February 06, 2014 Error processing SSI file

Letting of 10/29/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 451-30-0026
Parish: CADDO
Routes: I-220
Description: MCCAIN CREEK BRIDGE REPLACEMENT
Type Const: grading, drain struct, subgrade layer, class ii bc, in-place cement stabilized bc,
reinforced concrete box culvert, superpave acp, and related work.
Estimated Construction Cost: $18,432,724.00
Maximum Number of Days Allowed for Construction: 450
Calculated Daily User Cost: $10,000.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Total Bid
1 39670 EUTAW CONSTRUCTION CO. INC. $12,313,551.30 400 $16,313,551.30
2 34567 JAMES CONSTRUCTION GROUP LLC $13,654,674.50 450 $18,154,674.50
3 12135 BLOUNT BROS. CONSTRUCTION, INC. $14,520,434.35 350 $18,020,434.35
4 28218 F. J. BURNELL, INC. $14,623,119.90 450 $19,123,119.90
5 38936 SOUTHERN INDUSTRIAL CONTRACTORS LLC $14,691,574.26 450 $19,191,574.26
6 36374 BEST-YET BUILDERS, LLC $16,529,098.61 450 $21,029,098.61
7 12312 GILCHRIST CONSTRUCTION CO. LLC $16,945,850.50 450 $21,445,850.50
 
Item Number Item Description Quantity Unit of Measure - 1 -
EUTAW CONSTRUCTION CO. INC.
- 2 -
JAMES CONSTRUCTION GROUP LLC
- 3 -
BLOUNT BROS. CONSTRUCTION, INC.
- 4 -
F. J. BURNELL, INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 35,000.00 35,000.00 20,000.00 20,000.00 25,000.00 25,000.00 400,000.00 400,000.00
202-02-A-01 removal of bridges (sta. 126+01.13 rt; 40' x 352'
conc. girder span bridge)
1      EACH 200,000.00 200,000.00 150,000.00 150,000.00 150,000.00 150,000.00 500,000.00 500,000.00
202-02-A-02 removal of bridges (sta. 126+90.97 lt; 40' x 320'
conc. girder span bridge)
1      EACH 200,000.00 200,000.00 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00
202-02-C removal of portland cement concrete pavement 747      SQYD 12.50 9,337.50 12.00 8,964.00 5.75 4,295.25 10.00 7,470.00
202-02-D removal of concrete walks & drives 228      SQYD 12.50 2,850.00 8.00 1,824.00 12.00 2,736.00 10.00 2,280.00
202-02-G removal of surfacing and stabilized base 333.2    SQYD 6.50 2,165.80 10.00 3,332.00 4.50 1,499.40 10.00 3,332.00
202-02-H removal of guard rail 960      LNFT 14.00 13,440.00 3.00 2,880.00 3.00 2,880.00 5.00 4,800.00
203-01 general excavation 5,353      CUYD 14.00 74,942.00 8.00 42,824.00 5.00 26,765.00 11.00 58,883.00
203-03 embankment 76,750      CUYD 22.00 1,688,500.00 15.00 1,151,250.00 12.00 921,000.00 13.50 1,036,125.00
204-02 temporary hay or straw bales 50      EACH 14.00 700.00 20.00 1,000.00 15.00 750.00 25.00 1,250.00
204-06 temporary silt fencing 2,550      LNFT 2.00 5,100.00 3.00 7,650.00 3.00 7,650.00 3.00 7,650.00
302-02-E class ii base course (10" thick) 4,676.6    SQYD 25.00 116,915.00 25.00 116,915.00 23.00 107,561.80 20.00 93,532.00
303-01-C in-place cement stabilized base course (10" thick) 6,006      SQYD 10.25 61,561.50 10.25 61,561.50 15.00 90,090.00 15.00 90,090.00
305-01-D subgrade layer (12" thick) 4,676      SQYD 12.50 58,450.00 12.50 58,450.00 15.00 70,140.00 10.00 46,760.00
