Lead Project: 256-32-0012
Parish: ST JAMES
Routes: LA 3274, LA 3219
Description: LA 44 - US 61 AND LA 18 - LA 3127
Type Const: grading, pavement patching, superpave asphaltic concrete overlay and related work.
Estimated Construction Cost: $1,310,379.95
 
RankLicenseBidderConstruction Bid
1 00046 BARBER BROS. CONTRACTING CO., L.L.C $1,020,790.20
2 06276 BARRIERE CONSTRUCTION CO., LLC $1,026,439.84
3 00481 COASTAL BRIDGE CO., L.L.C. $1,132,979.73
4 00849 F.G. SULLIVAN, JR. CONTRACTOR LLC $1,237,412.94
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARBER BROS. CONTRACTING CO., L.L.C
- 2 -
BARRIERE CONSTRUCTION CO., LLC
- 3 -
COASTAL BRIDGE CO., L.L.C.
- 4 -
F.G. SULLIVAN, JR. CONTRACTOR LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
204-02 temporary hay or straw bales 84      EACH 25.00 2,100.00 1.00 84.00 1.00 84.00 8.00 672.00
204-06 temporary silt fencing 10,085      LNFT 1.50 15,127.50 0.05 504.25 0.10 1,008.50 1.25 12,606.25
401-02 aggregate surface course (adjusted vehicular
measurement)
1,520.5    CUYD 77.00 117,078.50 1.00 1,520.50 25.00 38,012.50 20.00 30,410.00
502-01 superpave asphaltic concrete 5,465.6    TON 95.00 519,232.00 99.00 541,094.40 107.75 588,918.40 100.00 546,560.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,357.8    TON 110.00 149,358.00 99.00 134,422.20 175.00 237,615.00 150.00 203,670.00
509-01 cold planing asphaltic pavement 1,021      SQYD 5.00 5,105.00 1.00 1,021.00 5.00 5,105.00 20.00 20,420.00
509-02 contractor retained reclaimed asphaltic pavement - 21      CUYD 0.00 0.00 0.10 - 2.10 0.00 0.00 0.01 - 0.21
510-01-B pavement patching (12" minimum thickness) 275      SQYD 120.00 33,000.00 25.00 6,875.00 82.50 22,687.50 135.00 37,125.00
713-01 temporary signs & barricades lump      LUMP 10,000.00 10,000.00 90,000.00 90,000.00 5,000.00 5,000.00 151,000.00 151,000.00
713-02-E temporary pavement markings (24" width) 222      LNFT 3.00 666.00 0.10 22.20 1.00 222.00 0.40 88.80
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
3.790  MILE 350.00 1,326.50 130.00 492.70 450.00 1,705.50 600.00 2,274.00
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
2.230  MILE 520.00 1,159.60 0.10 0.22 250.00 557.50 100.00 223.00
713-04-A temporary pavement markings (solid line)(4" width) 12.679  MILE 750.00 9,509.25 0.10 1.27 1.00 12.68 100.00 1,267.90
713-05-D temporary pavement legends and symbols (rr crossing) 4      EACH 250.00 1,000.00 50.00 200.00 115.00 460.00 15.00 60.00
727-01 mobilization lump      LUMP 40,000.00 40,000.00 90,000.00 90,000.00 155,000.00 155,000.00 100,000.00 100,000.00
729-16-B object marker assembly (type 2) 16      EACH 75.00 1,200.00 50.00 800.00 75.00 1,200.00 60.00 960.00
729-16-C object marker assembly (type 3) 6      EACH 80.00 480.00 75.00 450.00 90.00 540.00 80.00 480.00
731-02 reflectorized raised pavement markers 515      EACH 7.00 3,605.00 5.00 2,575.00 6.00 3,090.00 6.00 3,090.00
732-01-E plastic pavement striping (24" width) 222      LNFT 5.50 1,221.00 3.00 666.00 3.75 832.50 4.00 888.00
732-02-A plastic pavement striping (solid line) (4" width) 12.679  MILE 2,600.00 32,965.40 2,500.00 31,697.50 2,750.00 34,867.25 2,800.00 35,501.20
732-03-A plastic pavement striping (broken line)(4" width) 2.230  MILE 865.00 1,928.95 690.00 1,538.70 780.00 1,739.40 900.00 2,007.00
732-04-D plastic pavement legends & symbols (rr crossing) 4      EACH 375.00 1,500.00 400.00 1,600.00 450.00 1,800.00 500.00 2,000.00
735-01 mailboxes 122      EACH 5.00 610.00 1.00 122.00 1.00 122.00 5.00 610.00
735-02 mailbox supports (single) 93      EACH 145.00 13,485.00 100.00 9,300.00 125.00 11,625.00 125.00 11,625.00
735-03 mailbox supports (double) 3      EACH 155.00 465.00 100.00 300.00 205.00 615.00 150.00 450.00
735-04 mailbox supports (multiple) 6      EACH 325.00 1,950.00 100.00 600.00 305.00 1,830.00 275.00 1,650.00
740-01 construction layout lump      LUMP 2,000.00 2,000.00 30,000.00 30,000.00 5,000.00 5,000.00 24,000.00 24,000.00
S-001 saw cutting asphaltic concrete patches (12" deep) 555      LNFT 8.50 4,717.50 1.00 555.00 6.00 3,330.00 5.00 2,775.00
S-002 surface preparation lump      LUMP 50,000.00 50,000.00 80,000.00 80,000.00 10,000.00 10,000.00 45,000.00 45,000.00
                       
 CONTRACTOR TOTAL       1,020,790.20   1,026,439.84   1,132,979.73   1,237,412.94