Letting of 10/29/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 251-02-0034
Parish: W FELICIANA
Routes: LA 66
Description: LA 66 BRIDGES
Type Const: grading, drainage structures, class ii base course, lime treatment, superpave asphaltic
concrete pavement, concrete slab span and girder span bridges, and related work.
Estimated Construction Cost: $24,459,969.30
Maximum Number of Days Allowed for Construction: 900
Calculated Daily User Cost: $1,000.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Total Bid
1 42076 AUSTIN BRIDGE & ROAD, LP $20,130,676.23 900 $21,030,676.23
2 39462 DENTON-JAMES LLC $22,259,613.90 900 $23,159,613.90
3 34567 JAMES CONSTRUCTION GROUP LLC $22,389,135.23 900 $23,289,135.23
4 09476 KEY CONSTRUCTORS, INC. $22,483,678.95 900 $23,383,678.95
5 00481 COASTAL BRIDGE CO., L.L.C. $23,012,488.00 870 $23,882,488.00
6 12312 GILCHRIST CONSTRUCTION CO. LLC $23,118,371.84 875 $23,993,371.84
 
Item Number Item Description Quantity Unit of Measure - 1 -
AUSTIN BRIDGE & ROAD, LP
- 2 -
DENTON-JAMES LLC
- 3 -
JAMES CONSTRUCTION GROUP LLC
- 4 -
KEY CONSTRUCTORS, INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 1,094,220.00 1,094,220.00 900,000.00 900,000.00 900,000.00 900,000.00 300,000.00 300,000.00
202-01 removal of structures and obstructions lump      LUMP 50,000.00 50,000.00 100,000.00 100,000.00 70,000.00 70,000.00 50,000.00 50,000.00
202-02-A-01 removal of bridges (sta. 109+00; 28'x 152') 1      EACH 60,000.00 60,000.00 350,000.00 350,000.00 37,000.00 37,000.00 40,000.00 40,000.00
202-02-A-02 removal of bridges (sta. 205+99.40; 28'x 190') 1      EACH 70,000.00 70,000.00 350,000.00 350,000.00 18,500.00 18,500.00 50,000.00 50,000.00
202-02-A-03 removal of bridges (sta. 309+00.00; 28'x 76') 1      EACH 50,000.00 50,000.00 350,000.00 350,000.00 18,500.00 18,500.00 20,000.00 20,000.00
202-02-A-04 removal of bridges (sta. 608+14.00; 27.5'x 114') 1      EACH 60,000.00 60,000.00 350,000.00 350,000.00 28,000.00 28,000.00 30,000.00 30,000.00
202-02-A-05 removal of bridges (sta. 709+00.00; 27.5'x 114') 1      EACH 60,000.00 60,000.00 350,000.00 350,000.00 28,000.00 28,000.00 30,000.00 30,000.00
202-02-A-06 removal of bridges (sta. 807+92.00; 24.3'x 57') 1      EACH 50,000.00 50,000.00 350,000.00 350,000.00 14,000.00 14,000.00 15,000.00 15,000.00
202-02-G removal of surfacing & stabilized base 13,729.6    SQYD 12.00 164,755.20 7.00 96,107.20 3.80 52,172.48 6.75 92,674.80
203-01 general excavation 63,387      CUYD 14.00 887,418.00 11.00 697,257.00 4.80 304,257.60 9.50 602,176.50
203-02 drainage excavation 80,340      CUYD 17.00 1,365,780.00 10.00 803,400.00 15.00 1,205,100.00 10.30 827,502.00
203-03 embankment 22,583      CUYD 12.00 270,996.00 22.00 496,826.00 15.00 338,745.00 13.00 293,579.00
204-02 temporary hay or straw bales 35      EACH 12.50 437.50 20.00 700.00 19.00 665.00 12.00 420.00
204-03 temporary slope drains 1,500      LNFT 16.00 24,000.00 25.00 37,500.00 13.00 19,500.00 16.00 24,000.00
204-05-A temporary sediment check dams (hay) 882      EACH 95.00 83,790.00 100.00 88,200.00 120.00 105,840.00 100.00 88,200.00
204-05-B temporary sediment check dams (stone) 16      EACH 550.00 8,800.00 1,000.00 16,000.00 500.00 8,000.00 750.00 12,000.00