502-01 superpave asphaltic concrete 4,950.4    TON 115.00 569,296.00 115.00 569,296.00 95.00 470,288.00 135.00 668,304.00
509-01 cold planing asphaltic pavement 11,123      SQYD 5.25 58,395.75 6.00 66,738.00 2.00 22,246.00 6.00 66,738.00
701-03-M storm drain pipe (36" rcp/pcp) 204      LNFT 110.00 22,440.00 150.00 30,600.00 130.00 26,520.00 100.00 20,400.00
701-03-O/P-01 storm drain pipe (48" pcp or 54" cmp)(outfall) 120      LNFT 130.00 15,600.00 200.00 24,000.00 175.00 21,000.00 165.00 19,800.00
701-03-S storm drain pipe (72" rcp/pcp) 372      LNFT 367.00 136,524.00 350.00 130,200.00 450.00 167,400.00 400.00 148,800.00
704-01-C guard rail (double thrie beam)(3'-1 1/2" post spacing) 31.3    LNFT 60.00 1,878.00 65.00 2,034.50 64.50 2,018.85 75.00 2,347.50
704-03 blocked out guard rail 150.0    LNFT 23.00 3,450.00 25.00 3,750.00 25.00 3,750.00 29.00 4,350.00
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
6.3    LNFT 120.00 756.00 150.00 945.00 150.00 945.00 200.00 1,260.00
704-11-B guard rail end treatment (tangent) 1      EACH 3,000.00 3,000.00 2,800.00 2,800.00 2,800.00 2,800.00 3,200.00 3,200.00
705-06-B chain link fence (5-foot height) 627      LNFT 25.00 15,675.00 15.00 9,405.00 14.00 8,778.00 16.00 10,032.00
711-02-E riprap (130 lb) 701      CUYD 130.00 91,130.00 100.00 70,100.00 80.00 56,080.00 95.00 66,595.00
711-04 geotextile fabric 830      SQYD 4.00 3,320.00 3.00 2,490.00 3.00 2,490.00 2.50 2,075.00
712-02 sacked concrete revetment 64      SQYD 100.00 6,400.00 200.00 12,800.00 100.00 6,400.00 100.00 6,400.00
713-01 temporary signs & barricades lump      LUMP 40,000.00 40,000.00 40,000.00 40,000.00 50,000.00 50,000.00 225,000.00 225,000.00
713-04-A-01 temporary pvmt. markings (solid line)(4" w)(type i
removable)
5.292  MILE 11,100.00 58,741.20 12,000.00 63,504.00 9,750.00 51,597.00 12,700.00 67,208.40
713-06-A temporary reflectorized raised pavement markers (tabs) 1,450      EACH 2.00 2,900.00 1.00 1,450.00 1.25 1,812.50 1.20 1,740.00
713-08 temporary precast concrete barrier (department
furnished)
307      EACH 275.00 84,425.00 200.00 61,400.00 225.00 69,075.00 150.00 46,050.00
713-10 temporary precast concrete barrier movement 195      EACH 50.00 9,750.00 75.00 14,625.00 45.00 8,775.00 75.00 14,625.00
716-01-A mulch (vegetative) 13.9    TON 650.00 9,035.00 650.00 9,035.00 475.00 6,602.50 500.00 6,950.00
717-01 seeding 556      LB 9.00 5,004.00 9.00 5,004.00 8.50 4,726.00 12.00 6,672.00
718-01 fertilizer 9,272      LB 0.48 4,450.56 0.50 4,636.00 0.50 4,636.00 1.00 9,272.00
720-01-A erosion control system, slope protection (type a) 756      SQYD 1.40 1,058.40 1.40 1,058.40 2.00 1,512.00 2.00 1,512.00
720-01-B erosion control system, slope protection (type b) 2,300      SQYD 1.50 3,450.00 1.50 3,450.00 4.00 9,200.00 2.00 4,600.00
722-02 project site laboratory (equipped) 1      EACH 30,000.00 30,000.00 10,000.00 10,000.00 50,000.00 50,000.00 150,000.00 150,000.00
726-01 bedding material 6,825.0    CUYD 95.00 648,375.00 80.00 546,000.00 60.00 409,500.00 75.00 511,875.00
