| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - RMD HOLDINGS LTD |
- 2 - M & M ENTERPRISES OF BASTROP, LLC |
- 3 - FORBY CONTRACTING, INC. |
- 4 - AMETHYST CONSTRUCTION, INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
16,000.00 |
16,000.00 |
5,000.00 |
5,000.00 |
2,500.00 |
2,500.00 |
20,000.00 |
20,000.00 |
| 202-02-D |
removal of concrete walks & drives
|
80   |
SQYD |
15.00 |
1,200.00 |
25.00 |
2,000.00 |
30.00 |
2,400.00 |
6.00 |
480.00 |
| 202-02-E |
removal of concrete curbs
|
456.0 |
LNFT |
12.00 |
5,472.00 |
10.00 |
4,560.00 |
10.00 |
4,560.00 |
8.00 |
3,648.00 |
| 203-05 |
excavation and embankment
|
lump |
LUMP |
11,000.00 |
11,000.00 |
11,000.00 |
11,000.00 |
5,000.00 |
5,000.00 |
30,000.00 |
30,000.00 |
| 204-02 |
temporary hay or straw bales
|
200   |
EACH |
15.00 |
3,000.00 |
10.00 |
2,000.00 |
10.00 |
2,000.00 |
10.00 |
2,000.00 |
| 701-03-I |
storm drain pipe (24" rcp)
|
80   |
LNFT |
55.00 |
4,400.00 |
80.00 |
6,400.00 |
150.00 |
12,000.00 |
75.00 |
6,000.00 |
| 706-01-A |
concrete walk (4" thick)
|
2,854.0 |
SQYD |
41.00 |
117,014.00 |
45.00 |
128,430.00 |
55.00 |
156,970.00 |
60.00 |
171,240.00 |
| 706-04 |
handicapped curb ramps
|
75.0 |
each |
500.00 |
37,500.00 |
250.00 |
18,750.00 |
750.00 |
56,250.00 |
1,200.00 |
90,000.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
3,500.00 |
3,500.00 |
13,000.00 |
13,000.00 |
5,000.00 |
5,000.00 |
45,000.00 |
45,000.00 |
| 717-01 |
seeding
|
16   |
LB |
20.00 |
320.00 |
20.00 |
320.00 |
20.00 |
320.00 |
12.00 |
192.00 |
| 718-01 |
fertilizer
|
775   |
LB |
1.00 |
775.00 |
1.75 |
1,356.25 |
1.00 |
775.00 |
1.00 |
775.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
18,000.00 |
18,000.00 |
12,000.00 |
12,000.00 |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
| 729-01 |
sign (type a)
|
48.0 |
SQFT |
65.00 |
3,120.00 |
42.00 |
2,016.00 |
50.00 |
2,400.00 |
20.00 |
960.00 |
| 729-21 |
u-channel post
|
24   |
EACH |
25.00 |
600.00 |
80.00 |
1,920.00 |
10.00 |
240.00 |
150.00 |
3,600.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
1,216   |
LNFT |
2.20 |
2,675.20 |
7.00 |
8,512.00 |
3.50 |
4,256.00 |
2.00 |
2,432.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
5,500.00 |
5,500.00 |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
2,400.00 |
2,400.00 |
| 741-11 |
adjusting water valve and meter box
|
15   |
EACH |
375.00 |
5,625.00 |
400.00 |
6,000.00 |
100.00 |
1,500.00 |
600.00 |
9,000.00 |
| S-001 |
sidewalk turndown with handrail
|
13   |
EACH |
520.00 |
6,760.00 |
800.00 |
10,400.00 |
1,500.00 |
19,500.00 |
1,500.00 |
19,500.00 |
| S-002 |
sidewalk drain
|
5   |
EACH |
637.00 |
3,185.00 |
1,000.00 |
5,000.00 |
1,000.00 |
5,000.00 |
1,600.00 |
8,000.00 |
| S-003 |
yard drainage structure
|
4   |
EACH |
640.00 |
2,560.00 |
1,500.00 |
6,000.00 |
1,500.00 |
6,000.00 |
2,600.00 |
10,400.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
248,206.20 |
|
249,664.25 |
|
306,671.00 |
|
435,627.00 |
|