| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARBER BROS. CONTRACTING CO., L.L.C |
- 2 - BARRIERE CONSTRUCTION CO., LLC |
- 3 - COASTAL BRIDGE CO., L.L.C. |
- 4 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 204-02 |
temporary hay or straw bales
|
84   |
EACH |
25.00 |
2,100.00 |
1.00 |
84.00 |
1.00 |
84.00 |
8.00 |
672.00 |
| 204-06 |
temporary silt fencing
|
10,085   |
LNFT |
1.50 |
15,127.50 |
0.05 |
504.25 |
0.10 |
1,008.50 |
1.25 |
12,606.25 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,520.5 |
CUYD |
77.00 |
117,078.50 |
1.00 |
1,520.50 |
25.00 |
38,012.50 |
20.00 |
30,410.00 |
| 502-01 |
superpave asphaltic concrete
|
5,465.6 |
TON |
95.00 |
519,232.00 |
99.00 |
541,094.40 |
107.75 |
588,918.40 |
100.00 |
546,560.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,357.8 |
TON |
110.00 |
149,358.00 |
99.00 |
134,422.20 |
175.00 |
237,615.00 |
150.00 |
203,670.00 |
| 509-01 |
cold planing asphaltic pavement
|
1,021   |
SQYD |
5.00 |
5,105.00 |
1.00 |
1,021.00 |
5.00 |
5,105.00 |
20.00 |
20,420.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 21   |
CUYD |
0.00 |
0.00 |
0.10 |
- 2.10 |
0.00 |
0.00 |
0.01 |
- 0.21 |
| 510-01-B |
pavement patching (12" minimum thickness)
|
275   |
SQYD |
120.00 |
33,000.00 |
25.00 |
6,875.00 |
82.50 |
22,687.50 |
135.00 |
37,125.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
90,000.00 |
90,000.00 |
5,000.00 |
5,000.00 |
151,000.00 |
151,000.00 |
| 713-02-E |
temporary pavement markings (24" width)
|
222   |
LNFT |
3.00 |
666.00 |
0.10 |
22.20 |
1.00 |
222.00 |
0.40 |
88.80 |
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
3.790 |
MILE |
350.00 |
1,326.50 |
130.00 |
492.70 |
450.00 |
1,705.50 |
600.00 |
2,274.00 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
2.230 |
MILE |
520.00 |
1,159.60 |
0.10 |
0.22 |
250.00 |
557.50 |
100.00 |
223.00 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
12.679 |
MILE |
750.00 |
9,509.25 |
0.10 |
1.27 |
1.00 |
12.68 |
100.00 |
1,267.90 |
| 713-05-D |
temporary pavement legends and symbols (rr crossing)
|
4   |
EACH |
250.00 |
1,000.00 |
50.00 |
200.00 |
115.00 |
460.00 |
15.00 |
60.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
40,000.00 |
40,000.00 |
90,000.00 |
90,000.00 |
155,000.00 |
155,000.00 |
100,000.00 |
100,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
16   |
EACH |
75.00 |
1,200.00 |
50.00 |
800.00 |
75.00 |
1,200.00 |
60.00 |
960.00 |
| 729-16-C |
object marker assembly (type 3)
|
6   |
EACH |
80.00 |
480.00 |
75.00 |
450.00 |
90.00 |
540.00 |
80.00 |
480.00 |
| 731-02 |
reflectorized raised pavement markers
|
515   |
EACH |
7.00 |
3,605.00 |
5.00 |
2,575.00 |
6.00 |
3,090.00 |
6.00 |
3,090.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
222   |
LNFT |
5.50 |
1,221.00 |
3.00 |
666.00 |
3.75 |
832.50 |
4.00 |
888.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
12.679 |
MILE |
2,600.00 |
32,965.40 |
2,500.00 |
31,697.50 |
2,750.00 |
34,867.25 |
2,800.00 |
35,501.20 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.230 |
MILE |
865.00 |
1,928.95 |
690.00 |
1,538.70 |
780.00 |
1,739.40 |
900.00 |
2,007.00 |
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
4   |
EACH |
375.00 |
1,500.00 |
400.00 |
1,600.00 |
450.00 |
1,800.00 |
500.00 |
2,000.00 |
| 735-01 |
mailboxes
|
122   |
EACH |
5.00 |
610.00 |
1.00 |
122.00 |
1.00 |
122.00 |
5.00 |
610.00 |
| 735-02 |
mailbox supports (single)
|
93   |
EACH |
145.00 |
13,485.00 |
100.00 |
9,300.00 |
125.00 |
11,625.00 |
125.00 |
11,625.00 |
| 735-03 |
mailbox supports (double)
|
3   |
EACH |
155.00 |
465.00 |
100.00 |
300.00 |
205.00 |
615.00 |
150.00 |
450.00 |
| 735-04 |
mailbox supports (multiple)
|
6   |
EACH |
325.00 |
1,950.00 |
100.00 |
600.00 |
305.00 |
1,830.00 |
275.00 |
1,650.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
2,000.00 |
2,000.00 |
30,000.00 |
30,000.00 |
5,000.00 |
5,000.00 |
24,000.00 |
24,000.00 |
| S-001 |
saw cutting asphaltic concrete patches (12" deep)
|
555   |
LNFT |
8.50 |
4,717.50 |
1.00 |
555.00 |
6.00 |
3,330.00 |
5.00 |
2,775.00 |
| S-002 |
surface preparation
|
lump |
LUMP |
50,000.00 |
50,000.00 |
80,000.00 |
80,000.00 |
10,000.00 |
10,000.00 |
45,000.00 |
45,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,020,790.20 |
|
1,026,439.84 |
|
1,132,979.73 |
|
1,237,412.94 |
|