Letting of 10/29/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 424-04-0051
Parish: IBERIA
Routes: US 90
Description: US 90 FRONTAGE ROADS (LA 675 - LA 88)
Type Const: grading, drainage structures, subgrade layer, class ii base course, superpave asphaltic
concrete pavement, concrete slab span bridge and related work.
Estimated Construction Cost: $11,246,648.25
 
RankLicenseBidderConstruction Bid
1 04089 H & S CONSTRUCTION CO., INC. $10,695,104.99
2 12312 GILCHRIST CONSTRUCTION CO. LLC $11,810,654.45
3 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $12,717,397.05
 
Item Number Item Description Quantity Unit of Measure - 1 -
H & S CONSTRUCTION CO., INC.
- 2 -
GILCHRIST CONSTRUCTION CO. LLC
- 3 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 85,000.00 85,000.00 25,000.00 25,000.00 75,000.00 75,000.00    
202-02-C removal of portland cement concrete pavement 6,286      SQYD 7.65 48,087.90 5.80 36,458.80 12.00 75,432.00    
202-02-G removal of surfacing & stabilized base 2,441.7    SQYD 4.20 10,255.14 8.00 19,533.60 30.00 73,251.00    
202-02-H-01 removal of guard rail (us 90 @ segura branch) 943      LNFT 4.75 4,479.25 11.00 10,373.00 13.55 12,777.65    
203-01 general excavation 41,767      CUYD 4.22 176,256.74 4.20 175,421.40 7.00 292,369.00    
203-02 drainage excavation 1,168      CUYD 9.00 10,512.00 12.00 14,016.00 14.00 16,352.00    
203-03 embankment 29,039      CUYD 6.00 174,234.00 17.00 493,663.00 8.50 246,831.50    
204-05-A temporary sediment check dams (hay) 14      EACH 75.90 1,062.60 230.00 3,220.00 225.00 3,150.00    
204-06 temporary silt fencing 32,073      LNFT 1.38 44,260.74 1.75 56,127.75 7.00 224,511.00    
302-02-F-01 class ii base course (12" thick)(stone or recycled
pccp)
115,161.4    SQYD 24.85 2,861,760.79 25.00 2,879,035.00 29.75 3,426,051.65    
305-01-D subgrade layer (12" thick) 118,733      SQYD 5.19 616,224.27 6.00 712,398.00 6.00 712,398.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
503      CUYD 54.32 27,322.96 78.00 39,234.00 100.00 50,300.00    
402-01 traffic maintenance aggregate (vehicular measurement) 1,148.4    CUYD 53.51 61,450.88 65.00 74,646.00 105.00 120,582.00    
502-01 superpave asphaltic concrete 20,712.3    TON 98.00 2,029,805.40 100.00 2,071,230.00 110.00 2,278,353.00    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,308.3    TON 130.00 170,079.00 135.00 176,620.50 150.00 196,245.00    
701-05-G side drain pipe (18") 2,933      LNFT 44.71 131,134.43 58.00 170,114.00 60.00 175,980.00    
701-05-I side drain pipe (24") 3,942      LNFT 53.43 210,621.06 78.00 307,476.00 65.00 256,230.00    
701-05-I-01 side drain pipe (24") (erosion) 2,108      LNFT 56.61 119,333.88 70.00 147,560.00 65.00 137,020.00    
701-05-M-01 side drain pipe (36")(erosion) 109      LNFT 86.27 9,403.43 90.00 9,810.00 85.00 9,265.00    
701-06-B side drain pipe arch (18" equiv.)(22" x 13") 513      LNFT 52.71 27,040.23 57.00 29,241.00 60.00 30,780.00    
701-10-M reinforced concrete pipe (extension)(36") 13      LNFT 125.73 1,634.49 275.00 3,575.00 205.00 2,665.00    
702-02-B manholes (r-cb-11) 1      EACH 5,500.00 5,500.00 4,000.00 4,000.00 5,000.00 5,000.00    
702-02-C manholes (r-cb-11 mod) 1      EACH 5,500.00 5,500.00 5,000.00 5,000.00 5,000.00 5,000.00    
702-08-A side drain safety end (type 1) 113      EACH 1,300.00 146,900.00 1,400.00 158,200.00 2,500.00 282,500.00    
704-03 blocked out guard rail 3,277.5    LNFT 21.45 70,302.38 28.00 91,770.00 20.00 65,550.00    
704-08-B guard rail transitions (double thrie beam) 300.0    LNFT 61.60 18,480.00 75.00 22,500.00 60.00 18,000.00    
704-11-A guard rail end treatment (flared) 4      EACH 2,310.00 9,240.00 2,500.00 10,000.00 2,200.00 8,800.00    