204-06 temporary silt fencing 14,788      LNFT 1.25 18,485.00 2.00 29,576.00 2.30 34,012.40 2.75 40,667.00
302-02-B class ii base course (6" thick) 2,517.7    SQYD 18.00 45,318.60 35.00 88,119.50 17.00 42,800.90 30.00 75,531.00
302-02-F class ii base course (12" thick) 14,168.2    SQYD 33.00 467,550.60 45.00 637,569.00 33.00 467,550.60 50.00 708,410.00
304-01 lime 200.83   TON 130.00 26,107.90 170.00 34,141.10 210.00 42,174.30 160.00 32,132.80
304-04-D lime treatment (type d) (12" thick) 14,168      SQYD 4.00 56,672.00 6.00 85,008.00 2.25 31,878.00 10.00 141,680.00
305-01-D subgrade layer (12" thick) 13,749      SQYD 9.00 123,741.00 15.00 206,235.00 14.00 192,486.00 20.00 274,980.00
401-02 aggregate surface course (adjusted vehicular
measurement)
337      CUYD 120.00 40,440.00 120.00 40,440.00 70.00 23,590.00 120.00 40,440.00
402-01 traffic maintenance aggregate (vehicular measurement) 100.0    CUYD 140.00 14,000.00 100.00 10,000.00 130.00 13,000.00 135.00 13,500.00
502-01 superpave asphaltic concrete 3,219.4    TON 150.00 482,910.00 240.00 772,656.00 215.00 692,171.00 175.00 563,395.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
54.2    TON 450.00 24,390.00 500.00 27,100.00 350.00 18,970.00 300.00 16,260.00
701-01-K cross drain pipe (30" rcp/pcp) 100      LNFT 113.62 11,362.00 100.00 10,000.00 95.00 9,500.00 115.00 11,500.00
701-03-G storm drain pipe (18" rcp/pcp) 194      LNFT 83.11 16,123.34 75.00 14,550.00 55.00 10,670.00 85.00 16,490.00
701-03-I storm drain pipe (24" rcp/pcp) 80      LNFT 96.15 7,692.00 80.00 6,400.00 75.00 6,000.00 100.00 8,000.00
701-03-K storm drain pipe (30" rcp/pcp) 20      LNFT 125.31 2,506.20 140.00 2,800.00 110.00 2,200.00 125.00 2,500.00
701-05-I side drain pipe (24") 306      LNFT 54.45 16,661.70 80.00 24,480.00 70.00 21,420.00 55.00 16,830.00
701-05-I-01 side drain pipe (24") (erosion) 138      LNFT 61.35 8,466.30 100.00 13,800.00 70.00 9,660.00 65.00 8,970.00
701-05-K side drain pipe (30") 24      LNFT 95.00 2,280.00 110.00 2,640.00 95.00 2,280.00 95.00 2,280.00
701-05-K-01 side drain pipe (30") (erosion) 36      LNFT 105.00 3,780.00 110.00 3,960.00 100.00 3,600.00 105.00 3,780.00
701-06-B side drain pipe arch (18" equiv.) 38      LNFT 55.00 2,090.00 90.00 3,420.00 80.00 3,040.00 55.00 2,090.00
701-06-E-01 side drain pipe arch (30" equiv.) (erosion) 72      LNFT 160.00 11,520.00 100.00 7,200.00 115.00 8,280.00 160.00 11,520.00
701-06-F-01 side drain pipe arch (36" equiv.) (erosion) 156      LNFT 189.05 29,491.80 140.00 21,840.00 150.00 23,400.00 170.00 26,520.00
701-06-I-01 side drain pipe arch (54" equiv.) (erosion) 120      LNFT 322.83 38,739.60 220.00 26,400.00 255.00 30,600.00 290.00 34,800.00
701-11-H reinforced concrete pipe arch (extension)(48" equiv.) 4      LNFT 1,185.61 4,742.44 600.00 2,400.00 330.00 1,320.00 500.00 2,000.00
702-03-A catch basins (cb-01) 4      EACH 2,000.00 8,000.00 3,000.00 12,000.00 4,800.00 19,200.00 2,000.00 8,000.00
702-03-B catch basins (cb-02) 1      EACH 3,500.00 3,500.00 4,500.00 4,500.00 6,300.00 6,300.00 3,500.00 3,500.00
702-08-A side drain safety end (type 1) 4      EACH 2,300.00 9,200.00 2,500.00 10,000.00 2,100.00 8,400.00 2,300.00 9,200.00