727-01 mobilization lump      LUMP 1,075,000.00 1,075,000.00 1,300,000.00 1,300,000.00 1,100,000.00 1,100,000.00 1,400,000.00 1,400,000.00
731-02 reflectorized raised pavement markers 200      EACH 5.50 1,100.00 6.00 1,200.00 6.00 1,200.00 5.80 1,160.00
732-02-A plastic pavement striping (solid line) (4" width) 3.008  MILE 2,650.00 7,971.20 2,600.00 7,820.80 2,350.00 7,068.80 3,000.00 9,024.00
732-03-A-01 plastic pvmt striping (broken line)(4"width)preformed
marking tape - type d)
1.504  MILE 2,640.00 3,970.56 2,600.00 3,910.40 2,640.00 3,970.56 3,000.00 4,512.00
732-05 removal of existing markings 4.057  MILE 3,590.00 14,564.63 3,500.00 14,199.50 3,590.00 14,564.63 4,000.00 16,228.00
740-01 construction layout lump      LUMP 75,000.00 75,000.00 40,000.00 40,000.00 75,000.00 75,000.00 200,000.00 200,000.00
803-05 temporary sheeting lump      LUMP 495,000.00 495,000.00 1,550,000.00 1,550,000.00 2,000,000.00 2,000,000.00 135,000.00 135,000.00
805-01-B class a concrete (box culvert headwalls) 428.53   CUYD 600.00 257,118.00 1,200.00 514,236.00 900.00 385,677.00 600.00 257,118.00
805-06 class r concrete 760.30   CUYD 282.00 214,404.60 300.00 228,090.00 250.00 190,075.00 300.00 228,090.00
805-12-Y reinforced concrete box culverts (15' x 15') 1,660.7    LNFT 2,250.00 3,736,575.00 2,500.00 4,151,750.00 3,900.00 6,476,730.00 3,000.00 4,982,100.00
806-01 deformed reinforcing steel 66,652      LB 0.80 53,321.60 1.20 79,982.40 1.50 99,978.00 1.00 66,652.00
S-001 dynamic message sign unit 5      EACH 13,000.00 65,000.00 15,000.00 75,000.00 15,000.00 75,000.00 16,500.00 82,500.00
S-002 temporary guard rail 150      LNFT 40.00 6,000.00 40.00 6,000.00 39.00 5,850.00 45.00 6,750.00
S-003 rumble strips (ground-in) 3.004  MILE 2,500.00 7,510.00 3,500.00 10,514.00 2,264.00 6,801.06 2,000.00 6,008.00
S-004 glare paddles 1,000      LNFT 7.00 7,000.00 10.00 10,000.00 8.00 8,000.00 10.00 10,000.00
S-101 cofferdam / dewatering system lump      LUMP 2,000,000.00 2,000,000.00 2,200,000.00 2,200,000.00 1,052,000.00 1,052,000.00 2,750,000.00 2,750,000.00
                       
 ITEM TOTAL (CONSTRUCTION BID)       12,313,551.30   13,654,674.50   14,520,434.35   14,623,119.90
 NUMBER OF DAYS BID AT $10,000 PER DAY.       4,000,000.00   4,500,000.00   3,500,000.00   4,500,000.00
 TOTAL BID       16,313,551.30   18,154,674.50   18,020,434.35   19,123,119.90
 
Item Number Item Description Quantity Unit of Measure - 5 -
SOUTHERN INDUSTRIAL CONTRACTORS LLC
- 6 -
BEST-YET BUILDERS, LLC
- 7 -
GILCHRIST CONSTRUCTION CO. LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 163,855.00 163,855.00 100,000.00 100,000.00 35,000.00 35,000.00    
202-02-A-01 removal of bridges (sta. 126+01.13 rt; 40' x 352'
conc. girder span bridge)
1      EACH 502,000.00 502,000.00 1,056,000.00 1,056,000.00 190,000.00 190,000.00    
202-02-A-02 removal of bridges (sta. 126+90.97 lt; 40' x 320'
conc. girder span bridge)
1      EACH 460,000.00 460,000.00 960,000.00 960,000.00 190,000.00 190,000.00    
