| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GUINN BROTHERS, LLC. |
- 2 - KEY CONSTRUCTORS, INC. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
- 4 - F. MILLER CONSTRUCTION LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
15,000.00 |
15,000.00 |
32,500.00 |
32,500.00 |
55,000.00 |
55,000.00 |
26,000.00 |
26,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
15,000.00 |
15,000.00 |
5,000.00 |
5,000.00 |
30,000.00 |
30,000.00 |
8,500.00 |
8,500.00 |
| 202-02-A-01 |
removal of bridges(sta. 116+08.92; 97' x 23' timber
bridge) |
1   |
EACH |
30,000.00 |
30,000.00 |
15,000.00 |
15,000.00 |
55,000.00 |
55,000.00 |
110,000.00 |
110,000.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
2,164.7 |
SQYD |
5.00 |
10,823.50 |
10.00 |
21,647.00 |
6.20 |
13,421.14 |
8.00 |
17,317.60 |
| 202-02-H |
removal of guard rail
|
520   |
LNFT |
4.00 |
2,080.00 |
10.00 |
5,200.00 |
17.00 |
8,840.00 |
6.20 |
3,224.00 |
| 203-02 |
drainage excavation
|
2,226   |
CUYD |
8.00 |
17,808.00 |
12.00 |
26,712.00 |
8.50 |
18,921.00 |
21.00 |
46,746.00 |
| 203-05 |
excavation & embankment
|
lump |
LUMP |
35,000.00 |
35,000.00 |
70,000.00 |
70,000.00 |
75,000.00 |
75,000.00 |
95,000.00 |
95,000.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
12   |
EACH |
100.00 |
1,200.00 |
100.00 |
1,200.00 |
275.00 |
3,300.00 |
135.00 |
1,620.00 |
| 204-06 |
temporary silt fencing
|
420   |
LNFT |
5.00 |
2,100.00 |
5.00 |
2,100.00 |
4.00 |
1,680.00 |
2.50 |
1,050.00 |
| 302-02-D |
class ii base course (8 1/2" thick)
|
1,036.4 |
SQYD |
45.00 |
46,638.00 |
36.00 |
37,310.40 |
30.00 |
31,092.00 |
22.00 |
22,800.80 |
| 304-01 |
lime
|
19.58 |
TON |
250.00 |
4,895.00 |
250.00 |
4,895.00 |
250.00 |
4,895.00 |
250.00 |
4,895.00 |
| 304-04-D |
lime treatment (type d) (12" thick)
|
1,036   |
SQYD |
10.00 |
10,360.00 |
10.00 |
10,360.00 |
9.00 |
9,324.00 |
9.25 |
9,583.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
30   |
CUYD |
100.00 |
3,000.00 |
100.00 |
3,000.00 |
300.00 |
9,000.00 |
250.00 |
7,500.00 |
| 502-01 |
superpave asphaltic concrete
|
376.2 |
TON |
225.00 |
84,645.00 |
250.00 |
94,050.00 |
175.00 |
65,835.00 |
180.00 |
67,716.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
143.1 |
TON |
400.00 |
57,240.00 |
300.00 |
42,930.00 |
215.00 |
30,766.50 |
360.00 |
51,516.00 |
| 701-01-M |
cross drain pipe (36" rcp/pcp)
|
82   |
LNFT |
200.00 |
16,400.00 |
125.00 |
10,250.00 |
200.00 |
16,400.00 |
130.00 |
10,660.00 |
| 701-05-G |
side drain pipe (18")(erosion or bridge drain)
|
160   |
LNFT |
60.00 |
9,600.00 |
65.00 |
10,400.00 |
115.00 |
18,400.00 |
91.00 |
14,560.00 |
| 701-05-M |
side drain pipe (36")
|
44   |
LNFT |
120.00 |
5,280.00 |
130.00 |
5,720.00 |
175.00 |
7,700.00 |
76.00 |
3,344.00 |
| 701-05-M-01 |
side drain pipe (36")(erosion or bridge drain)
|
160   |
LNFT |
120.00 |
19,200.00 |
110.00 |
17,600.00 |
180.00 |
28,800.00 |
76.00 |
12,160.00 |
| 704-03 |
blocked out guard rail
|
237.5 |
LNFT |
25.00 |
5,937.50 |
21.50 |
5,106.25 |
25.00 |