704-03 blocked out guard rail 1,264.9    LNFT 21.00 26,562.90 22.00 27,827.80 21.00 26,562.90 22.00 27,827.80
704-08-B guard rail transitions (double thrie beam) 600.0    LNFT 55.00 33,000.00 70.00 42,000.00 55.00 33,000.00 58.00 34,800.00
704-11-A guard rail end treatment (flared) 23      EACH 2,000.00 46,000.00 2,200.00 50,600.00 2,000.00 46,000.00 2,050.00 47,150.00
706-03-A incidental concrete paving (4" thick) 60.0    SQYD 221.17 13,270.20 110.00 6,600.00 150.00 9,000.00 130.00 7,800.00
708-01 right-of-way monument 87      EACH 120.00 10,440.00 200.00 17,400.00 215.00 18,705.00 300.00 26,100.00
708-02 right-of-way monument witness post 87      EACH 120.00 10,440.00 200.00 17,400.00 80.00 6,960.00 300.00 26,100.00
711-01-C riprap (30 lb, 6"thick) 271      SQYD 83.00 22,493.00 90.00 24,390.00 90.00 24,390.00 100.00 27,100.00
711-01-D riprap (55 lb, 24"thick) 13,100      SQYD 71.93 942,283.00 75.00 982,500.00 70.00 917,000.00 75.00 982,500.00
713-01 temporary signs & barricades lump      LUMP 75,900.00 75,900.00 360,000.00 360,000.00 85,000.00 85,000.00 150,000.00 150,000.00
713-04-A temporary pavement markings (solid line)(4" width) 6.766  MILE 600.35 4,061.97 600.00 4,059.60 600.00 4,059.60 500.00 3,383.00
713-07 temporary precast concrete barrier (contractor
furnished)
1,560      EACH 939.64 1,465,838.40 200.00 312,000.00 1,300.00 2,028,000.00 1,000.00 1,560,000.00
713-08 temporary precast concrete barrier (department
furnished)
500      EACH 459.80 229,900.00 300.00 150,000.00 300.00 150,000.00 300.00 150,000.00
716-01-A mulch (vegetative) 0.5    TON 950.00 475.00 1,000.00 500.00 950.00 475.00 900.00 450.00
717-01 seeding 889      LB 10.00 8,890.00 12.00 10,668.00 10.00 8,890.00 7.00 6,223.00
718-01 fertilizer 20,734      LB 0.55 11,403.70 0.60 12,440.40 0.55 11,403.70 0.55 11,403.70
720-01-A erosion control system, slope protection (type a) 2,123      SQYD 1.35 2,866.05 1.50 3,184.50 1.35 2,866.05 1.05 2,229.15
720-01-C erosion control system, flexible channel liner (type c) 502      SQYD 1.35 677.70 1.50 753.00 1.35 677.70 2.95 1,480.90
720-01-D erosion control system, flexible channel liner (type d) 5,689      SQYD 1.35 7,680.15 1.50 8,533.50 1.35 7,680.15 2.95 16,782.55
720-01-E erosion control system, flexible channel liner (type e) 2,639      SQYD 2.10 5,541.90 2.40 6,333.60 2.10 5,541.90 3.15 8,312.85
720-01-F erosion control system, flexible channel liner (type f) 966      SQYD 2.10 2,028.60 2.40 2,318.40 2.10 2,028.60 3.15 3,042.90
722-01 project site laboratory 3      EACH 19,764.00 59,292.00 20,000.00 60,000.00 25,000.00 75,000.00 30,000.00 90,000.00
725-01 temporary detour roads 15,574.9    SQYD 72.79 1,133,696.97 50.00 778,745.00 55.00 856,619.50 100.00 1,557,490.00
726-01 bedding material 99.7    CUYD 54.16 5,399.75 120.00 11,964.00 75.00 7,477.50 110.00 10,967.00
727-01 mobilization lump      LUMP 2,000,000.00 2,000,000.00 2,100,000.00 2,100,000.00 2,200,000.00 2,200,000.00 2,080,000.00 2,080,000.00
729-16-C object marker assembly (type 3) 24      EACH 75.00 1,800.00 80.00 1,920.00 75.00 1,800.00 85.00 2,040.00
731-01 nonreflectorized raised pavement markers 454      EACH 10.00 4,540.00 11.00 4,994.00 10.00 4,540.00 10.50 4,767.00
731-02 reflectorized raised pavement markers 234      EACH 4.50 1,053.00 5.50 1,287.00 4.50 1,053.00 5.10 1,193.40