202-02-C removal of portland cement concrete pavement 747      SQYD 25.75 19,235.25 10.00 7,470.00 18.50 13,819.50    
202-02-D removal of concrete walks & drives 228      SQYD 25.60 5,836.80 10.00 2,280.00 14.00 3,192.00    
202-02-G removal of surfacing and stabilized base 333.2    SQYD 25.60 8,529.92 6.00 1,999.20 42.00 13,994.40    
202-02-H removal of guard rail 960      LNFT 3.60 3,456.00 3.50 3,360.00 14.00 13,440.00    
203-01 general excavation 5,353      CUYD 24.00 128,472.00 8.00 42,824.00 13.00 69,589.00    
203-03 embankment 76,750      CUYD 20.40 1,565,700.00 14.00 1,074,500.00 22.00 1,688,500.00    
204-02 temporary hay or straw bales 50      EACH 24.00 1,200.00 20.00 1,000.00 20.00 1,000.00    
204-06 temporary silt fencing 2,550      LNFT 2.40 6,120.00 3.00 7,650.00 4.00 10,200.00    
302-02-E class ii base course (10" thick) 4,676.6    SQYD 30.00 140,298.00 16.70 78,099.22 30.00 140,298.00    
303-01-C in-place cement stabilized base course (10" thick) 6,006      SQYD 12.30 73,873.80 10.00 60,060.00 20.00 120,120.00    
305-01-D subgrade layer (12" thick) 4,676      SQYD 15.00 70,140.00 10.00 46,760.00 25.00 116,900.00    
502-01 superpave asphaltic concrete 4,950.4    TON 180.00 891,072.00 130.00 643,552.00 135.00 668,304.00    
509-01 cold planing asphaltic pavement 11,123      SQYD 6.30 70,074.90 3.00 33,369.00 2.80 31,144.40    
701-03-M storm drain pipe (36" rcp/pcp) 204      LNFT 160.10 32,660.40 150.00 30,600.00 130.00 26,520.00    
701-03-O/P-01 storm drain pipe (48" pcp or 54" cmp)(outfall) 120      LNFT 360.85 43,302.00 300.00 36,000.00 200.00 24,000.00    
701-03-S storm drain pipe (72" rcp/pcp) 372      LNFT 508.70 189,236.40 550.00 204,600.00 400.00 148,800.00    
704-01-C guard rail (double thrie beam)(3'-1 1/2" post spacing) 31.3    LNFT 72.02 2,254.23 72.00 2,253.60 70.00 2,191.00    
704-03 blocked out guard rail 150.0    LNFT 27.60 4,140.00 28.00 4,200.00 25.00 3,750.00    
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
6.3    LNFT 144.15 908.15 170.00 1,071.00 140.00 882.00    
704-11-B guard rail end treatment (tangent) 1      EACH 3,600.00 3,600.00 3,100.00 3,100.00 3,500.00 3,500.00    
705-06-B chain link fence (5-foot height) 627      LNFT 24.00 15,048.00 16.00 10,032.00 30.00 18,810.00    
711-02-E riprap (130 lb) 701      CUYD 119.25 83,594.25 80.00 56,080.00 90.00 63,090.00    
711-04 geotextile fabric 830      SQYD 1.90 1,577.00 3.00 2,490.00 3.00 2,490.00    
712-02 sacked concrete revetment 64      SQYD 120.00 7,680.00 100.00 6,400.00 200.00 12,800.00    
713-01 temporary signs & barricades lump      LUMP 228,857.00 228,857.00 400,000.00 400,000.00 350,000.00 350,000.00    
713-04-A-01 temporary pvmt. markings (solid line)(4" w)(type i
removable)
5.292  MILE 13,320.15 70,490.23 12,200.00 64,562.40 12,500.00 66,150.00    
713-06-A temporary reflectorized raised pavement markers (tabs) 1,450      EACH 1.20 1,740.00 2.00 2,900.00 1.15 1,667.50    
713-08 temporary precast concrete barrier (department