704-11-B guard rail end treatment (tangent) 10      EACH 2,695.00 26,950.00 600.00 6,000.00 2,600.00 26,000.00    
706-02-C concrete drive (6" thick) 946.7    SQYD 55.00 52,068.50 65.00 61,535.50 52.00 49,228.40    
712-04 flexible revetment 1,092      SQYD 71.50 78,078.00 50.00 54,600.00 80.00 87,360.00    
713-01 temporary signs & barricades lump      LUMP 60,000.00 60,000.00 85,000.00 85,000.00 35,000.00 35,000.00    
722-02 project site laboratory (equipped) 1      EACH 9,246.00 9,246.00 45,000.00 45,000.00 15,000.00 15,000.00    
726-01 bedding material 2,297.7    CUYD 95.13 218,580.20 88.00 202,197.60 80.00 183,816.00    
727-01 mobilization lump      LUMP 500,000.00 500,000.00 1,100,000.00 1,100,000.00 1,000,000.00 1,000,000.00    
729-16-B object marker assembly (type 2) 16      EACH 71.50 1,144.00 115.00 1,840.00 70.00 1,120.00    
729-16-C object marker assembly (type 3) 8      EACH 110.00 880.00 230.00 1,840.00 105.00 840.00    
729-19-A dead end road installations(type a) 1      EACH 1,375.00 1,375.00 2,000.00 2,000.00 1,300.00 1,300.00    
731-02 reflectorized raised pavement markers 820      EACH 6.33 5,190.60 7.00 5,740.00 5.00 4,100.00    
732-01-E plastic pavement striping (24" width) 88      LNFT 4.95 435.60 5.75 506.00 2.00 176.00    
732-02-A plastic pavement striping (solid line) (4" width) 12.429  MILE 2,530.00 31,445.37 3,200.00 39,772.80 2,400.00 29,829.60    
732-03-A plastic pavement striping (broken line)(4" width) 6.214  MILE 935.00 5,810.09 1,200.00 7,456.80 650.00 4,039.10    
735-01 mailboxes 22      EACH 1.10 24.20 20.00 440.00 1.00 22.00    
735-02 mailbox supports (single) 19      EACH 104.50 1,985.50 150.00 2,850.00 150.00 2,850.00    
735-03 mailbox supports (double) 2      EACH 154.00 308.00 200.00 400.00 180.00 360.00    
735-04 mailbox supports (multiple) 1      EACH 220.00 220.00 230.00 230.00 350.00 350.00    
739-01 hydro-seeding 23.05   ACRE 1,155.00 26,622.75 1,200.00 27,660.00 1,100.00 25,355.00    
740-01 construction layout lump      LUMP 285,000.00 285,000.00 90,000.00 90,000.00 175,000.00 175,000.00    
804-01-B precast concrete piles (14") 3,384      LNFT 55.00 186,120.00 48.00 162,432.00 57.00 192,888.00    
804-12 loading permanent piles 2      EACH 14,300.00 28,600.00 10,000.00 20,000.00 1.00 2.00    
805-01-B class a concrete (box culvert headwalls) 166.00   CUYD 1,179.00 195,714.00 1,550.00 257,300.00 1,200.00 199,200.00    
805-01-F class a concrete (bents) 77.52   CUYD 962.50 74,613.00 1,250.00 96,900.00 1,200.00 93,024.00    
805-03 class aa concrete 307.60   CUYD 1,100.00 338,360.00 700.00 215,320.00 850.00 261,460.00    
805-12-F reinforced concrete box culverts (5'x 4') 409.0    LNFT 473.00 193,457.00 600.00 245,400.00 500.00 204,500.00    
805-12-J reinforced concrete box culverts (6'x 5') 315.0    LNFT 555.50 174,982.50 700.00 220,500.00 600.00 189,000.00    
805-12-P reinforced concrete box culverts (7'x 7') 302.0    LNFT 775.50 234,201.00 800.00 241,600.00 800.00 241,600.00    
805-12-X reinforced concrete box culverts (10'x 10') 412.0    LNFT 1,182.00 486,984.00 1,200.00 494,400.00 1,100.00 453,200.00    
806-01 deformed reinforcing steel 78,607      LB 1.25 98,258.75 1.10 86,467.70 1.25 98,258.75    
810-01 concrete railing (barrier) 400.00   LNFT 66.00 26,400.00 75.00 30,000.00 80.00 32,000.00    
813-01 concrete approach slabs 622.24   SQYD 203.50 126,625.84 275.00 171,116.00 210.00 130,670.40    
S-001 cleaning existing ditches 27,709      LNFT 5.28 146,303.52 3.00 83,127.00 6.00 166,254.00    
S-002 sawcutting of existing pcc drives 2,400      INFT 1.35 3,240.00 2.00 4,800.00 5.50 13,200.00    
                       
 CONTRACTOR TOTAL       10,695,104.99   11,810,654.45   12,717,397.05    