DBE GOAL FED
Lead Project: 380-02-0007
Parish: ST LANDRY
Routes: LA 363
Description: DRAINAGE CANAL BRIDGE
Type Const: grading, drainage structures, class ii base course, lime treatment, superpave asphaltic
concrete overlay, concrete slab span bridge and related work.
Estimated Construction Cost: $1,294,244.90
 
RankLicenseBidderConstruction Bid
1 09090 GUINN BROTHERS, LLC. $1,428,495.75
2 09476 KEY CONSTRUCTORS, INC. $1,520,765.20
3 12312 GILCHRIST CONSTRUCTION CO. LLC $1,573,279.34
4 00060 F. MILLER CONSTRUCTION LLC $1,899,468.90
5 01012 CECIL D. GASSIOTT LLC $2,022,430.50
 
Item Number Item Description Quantity Unit of Measure - 1 -
GUINN BROTHERS, LLC.
- 2 -
KEY CONSTRUCTORS, INC.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC
- 4 -
F. MILLER CONSTRUCTION LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 15,000.00 15,000.00 32,500.00 32,500.00 55,000.00 55,000.00 26,000.00 26,000.00
202-01 removal of structures & obstructions lump      LUMP 15,000.00 15,000.00 5,000.00 5,000.00 30,000.00 30,000.00 8,500.00 8,500.00
202-02-A-01 removal of bridges(sta. 116+08.92; 97' x 23' timber
bridge)
1      EACH 30,000.00 30,000.00 15,000.00 15,000.00 55,000.00 55,000.00 110,000.00 110,000.00
202-02-G removal of surfacing & stabilized base 2,164.7    SQYD 5.00 10,823.50 10.00 21,647.00 6.20 13,421.14 8.00 17,317.60
202-02-H removal of guard rail 520      LNFT 4.00 2,080.00 10.00 5,200.00 17.00 8,840.00 6.20 3,224.00
203-02 drainage excavation 2,226      CUYD 8.00 17,808.00 12.00 26,712.00 8.50 18,921.00 21.00 46,746.00
203-05 excavation & embankment lump      LUMP 35,000.00 35,000.00 70,000.00 70,000.00 75,000.00 75,000.00 95,000.00 95,000.00
204-05-A temporary sediment check dams (hay) 12      EACH 100.00 1,200.00 100.00 1,200.00 275.00 3,300.00 135.00 1,620.00
204-06 temporary silt fencing 420      LNFT 5.00 2,100.00 5.00 2,100.00 4.00 1,680.00 2.50 1,050.00
302-02-D class ii base course (8 1/2" thick) 1,036.4    SQYD 45.00 46,638.00 36.00 37,310.40 30.00 31,092.00 22.00 22,800.80
304-01 lime 19.58   TON 250.00 4,895.00 250.00 4,895.00 250.00 4,895.00 250.00 4,895.00
304-04-D lime treatment (type d) (12" thick) 1,036      SQYD 10.00 10,360.00 10.00 10,360.00 9.00 9,324.00 9.25 9,583.00
401-02 aggregate surface course (adjusted vehicular
measurement)
30      CUYD 100.00 3,000.00 100.00 3,000.00 300.00 9,000.00 250.00 7,500.00
502-01 superpave asphaltic concrete 376.2    TON 225.00 84,645.00 250.00 94,050.00 175.00 65,835.00 180.00 67,716.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
143.1    TON 400.00 57,240.00 300.00 42,930.00 215.00 30,766.50 360.00 51,516.00
701-01-M cross drain pipe (36" rcp/pcp) 82      LNFT 200.00 16,400.00 125.00 10,250.00 200.00 16,400.00 130.00 10,660.00
701-05-G side drain pipe (18")(erosion or bridge drain) 160      LNFT 60.00 9,600.00 65.00 10,400.00 115.00 18,400.00 91.00 14,560.00
701-05-M side drain pipe (36") 44      LNFT 120.00 5,280.00 130.00 5,720.00 175.00 7,700.00 76.00 3,344.00
701-05-M-01 side drain pipe (36")(erosion or bridge drain) 160      LNFT 120.00 19,200.00 110.00 17,600.00 180.00 28,800.00 76.00 12,160.00
704-03 blocked out guard rail 237.5    LNFT 25.00 5,937.50 21.50 5,106.25 25.00 5,937.50 25.00 5,937.50
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 65.00 6,500.00 60.00 6,000.00 70.00 7,000.00 75.00 7,500.00
704-11-A guard rail end treatment (flared) 4      EACH 2,500.00 10,000.00 2,500.00 10,000.00 2,700.00 10,800.00 2,600.00 10,400.00