732-02-A plastic pavement striping (solid line) (4" width) 6.940  MILE 2,500.00 17,350.00 2,500.00 17,350.00 2,500.00 17,350.00 2,390.00 16,586.60
740-01 construction layout lump      LUMP 250,000.00 250,000.00 340,000.00 340,000.00 350,000.00 350,000.00 200,000.00 200,000.00
740-02 utility oversight and coordination lump      LUMP 12,000.00 12,000.00 100,000.00 100,000.00 10,000.00 10,000.00 75,000.00 75,000.00
803-03 steel sheet pile wall 1,500      SQFT 15.00 22,500.00 60.00 90,000.00 50.00 75,000.00 60.00 90,000.00
804-01-C precast concrete piles (16") 3,248      LNFT 55.00 178,640.00 90.00 292,320.00 94.00 305,312.00 75.00 243,600.00
804-01-D precast concrete piles (18") 8,634      LNFT 65.00 561,210.00 100.00 863,400.00 92.00 794,328.00 100.00 863,400.00
804-01-F precast concrete piles (24") 8,470      LNFT 70.00 592,900.00 140.00 1,185,800.00 135.00 1,143,450.00 170.00 1,439,900.00
804-05 precast concrete test piles 5      EACH 20,000.00 100,000.00 30,000.00 150,000.00 70,000.00 350,000.00 20,000.00 100,000.00
804-09 loading test piles 5      EACH 23,000.00 115,000.00 20,000.00 100,000.00 20,000.00 100,000.00 15,000.00 75,000.00
804-10 reloading test piles 5      EACH 5,000.00 25,000.00 1,000.00 5,000.00 5,500.00 27,500.00 1,000.00 5,000.00
804-11 redriving test piles 5      EACH 5,000.00 25,000.00 1,000.00 5,000.00 2,000.00 10,000.00 1,000.00 5,000.00
805-01-C class a concrete (retaining walls) 31.52   CUYD 2,400.00 75,648.00 1,500.00 47,280.00 1,200.00 37,824.00 1,500.00 47,280.00
805-01-F class a concrete (bents) 869.94   CUYD 1,300.00 1,130,922.00 1,500.00 1,304,910.00 975.00 848,191.50 1,200.00 1,043,928.00
805-03 class aa concrete 2,308.09   CUYD 918.00 2,118,826.62 850.00 1,961,876.50 875.00 2,019,578.75 1,000.00 2,308,090.00
805-08-H precast-prestressed concrete girders (type quad beam) 7,742.0    LNFT 75.00 580,650.00 95.00 735,490.00 80.00 619,360.00 93.00 720,006.00
806-01 deformed reinforcing steel 695,242      LB 1.07 743,908.94 1.40 973,338.80 1.55 1,077,625.10 1.20 834,290.40
807-08 structural metalwork lump      LUMP 46,500.00 46,500.00 100,000.00 100,000.00 80,000.00 80,000.00 75,000.00 75,000.00
810-01 concrete railing (barrier) 2,520.00   LNFT 110.00 277,200.00 75.00 189,000.00 65.00 163,800.00 70.00 176,400.00
813-01 concrete approach slabs 3,008.84   SQYD 180.00 541,591.20 250.00 752,210.00 300.00 902,652.00 265.00 797,342.60
S-001 temporary construction sheeting 36,933      SQFT 16.00 590,928.00 15.00 553,995.00 50.00 1,846,650.00 48.00 1,772,784.00
S-101 special guard rail anchor section 1      EACH 1,400.00 1,400.00 1,000.00 1,000.00 1,400.00 1,400.00 1,400.00 1,400.00
S-102 impact attenuators (construction zone) 12      EACH 18,500.00 222,000.00 5,000.00 60,000.00 16,800.00 201,600.00 17,000.00 204,000.00
                       
 ITEM TOTAL (CONSTRUCTION BID)       20,130,676.23   22,259,613.90   22,389,135.23   22,483,678.95
 NUMBER OF DAYS BID AT $1,000 PER DAY.       900,000.00   900,000.00   900,000.00   900,000.00
 TOTAL BID       21,030,676.23   23,159,613.90   23,289,135.23   23,383,678.95
 
Item Number Item Description Quantity Unit of Measure - 5 -
COASTAL BRIDGE CO., L.L.C.
