| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BEN ALLEN, INC. |
- 2 - C W & W CONTRACTORS, INC. |
- 3 - TERRAL CONSTRUCTION L.L.C.� |
- 4 - FENTON EXCAVATING & CONST. INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
8,000.00 |
8,000.00 |
10,000.00 |
10,000.00 |
28,000.00 |
28,000.00 |
30,000.00 |
30,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
10,000.00 |
10,000.00 |
6,000.00 |
6,000.00 |
8,000.00 |
8,000.00 |
14,350.00 |
14,350.00 |
| 202-02-A-01 |
removal of bridges (sta 15+00; 23.3' x 31' timber)
|
1   |
EACH |
3,500.00 |
3,500.00 |
5,000.00 |
5,000.00 |
7,000.00 |
7,000.00 |
4,565.00 |
4,565.00 |
| 203-05 |
excavation and embankment
|
lump |
LUMP |
50,000.00 |
50,000.00 |
66,000.00 |
66,000.00 |
47,000.00 |
47,000.00 |
65,692.00 |
65,692.00 |
| 204-03 |
temporary slope drains
|
84   |
LNFT |
0.00 |
0.00 |
10.00 |
840.00 |
1.00 |
84.00 |
12.00 |
1,008.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
EACH |
0.00 |
0.00 |
100.00 |
800.00 |
75.00 |
600.00 |
177.00 |
1,416.00 |
| 204-06 |
temporary silt fencing
|
2,200   |
LNFT |
4.00 |
8,800.00 |
1.00 |
2,200.00 |
2.00 |
4,400.00 |
2.95 |
6,490.00 |
| 302-01-A |
class ii base course (stone)
|
428.0 |
CUYD |
115.00 |
49,220.00 |
100.00 |
42,800.00 |
153.00 |
65,484.00 |
87.00 |
37,236.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
46   |
CUYD |
115.00 |
5,290.00 |
100.00 |
4,600.00 |
253.00 |
11,638.00 |
98.00 |
4,508.00 |
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
47.2 |
CUYD |
115.00 |
5,428.00 |
100.00 |
4,720.00 |
253.00 |
11,941.60 |
112.00 |
5,286.40 |
| 502-01 |
superpave asphaltic concrete
|
331.9 |
TON |
200.00 |
66,380.00 |
175.00 |
58,082.50 |
330.00 |
109,527.00 |
306.00 |
101,561.40 |
| 701-12-U |
corrugated metal pipe (extension)(84")
|
10   |
LNFT |
500.00 |
5,000.00 |
750.00 |
7,500.00 |
500.00 |
5,000.00 |
563.00 |
5,630.00 |
| 701-15 |
concrete collar
|
1   |
EACH |
800.00 |
800.00 |
4,000.00 |
4,000.00 |
2,000.00 |
2,000.00 |
1,062.00 |
1,062.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
66.00 |
6,600.00 |
70.00 |
7,000.00 |
60.00 |
6,000.00 |
71.00 |
7,100.00 |
| 704-09 |
guard rail anchor sections (turndown)
|
100.0 |
LNFT |
72.00 |
7,200.00 |
40.00 |
4,000.00 |
35.00 |
3,500.00 |
80.00 |
8,000.00 |
| 707-04 |
asphaltic curb
|
40.0 |
LNFT |
10.00 |
400.00 |
90.00 |
3,600.00 |
20.00 |
800.00 |
14.00 |
560.00 |
| 711-01-D |
riprap (55 lb, 18" thick )
|
350   |
SQYD |
83.00 |
29,050.00 |
90.00 |
31,500.00 |
114.00 |
39,900.00 |
95.00 |
33,250.00 |
| 711-03-E |
riprap (130 lb)
|
280.0 |
TON |
90.00 |
25,200.00 |
90.00 |
25,200.00 |
82.00 |
22,960.00 |
88.00 |
24,640.00 |
| 711-04 |
geotextile fabric
|
350   |
SQYD |
3.00 |
1,050.00 |
3.00 |
1,050.00 |
14.00 |
4,900.00 |
3.00 |
1,050.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
12,000.00 |
12,000.00 |
12,000.00 |
12,000.00 |
13,000.00 |
13,000.00 |
13,600.00 |
13,600.00 |
| 716-01-A |
mulch (vegetative)
|
1.6 |
TON |
500.00 |
800.00 |
3,000.00 |
4,800.00 |
650.00 |
1,040.00 |
708.00 |
1,132.80 |
| 717-01 |
seeding
|
37   |
LB |
25.00 |
925.00 |
50.00 |
1,850.00 |
12.00 |
444.00 |
12.00 |
444.00 |
| 718-01 |
fertilizer
|
800   |
LB |
0.50 |
400.00 |
3.00 |
2,400.00 |
1.00 |
800.00 |
0.60 |
480.00 |
| 726-01 |
bedding material
|
67.9 |
CUYD |
115.00 |
7,808.50 |
120.00 |
8,148.00 |
193.00 |
13,104.70 |
109.00 |
7,401.10 |
| 727-01 |
mobilization
|
lump |
LUMP |
50,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
84,550.00 |
84,550.00 |
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
75.00 |
300.00 |
100.00 |
400.00 |
75.00 |
300.00 |
77.00 |
308.00 |
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
85.00 |
680.00 |
120.00 |
960.00 |
110.00 |
880.00 |
94.00 |
752.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
8,000.00 |
8,000.00 |
10,000.00 |
10,000.00 |
8,000.00 |
8,000.00 |
18,000.00 |
18,000.00 |
| 804-01-B |
precast concrete piles (14")