705-01 barbed wire fence 349      LNFT 6.00 2,094.00 7.00 2,443.00 8.00 2,792.00 8.00 2,792.00
705-02 combination mesh & barbed wire fence 377      LNFT 9.00 3,393.00 8.00 3,016.00 9.00 3,393.00 10.00 3,770.00
708-01 right-of-way monument 15      EACH 150.00 2,250.00 300.00 4,500.00 350.00 5,250.00 500.00 7,500.00
708-02 right-of-way monument witness post 15      EACH 150.00 2,250.00 300.00 4,500.00 350.00 5,250.00 500.00 7,500.00
711-02-D riprap (55 lb) 495      CUYD 80.00 39,600.00 145.00 71,775.00 120.00 59,400.00 160.00 79,200.00
711-04 geotextile fabric 865      SQYD 5.00 4,325.00 3.00 2,595.00 3.50 3,027.50 3.10 2,681.50
713-01 temporary signs & barricades lump      LUMP 20,000.00 20,000.00 25,000.00 25,000.00 40,000.00 40,000.00 40,000.00 40,000.00
717-01 seeding 90      LB 18.00 1,620.00 12.00 1,080.00 14.00 1,260.00 15.00 1,350.00
718-01 fertilizer 2,196      LB 1.00 2,196.00 0.55 1,207.80 0.70 1,537.20 0.70 1,537.20
720-01-A erosion control system, slope protection (type a) 405      SQYD 3.00 1,215.00 1.25 506.25 1.50 607.50 1.60 648.00
720-01-C erosion control system, flexible channel liner (type c) 111      SQYD 10.00 1,110.00 4.50 499.50 5.00 555.00 5.60 621.60
722-01 project site laboratory 1      EACH 10,000.00 10,000.00 12,000.00 12,000.00 20,000.00 20,000.00 8,700.00 8,700.00
726-01 bedding material 10.0    CUYD 100.00 1,000.00 135.00 1,350.00 175.00 1,750.00 240.00 2,400.00
727-01 mobilization lump      LUMP 125,000.00 125,000.00 150,000.00 150,000.00 150,000.00 150,000.00 180,000.00 180,000.00
729-16-B object marker assembly (type 2) 2      EACH 100.00 200.00 65.00 130.00 60.00 120.00 75.00 150.00
729-16-C object marker assembly (type 3) 4      EACH 100.00 400.00 80.00 320.00 100.00 400.00 94.00 376.00
731-02 reflectorized raised pavement markers 18      EACH 10.00 180.00 5.50 99.00 20.00 360.00 12.00 216.00
732-02-A plastic pavement striping (solid line) (4" width) 0.497  MILE 3,500.00 1,739.50 2,500.00 1,242.50 10,000.00 4,970.00 7,300.00 3,628.10
732-03-A plastic pavement striping (broken line)(4" width) 0.014  MILE 1,200.00 16.80 850.00 11.90 2,300.00 32.20 3,400.00 47.60
740-01 construction layout lump      LUMP 60,000.00 60,000.00 30,000.00 30,000.00 50,000.00 50,000.00 20,000.00 20,000.00
804-01-F precast concrete piles (24") 1,578      LNFT 122.00 192,516.00 145.00 228,810.00 95.00 149,910.00 170.00 268,260.00
804-12 loading permanent piles 1      EACH 1.00 1.00 23,000.00 23,000.00 8,000.00 8,000.00 100.00 100.00
805-01-F class a concrete (bents) 65.18   CUYD 1,100.00 71,698.00 1,100.00 71,698.00 1,400.00 91,252.00 2,200.00 143,396.00
805-03 class aa concrete 161.10   CUYD 950.00 153,045.00 900.00 144,990.00 1,200.00 193,320.00 1,660.00 267,426.00
805-08-H precast-prestressed concrete girders (type quad beam) 1,185.0    LNFT 126.00 149,310.00 85.00 100,725.00 80.00 94,800.00 108.00 127,980.00
805-11 strip seal joints 60.00   LNFT 240.00 14,400.00 285.00 17,100.00 250.00 15,000.00 285.00 17,100.00
806-01 deformed reinforcing steel 52,525.00   LB 1.17 61,454.25 1.20 63,030.00 1.20 63,030.00 1.40 73,535.00
807-08 structural metalwork lump      LUMP 15,000.00 15,000.00 20,000.00 20,000.00 15,000.00 15,000.00 15,900.00 15,900.00
810-01 concrete railing (barrier) 400.00   LNFT 65.00 26,000.00 80.00 32,000.00 65.00 26,000.00 74.00 29,600.00
813-01 concrete approach slabs 275.12   SQYD 210.00 57,775.20 255.00 70,155.60 215.00 59,150.80 200.00 55,024.00
                       