- 6 -
GILCHRIST CONSTRUCTION CO. LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 800,000.00 800,000.00 600,000.00 600,000.00        
202-01 removal of structures and obstructions lump      LUMP 50,000.00 50,000.00 45,000.00 45,000.00        
202-02-A-01 removal of bridges (sta. 109+00; 28'x 152') 1      EACH 76,000.00 76,000.00 40,000.00 40,000.00        
202-02-A-02 removal of bridges (sta. 205+99.40; 28'x 190') 1      EACH 95,000.00 95,000.00 40,000.00 40,000.00        
202-02-A-03 removal of bridges (sta. 309+00.00; 28'x 76') 1      EACH 38,000.00 38,000.00 15,000.00 15,000.00        
202-02-A-04 removal of bridges (sta. 608+14.00; 27.5'x 114') 1      EACH 57,000.00 57,000.00 20,000.00 20,000.00        
202-02-A-05 removal of bridges (sta. 709+00.00; 27.5'x 114') 1      EACH 57,000.00 57,000.00 20,000.00 20,000.00        
202-02-A-06 removal of bridges (sta. 807+92.00; 24.3'x 57') 1      EACH 28,500.00 28,500.00 15,000.00 15,000.00        
202-02-G removal of surfacing & stabilized base 13,729.6    SQYD 7.00 96,107.20 6.25 85,810.00        
203-01 general excavation 63,387      CUYD 8.00 507,096.00 7.50 475,402.50        
203-02 drainage excavation 80,340      CUYD 10.50 843,570.00 8.75 702,975.00        
203-03 embankment 22,583      CUYD 17.85 403,106.55 12.00 270,996.00        
204-02 temporary hay or straw bales 35      EACH 15.00 525.00 15.00 525.00        
204-03 temporary slope drains 1,500      LNFT 15.00 22,500.00 35.00 52,500.00        
204-05-A temporary sediment check dams (hay) 882      EACH 127.00 112,014.00 120.00 105,840.00        
204-05-B temporary sediment check dams (stone) 16      EACH 550.00 8,800.00 840.00 13,440.00        
204-06 temporary silt fencing 14,788      LNFT 2.00 29,576.00 2.50 36,970.00        
302-02-B class ii base course (6" thick) 2,517.7    SQYD 36.00 90,637.20 24.00 60,424.80        
302-02-F class ii base course (12" thick) 14,168.2    SQYD 55.00 779,251.00 21.00 297,532.20        
304-01 lime 200.83   TON 145.00 29,120.35 200.00 40,166.00        
304-04-D lime treatment (type d) (12" thick) 14,168      SQYD 2.00 28,336.00 3.50 49,588.00        
305-01-D subgrade layer (12" thick) 13,749      SQYD 10.00 137,490.00 15.00 206,235.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
337      CUYD 120.00 40,440.00 75.00 25,275.00        
402-01 traffic maintenance aggregate (vehicular measurement) 100.0    CUYD 120.00 12,000.00 75.00 7,500.00        
502-01 superpave asphaltic concrete 3,219.4    TON 165.00 531,201.00 165.00 531,201.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
54.2    TON 165.00 8,943.00 275.00 14,905.00        
701-01-K cross drain pipe (30" rcp/pcp) 100      LNFT 112.00 11,200.00 230.00 23,000.00        
701-03-G storm drain pipe (18" rcp/pcp) 194      LNFT 86.50 16,781.00 145.00 28,130.00        
701-03-I storm drain pipe (24" rcp/pcp) 80      LNFT 95.00 7,600.00 135.00 10,800.00        
701-03-K storm drain pipe (30" rcp/pcp) 20      LNFT 115.00 2,300.00 260.00 5,200.00        
701-05-I side drain pipe (24") 306      LNFT 70.00 21,420.00 120.00 36,720.00        