5,937.50 |
25.00 |
5,937.50 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
65.00 |
6,500.00 |
60.00 |
6,000.00 |
70.00 |
7,000.00 |
75.00 |
7,500.00 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,500.00 |
10,000.00 |
2,500.00 |
10,000.00 |
2,700.00 |
10,800.00 |
2,600.00 |
10,400.00 |
| 705-01 |
barbed wire fence
|
349   |
LNFT |
6.00 |
2,094.00 |
7.00 |
2,443.00 |
8.00 |
2,792.00 |
8.00 |
2,792.00 |
| 705-02 |
combination mesh & barbed wire fence
|
377   |
LNFT |
9.00 |
3,393.00 |
8.00 |
3,016.00 |
9.00 |
3,393.00 |
10.00 |
3,770.00 |
| 708-01 |
right-of-way monument
|
15   |
EACH |
150.00 |
2,250.00 |
300.00 |
4,500.00 |
350.00 |
5,250.00 |
500.00 |
7,500.00 |
| 708-02 |
right-of-way monument witness post
|
15   |
EACH |
150.00 |
2,250.00 |
300.00 |
4,500.00 |
350.00 |
5,250.00 |
500.00 |
7,500.00 |
| 711-02-D |
riprap (55 lb)
|
495   |
CUYD |
80.00 |
39,600.00 |
145.00 |
71,775.00 |
120.00 |
59,400.00 |
160.00 |
79,200.00 |
| 711-04 |
geotextile fabric
|
865   |
SQYD |
5.00 |
4,325.00 |
3.00 |
2,595.00 |
3.50 |
3,027.50 |
3.10 |
2,681.50 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
40,000.00 |
40,000.00 |
40,000.00 |
40,000.00 |
| 717-01 |
seeding
|
90   |
LB |
18.00 |
1,620.00 |
12.00 |
1,080.00 |
14.00 |
1,260.00 |
15.00 |
1,350.00 |
| 718-01 |
fertilizer
|
2,196   |
LB |
1.00 |
2,196.00 |
0.55 |
1,207.80 |
0.70 |
1,537.20 |
0.70 |
1,537.20 |
| 720-01-A |
erosion control system, slope protection (type a)
|
405   |
SQYD |
3.00 |
1,215.00 |
1.25 |
506.25 |
1.50 |
607.50 |
1.60 |
648.00 |
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
111   |
SQYD |
10.00 |
1,110.00 |
4.50 |
499.50 |
5.00 |
555.00 |
5.60 |
621.60 |
| 722-01 |
project site laboratory
|
1   |
EACH |
10,000.00 |
10,000.00 |
12,000.00 |
12,000.00 |
20,000.00 |
20,000.00 |
8,700.00 |
8,700.00 |
| 726-01 |
bedding material
|
10.0 |
CUYD |
100.00 |
1,000.00 |
135.00 |
1,350.00 |
175.00 |
1,750.00 |
240.00 |
2,400.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
125,000.00 |
125,000.00 |
150,000.00 |
150,000.00 |
150,000.00 |
150,000.00 |
180,000.00 |
180,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
2   |
EACH |
100.00 |
200.00 |
65.00 |
130.00 |
60.00 |
120.00 |
75.00 |
150.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
100.00 |
400.00 |
80.00 |
320.00 |
100.00 |
400.00 |
94.00 |
376.00 |
| 731-02 |
reflectorized raised pavement markers
|
18   |
EACH |
10.00 |
180.00 |
5.50 |
99.00 |
20.00 |
360.00 |
12.00 |
216.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.497 |
MILE |
3,500.00 |
1,739.50 |
2,500.00 |
1,242.50 |
10,000.00 |
4,970.00 |
7,300.00 |
3,628.10 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.014 |
MILE |
1,200.00 |
16.80 |
850.00 |
11.90 |
2,300.00 |
32.20 |
3,400.00 |
47.60 |
| 740-01 |
construction layout
|
lump |
LUMP |
60,000.00 |
60,000.00 |
30,000.00 |
30,000.00 |
50,000.00 |
50,000.00 |
20,000.00 |
20,000.00 |
| 804-01-F |
precast concrete piles (24")
|
1,578   |
LNFT |
122.00 |
192,516.00 |
145.00 |
228,810.00 |
