.00 1.00            
805-01-B class a concrete (box culvert headwalls) 37.84   CUYD 1,500.00 56,760.00            
805-10-A bridge superstructure & substructure,24' clear roadway,
cast-in-place only)
7      SPAN 35,000.00 245,000.00            
805-12-P reinforced concrete box culverts (7'x 7') 168.0    LNFT 950.00 159,600.00            
806-01 deformed reinforcing steel 2,662      LB 3.50 9,317.00            
                       
 CONTRACTOR TOTAL       1,100,040.50            