701-05-I-01 side drain pipe (24") (erosion) 138      LNFT 70.00 9,660.00 130.00 17,940.00        
701-05-K side drain pipe (30") 24      LNFT 83.00 1,992.00 140.00 3,360.00        
701-05-K-01 side drain pipe (30") (erosion) 36      LNFT 83.00 2,988.00 140.00 5,040.00        
701-06-B side drain pipe arch (18" equiv.) 38      LNFT 110.00 4,180.00 115.00 4,370.00        
701-06-E-01 side drain pipe arch (30" equiv.) (erosion) 72      LNFT 112.00 8,064.00 120.00 8,640.00        
701-06-F-01 side drain pipe arch (36" equiv.) (erosion) 156      LNFT 145.00 22,620.00 150.00 23,400.00        
701-06-I-01 side drain pipe arch (54" equiv.) (erosion) 120      LNFT 215.00 25,800.00 290.00 34,800.00        
701-11-H reinforced concrete pipe arch (extension)(48" equiv.) 4      LNFT 500.00 2,000.00 500.00 2,000.00        
702-03-A catch basins (cb-01) 4      EACH 3,500.00 14,000.00 3,000.00 12,000.00        
702-03-B catch basins (cb-02) 1      EACH 6,000.00 6,000.00 5,000.00 5,000.00        
702-08-A side drain safety end (type 1) 4      EACH 3,500.00 14,000.00 4,000.00 16,000.00        
704-03 blocked out guard rail 1,264.9    LNFT 24.50 30,990.05 35.00 44,271.50        
704-08-B guard rail transitions (double thrie beam) 600.0    LNFT 70.00 42,000.00 70.00 42,000.00        
704-11-A guard rail end treatment (flared) 23      EACH 2,400.00 55,200.00 2,500.00 57,500.00        
706-03-A incidental concrete paving (4" thick) 60.0    SQYD 75.00 4,500.00 130.00 7,800.00        
708-01 right-of-way monument 87      EACH 200.00 17,400.00 375.00 32,625.00        
708-02 right-of-way monument witness post 87      EACH 200.00 17,400.00 375.00 32,625.00        
711-01-C riprap (30 lb, 6"thick) 271      SQYD 85.00 23,035.00 45.00 12,195.00        
711-01-D riprap (55 lb, 24"thick) 13,100      SQYD 85.00 1,113,500.00 85.00 1,113,500.00        
713-01 temporary signs & barricades lump      LUMP 445,000.00 445,000.00 400,000.00 400,000.00        
713-04-A temporary pavement markings (solid line)(4" width) 6.766  MILE 2,000.00 13,532.00 690.00 4,668.54        
713-07 temporary precast concrete barrier (contractor
furnished)
1,560      EACH 300.00 468,000.00 980.00 1,528,800.00        
713-08 temporary precast concrete barrier (department
furnished)
500      EACH 100.00 50,000.00 325.00 162,500.00        
716-01-A mulch (vegetative) 0.5    TON 2,000.00 1,000.00 1,800.00 900.00        
717-01 seeding 889      LB 11.50 10,223.50 13.00 11,557.00        
718-01 fertilizer 20,734      LB 0.60 12,440.40 0.75 15,550.50        
720-01-A erosion control system, slope protection (type a) 2,123      SQYD 1.55 3,290.65 1.60 3,396.80        
720-01-C erosion control system, flexible channel liner (type c) 502      SQYD 2.10 1,054.20 2.20 1,104.40        
720-01-D erosion control system, flexible channel liner (type d) 5,689      SQYD 2.10 11,946.90 2.20 12,515.80        
720-01-E erosion control system, flexible channel liner (type e) 2,639      SQYD 2.60 6,861.40 2.90 7,653.10        