95.00 |
149,910.00 |
170.00 |
268,260.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
1.00 |
1.00 |
23,000.00 |
23,000.00 |
8,000.00 |
8,000.00 |
100.00 |
100.00 |
| 805-01-F |
class a concrete (bents)
|
65.18 |
CUYD |
1,100.00 |
71,698.00 |
1,100.00 |
71,698.00 |
1,400.00 |
91,252.00 |
2,200.00 |
143,396.00 |
| 805-03 |
class aa concrete
|
161.10 |
CUYD |
950.00 |
153,045.00 |
900.00 |
144,990.00 |
1,200.00 |
193,320.00 |
1,660.00 |
267,426.00 |
| 805-08-H |
precast-prestressed concrete girders (type quad beam)
|
1,185.0 |
LNFT |
126.00 |
149,310.00 |
85.00 |
100,725.00 |
80.00 |
94,800.00 |
108.00 |
127,980.00 |
| 805-11 |
strip seal joints
|
60.00 |
LNFT |
240.00 |
14,400.00 |
285.00 |
17,100.00 |
250.00 |
15,000.00 |
285.00 |
17,100.00 |
| 806-01 |
deformed reinforcing steel
|
52,525.00 |
LB |
1.17 |
61,454.25 |
1.20 |
63,030.00 |
1.20 |
63,030.00 |
1.40 |
73,535.00 |
| 807-08 |
structural metalwork
|
lump |
LUMP |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
15,000.00 |
15,000.00 |
15,900.00 |
15,900.00 |
| 810-01 |
concrete railing (barrier)
|
400.00 |
LNFT |
65.00 |
26,000.00 |
80.00 |
32,000.00 |
65.00 |
26,000.00 |
74.00 |
29,600.00 |
| 813-01 |
concrete approach slabs
|
275.12 |
SQYD |
210.00 |
57,775.20 |
255.00 |
70,155.60 |
215.00 |
59,150.80 |
200.00 |
55,024.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,428,495.75 |
|
1,520,765.20 |
|
1,573,279.34 |
|
1,899,468.90 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - CECIL D. GASSIOTT LLC |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
100,000.00 |
100,000.00 |
|
|
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
15,300.00 |
15,300.00 |
|
|
|
|
|
|
| 202-02-A-01 |
removal of bridges(sta. 116+08.92; 97' x 23' timber
bridge) |
1   |
EACH |
100,000.00 |
100,000.00 |
|
|
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
2,164.7 |
SQYD |
5.00 |
10,823.50 |
|
|
|
|
|
|
| 202-02-H |
removal of guard rail
|
520   |
LNFT |
10.00 |
5,200.00 |
|
|
|
|
|
|
| 203-02 |
drainage excavation
|
2,226   |
CUYD |
10.00 |
22,260.00 |
|
|
|
|
|
|
| 203-05 |
excavation & embankment
|
lump |
LUMP |
100,000.00 |
100,000.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
12   |
EACH |
150.00 |
1,800.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
420   |
LNFT |
5.00 |
2,100.00 |
|
|
|
|
|
|
| 302-02-D |
class ii base course (8 1/2" thick)
|
1,036.4 |
SQYD |
15.00 |
15,546.00 |
|
|
|
|
|
|
| 304-01 |
lime
|
19.58 |
TON |
100.00 |
1,958.00 |
|
|
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
1,036   |
SQYD |
5.00 |
5,180.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
30   |
CUYD |
75.00 |
2,250.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
376.2 |
TON |
200.00 |
75,240.00 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
143.1 |
TON |
200.00 |
28,620.00 |
|
|
|
|
|
|
| 701-01-M |
cross drain pipe (36" rcp/pcp)
|
82   |
LNFT |
100.00 |
8,200.00 |
|
|
|
|
|
|
| 701-05-G |
side drain pipe (18")(erosion or bridge drain)
|
160   |
LNFT |