|
960   |
LNFT |
62.00 |
59,520.00 |
90.00 |
86,400.00 |
68.00 |
65,280.00 |
98.00 |
94,080.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
0.00 |
0.00 |
1.00 |
1.00 |
1,000.00 |
1,000.00 |
5,014.00 |
5,014.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
37.84 |
CUYD |
1,150.00 |
43,516.00 |
1,300.00 |
49,192.00 |
1,200.00 |
45,408.00 |
830.00 |
31,407.20 |
| 805-10-A |
bridge superstructure & substructure,24' clear roadway,
cast-in-place only) |
7   |
SPAN |
27,000.00 |
189,000.00 |
23,000.00 |
161,000.00 |
30,000.00 |
210,000.00 |
29,500.00 |
206,500.00 |
| 805-12-P |
reinforced concrete box culverts (7'x 7')
|
168.0 |
LNFT |
775.00 |
130,200.00 |
750.00 |
126,000.00 |
600.00 |
100,800.00 |
735.00 |
123,480.00 |
| 806-01 |
deformed reinforcing steel
|
2,662   |
LB |
2.00 |
5,324.00 |
3.00 |
7,986.00 |
1.00 |
2,662.00 |
2.50 |
6,655.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
790,391.50 |
|
806,029.50 |
|
891,453.30 |
|
947,208.90 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - GUINN BROTHERS, LLC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
42,000.00 |
42,000.00 |
|
|
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
25,000.00 |
25,000.00 |
|
|
|
|
|
|
| 202-02-A-01 |
removal of bridges (sta 15+00; 23.3' x 31' timber)
|
1   |
EACH |
6,000.00 |
6,000.00 |
|
|
|
|
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
80,000.00 |
80,000.00 |
|
|
|
|
|
|
| 204-03 |
temporary slope drains
|
84   |
LNFT |
10.00 |
840.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
EACH |
100.00 |
800.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
2,200   |
LNFT |
5.00 |
11,000.00 |
|
|
|
|
|
|
| 302-01-A |
class ii base course (stone)
|
428.0 |
CUYD |
100.00 |
42,800.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
46   |
CUYD |
100.00 |
4,600.00 |
|
|
|
|
|
|
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
47.2 |
CUYD |
100.00 |
4,720.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
331.9 |
TON |
275.00 |
91,272.50 |
|
|
|
|
|
|
| 701-12-U |
corrugated metal pipe (extension)(84")
|
10   |
LNFT |
1,275.00 |
12,750.00 |
|
|
|
|
|
|
| 701-15 |
concrete collar
|
1   |
EACH |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
90.00 |
9,000.00 |
|
|
|
|
|
|
| 704-09 |
guard rail anchor sections (turndown)
|
100.0 |
LNFT |
65.00 |
6,500.00 |
|
|
|
|
|
|
| 707-04 |
asphaltic curb
|
40.0 |
LNFT |
50.00 |
2,000.00 |
|
|
|
|
|
|
| 711-01-D |
riprap (55 lb, 18" thick )
|
350   |
SQYD |
100.00 |
35,000.00 |
|
|
|
|
|
|
| 711-03-E |
riprap (130 lb)
|
280.0 |
TON |
100.00 |
28,000.00 |
|
|
|
|
|
|
| 711-04 |
geotextile fabric
|
350   |
SQYD |
5.00 |
1,750.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
25,000.00 |
25,000.00 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
1.6 |
TON |
2,000.00 |
3,200.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
37   |
LB |
20.00 |
740.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
800   |
LB |
1.00 |
800.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
67.9 |
CUYD |
100.00 |
6,790.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
110,000.00 |
110,000.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
100.00 |
400.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
100.00 |
800.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 804-01-B |
precast concrete piles (14")
|
960   |
LNFT |
60.00 |
57,600.00 |
|
|
|
|
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
37.84 |
CUYD |
1,500.00 |
56,760.00 |
|
|
|
|
|
|
| 805-10-A |
bridge superstructure & substructure,24' clear roadway,
cast-in-place only) |
7   |
SPAN |
35,000.00 |
245,000.00 |
|
|
|
|
|
|
| 805-12-P |
reinforced concrete box culverts (7'x 7')
|
168.0 |
LNFT |
950.00 |
159,600.00 |
|
|
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
2,662   |
LB |
3.50 |
9,317.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,100,040.50 |
|
|
|
|
|
|
|