720-01-F erosion control system, flexible channel liner (type f) 966      SQYD 2.60 2,511.60 2.90 2,801.40        
722-01 project site laboratory 3      EACH 5,000.00 15,000.00 65,000.00 195,000.00        
725-01 temporary detour roads 15,574.9    SQYD 100.00 1,557,490.00 90.00 1,401,741.00        
726-01 bedding material 99.7    CUYD 120.00 11,964.00 125.00 12,462.50        
727-01 mobilization lump      LUMP 2,250,000.00 2,250,000.00 2,300,000.00 2,300,000.00        
729-16-C object marker assembly (type 3) 24      EACH 100.00 2,400.00 90.00 2,160.00        
731-01 nonreflectorized raised pavement markers 454      EACH 14.50 6,583.00 15.00 6,810.00        
731-02 reflectorized raised pavement markers 234      EACH 8.00 1,872.00 7.00 1,638.00        
732-02-A plastic pavement striping (solid line) (4" width) 6.940  MILE 4,000.00 27,760.00 3,500.00 24,290.00        
740-01 construction layout lump      LUMP 275,000.00 275,000.00 400,000.00 400,000.00        
740-02 utility oversight and coordination lump      LUMP 180,000.00 180,000.00 25,000.00 25,000.00        
803-03 steel sheet pile wall 1,500      SQFT 55.00 82,500.00 55.00 82,500.00        
804-01-C precast concrete piles (16") 3,248      LNFT 80.00 259,840.00 70.00 227,360.00        
804-01-D precast concrete piles (18") 8,634      LNFT 110.00 949,740.00 74.00 638,916.00        
804-01-F precast concrete piles (24") 8,470      LNFT 140.00 1,185,800.00 120.00 1,016,400.00        
804-05 precast concrete test piles 5      EACH 30,000.00 150,000.00 35,000.00 175,000.00        
804-09 loading test piles 5      EACH 10,000.00 50,000.00 25,000.00 125,000.00        
804-10 reloading test piles 5      EACH 1,000.00 5,000.00 5,000.00 25,000.00        
804-11 redriving test piles 5      EACH 1,000.00 5,000.00 5,000.00 25,000.00        
805-01-C class a concrete (retaining walls) 31.52   CUYD 1,550.00 48,856.00 1,800.00 56,736.00        
805-01-F class a concrete (bents) 869.94   CUYD 1,550.00 1,348,407.00 1,700.00 1,478,898.00        
805-03 class aa concrete 2,308.09   CUYD 1,100.00 2,538,899.00 1,500.00 3,462,135.00        
805-08-H precast-prestressed concrete girders (type quad beam) 7,742.0    LNFT 120.00 929,040.00 100.00 774,200.00        
806-01 deformed reinforcing steel 695,242      LB 1.50 1,042,863.00 1.10 764,766.20        
807-08 structural metalwork lump      LUMP 75,000.00 75,000.00 80,000.00 80,000.00        
810-01 concrete railing (barrier) 2,520.00   LNFT 62.00 156,240.00 80.00 201,600.00        
813-01 concrete approach slabs 3,008.84   SQYD 250.00 752,210.00 315.00 947,784.60        
S-001 temporary construction sheeting 36,933      SQFT 40.00 1,477,320.00 25.00 923,325.00        
S-101 special guard rail anchor section 1      EACH 5,000.00 5,000.00 2,000.00 2,000.00        
S-102 impact attenuators (construction zone) 12      EACH 20,000.00 240,000.00 20,000.00 240,000.00        
                       
 ITEM TOTAL (CONSTRUCTION BID)       23,012,488.00   23,118,371.84        
 NUMBER OF DAYS BID AT $1,000 PER DAY.       870,000.00   875,000.00        
 TOTAL BID       23,882,488.00   23,993,371.84        