 CONTRACTOR TOTAL       1,428,495.75   1,520,765.20   1,573,279.34   1,899,468.90
 
Item Number Item Description Quantity Unit of Measure - 5 -
CECIL D. GASSIOTT LLC

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 100,000.00 100,000.00            
202-01 removal of structures & obstructions lump      LUMP 15,300.00 15,300.00            
202-02-A-01 removal of bridges(sta. 116+08.92; 97' x 23' timber
bridge)
1      EACH 100,000.00 100,000.00            
202-02-G removal of surfacing & stabilized base 2,164.7    SQYD 5.00 10,823.50            
202-02-H removal of guard rail 520      LNFT 10.00 5,200.00            
203-02 drainage excavation 2,226      CUYD 10.00 22,260.00            
203-05 excavation & embankment lump      LUMP 100,000.00 100,000.00            
204-05-A temporary sediment check dams (hay) 12      EACH 150.00 1,800.00            
204-06 temporary silt fencing 420      LNFT 5.00 2,100.00            
302-02-D class ii base course (8 1/2" thick) 1,036.4    SQYD 15.00 15,546.00            
304-01 lime 19.58   TON 100.00 1,958.00            
304-04-D lime treatment (type d) (12" thick) 1,036      SQYD 5.00 5,180.00            
401-02 aggregate surface course (adjusted vehicular
measurement)
30      CUYD 75.00 2,250.00            
502-01 superpave asphaltic concrete 376.2    TON 200.00 75,240.00            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
143.1    TON 200.00 28,620.00            
701-01-M cross drain pipe (36" rcp/pcp) 82      LNFT 100.00 8,200.00            
701-05-G side drain pipe (18")(erosion or bridge drain) 160      LNFT 75.00 12,000.00            
701-05-M side drain pipe (36") 44      LNFT 100.00 4,400.00            
701-05-M-01 side drain pipe (36")(erosion or bridge drain) 160      LNFT 100.00 16,000.00            
704-03 blocked out guard rail 237.5    LNFT 25.00 5,937.50            
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 75.00 7,500.00            
704-11-A guard rail end treatment (flared) 4      EACH 2,500.00 10,000.00            
705-01 barbed wire fence 349      LNFT 10.00 3,490.00            
705-02 combination mesh & barbed wire fence 377      LNFT 10.00 3,770.00            
708-01 right-of-way monument 15      EACH 250.00 3,750.00            
708-02 right-of-way monument witness post 15      EACH 250.00 3,750.00            
711-02-D riprap (55 lb) 495      CUYD 500.00 247,500.00            
711-04 geotextile fabric 865      SQYD 5.00 4,325.00            
713-01 temporary signs & barricades lump      LUMP 100,000.00 100,000.00            
717-01 seeding 90      LB 10.00 900.00            
718-01 fertilizer 2,196      LB 1.00 2,196.00            
720-01-A erosion control system, slope protection (type a) 405      SQYD 3.50 1,417.50            
720-01-C erosion control system, flexible channel liner (type c) 111      SQYD 10.00 1,110.00            
722-01 project site laboratory 1      EACH 26,000.00 26,000.00            
726-01 bedding material 10.0    CUYD 50.00 500.00            
727-01 mobilization lump      LUMP 100,000.00 100,000.00            
729-16-B object marker assembly (type 2) 2      EACH 100.00 200.00            
729-16-C object marker assembly (type 3) 4      EACH 100.00 400.00            
731-02 reflectorized raised pavement markers 18      EACH 20.00 360.00            
732-02-A plastic pavement striping (solid line) (4" width) 0.497  MILE 7,500.00 3,727.50            
732-03-A plastic pavement striping (broken line)(4" width) 0.014  MILE 2,500.00 35.00            
740-01 construction layout lump      LUMP 100,000.00 100,000.00            
804-01-F precast concrete piles (24") 1,578      LNFT 180.00 284,040.00            
804-12 loading permanent piles 1      EACH 10,000.00 10,000.00            
805-01-F class a concrete (bents) 65.18   CUYD 1,200.00 78,216.00            
805-03 class aa concrete 161.10   CUYD 800.00 128,880.00            
805-08-H precast-prestressed concrete girders (type quad beam) 1,185.0    LNFT 125.00 148,125.00            
805-11 strip seal joints 60.00   LNFT 135.00 8,100.00            
806-01 deformed reinforcing steel 52,525.00   LB 1.50 78,787.50            
807-08 structural metalwork lump      LUMP 10,000.00 10,000.00            
810-01 concrete railing (barrier) 400.00   LNFT 100.00 40,000.00            
813-01 concrete approach slabs 275.12   SQYD 300.00 82,536.00            
                       