furnished)
307      EACH 793.10 243,481.70 300.00 92,100.00 200.00 61,400.00    
713-10 temporary precast concrete barrier movement 195      EACH 240.00 46,800.00 200.00 39,000.00 115.00 22,425.00    
716-01-A mulch (vegetative) 13.9    TON 720.00 10,008.00 440.00 6,116.00 600.00 8,340.00    
717-01 seeding 556      LB 12.00 6,672.00 7.15 3,975.40 8.30 4,614.80    
718-01 fertilizer 9,272      LB 0.60 5,563.20 0.53 4,914.16 0.80 7,417.60    
720-01-A erosion control system, slope protection (type a) 756      SQYD 3.80 2,872.80 1.65 1,247.40 2.50 1,890.00    
720-01-B erosion control system, slope protection (type b) 2,300      SQYD 3.80 8,740.00 1.92 4,416.00 2.50 5,750.00    
722-02 project site laboratory (equipped) 1      EACH 24,000.00 24,000.00 100,000.00 100,000.00 80,000.00 80,000.00    
726-01 bedding material 6,825.0    CUYD 90.15 615,273.75 75.00 511,875.00 105.00 716,625.00    
727-01 mobilization lump      LUMP 756,300.00 756,300.00 1,500,000.00 1,500,000.00 1,600,000.00 1,600,000.00    
731-02 reflectorized raised pavement markers 200      EACH 6.15 1,230.00 5.61 1,122.00 6.00 1,200.00    
732-02-A plastic pavement striping (solid line) (4" width) 3.008  MILE 3,180.00 9,565.44 2,915.00 8,768.32 3,000.00 9,024.00    
732-03-A-01 plastic pvmt striping (broken line)(4"width)preformed
marking tape - type d)
1.504  MILE 3,169.00 4,766.18 2,904.00 4,367.62 3,000.00 4,512.00    
732-05 removal of existing markings 4.057  MILE 4,313.50 17,499.87 3,949.00 16,021.09 4,200.00 17,039.40    
740-01 construction layout lump      LUMP 116,100.00 116,100.00 200,000.00 200,000.00 250,000.00 250,000.00    
803-05 temporary sheeting lump      LUMP 252,000.00 252,000.00 1,000,000.00 1,000,000.00 15,000.00 15,000.00    
805-01-B class a concrete (box culvert headwalls) 428.53   CUYD 840.10 360,008.05 1,000.00 428,530.00 1,600.00 685,648.00    
805-06 class r concrete 760.30   CUYD 269.90 205,204.97 400.00 304,120.00 275.00 209,082.50    
805-12-Y reinforced concrete box culverts (15' x 15') 1,660.7    LNFT 2,735.00 4,542,014.50 4,000.00 6,642,800.00 3,200.00 5,314,240.00    
806-01 deformed reinforcing steel 66,652      LB 1.20 79,982.40 1.00 66,652.00 1.20 79,982.40    
S-001 dynamic message sign unit 5      EACH 25,476.00 127,380.00 25,000.00 125,000.00 20,000.00 100,000.00    
S-002 temporary guard rail 150      LNFT 48.00 7,200.00 43.00 6,450.00 50.00 7,500.00    
S-003 rumble strips (ground-in) 3.004  MILE 2,716.40 8,160.07 2,800.00 8,411.20 2,000.00 6,008.00    
S-004 glare paddles 1,000      LNFT 21.80 21,800.00 10.00 10,000.00 8.00 8,000.00    
S-101 cofferdam / dewatering system lump      LUMP 2,424,000.00 2,424,000.00 500,000.00 500,000.00 3,700,000.00 3,700,000.00    
                       
 ITEM TOTAL (CONSTRUCTION BID)       14,691,574.26   16,529,098.61   16,945,850.50    
 NUMBER OF DAYS BID AT $10,000 PER DAY.       4,500,000.00   4,500,000.00   4,500,000.00    
 TOTAL BID       19,191,574.26   21,029,098.61   21,445,850.50    