75.00 |
12,000.00 |
|
|
|
|
|
|
| 701-05-M |
side drain pipe (36")
|
44   |
LNFT |
100.00 |
4,400.00 |
|
|
|
|
|
|
| 701-05-M-01 |
side drain pipe (36")(erosion or bridge drain)
|
160   |
LNFT |
100.00 |
16,000.00 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
237.5 |
LNFT |
25.00 |
5,937.50 |
|
|
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
75.00 |
7,500.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,500.00 |
10,000.00 |
|
|
|
|
|
|
| 705-01 |
barbed wire fence
|
349   |
LNFT |
10.00 |
3,490.00 |
|
|
|
|
|
|
| 705-02 |
combination mesh & barbed wire fence
|
377   |
LNFT |
10.00 |
3,770.00 |
|
|
|
|
|
|
| 708-01 |
right-of-way monument
|
15   |
EACH |
250.00 |
3,750.00 |
|
|
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
15   |
EACH |
250.00 |
3,750.00 |
|
|
|
|
|
|
| 711-02-D |
riprap (55 lb)
|
495   |
CUYD |
500.00 |
247,500.00 |
|
|
|
|
|
|
| 711-04 |
geotextile fabric
|
865   |
SQYD |
5.00 |
4,325.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
100,000.00 |
100,000.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
90   |
LB |
10.00 |
900.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
2,196   |
LB |
1.00 |
2,196.00 |
|
|
|
|
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
405   |
SQYD |
3.50 |
1,417.50 |
|
|
|
|
|
|
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
111   |
SQYD |
10.00 |
1,110.00 |
|
|
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
26,000.00 |
26,000.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
10.0 |
CUYD |
50.00 |
500.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
100,000.00 |
100,000.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
2   |
EACH |
100.00 |
200.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
100.00 |
400.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
18   |
EACH |
20.00 |
360.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.497 |
MILE |
7,500.00 |
3,727.50 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.014 |
MILE |
2,500.00 |
35.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
100,000.00 |
100,000.00 |
|
|
|
|
|
|
| 804-01-F |
precast concrete piles (24")
|
1,578   |
LNFT |
180.00 |
284,040.00 |
|
|
|
|
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
65.18 |
CUYD |
1,200.00 |
78,216.00 |
|
|
|
|
|
|
| 805-03 |
class aa concrete
|
161.10 |
CUYD |
800.00 |
128,880.00 |
|
|
|
|
|
|
| 805-08-H |
precast-prestressed concrete girders (type quad beam)
|
1,185.0 |
LNFT |
125.00 |
148,125.00 |
|
|
|
|
|
|
| 805-11 |
strip seal joints
|
60.00 |
LNFT |
135.00 |
8,100.00 |
|
|
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
52,525.00 |
LB |
1.50 |
78,787.50 |
|
|
|
|
|
|
| 807-08 |
structural metalwork
|
lump |
LUMP |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 810-01 |
concrete railing (barrier)
|
400.00 |
LNFT |
100.00 |
40,000.00 |
|
|
|
|
|
|
| 813-01 |
concrete approach slabs
|
275.12 |
SQYD |
300.00 |
82,536.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,022,430.50 |
|
|
|
|
|
|
|