| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-A-01 |
removal of bridges (sta. 50+05, 24'x10' timber cattle
underpass) |
1   |
EACH |
5,000.00 |
5,000.00 |
|
|
|
|
|
|
| 202-02-A-02 |
removal of bridges (sta. 70+13,24'x10' timber cattle
underpass) |
1   |
EACH |
5,000.00 |
5,000.00 |
|
|
|
|
|
|
| 202-02-H |
removal of guard rail
|
1,192   |
LNFT |
7.00 |
8,344.00 |
|
|
|
|
|
|
| 202-02-I |
removal of abandoned utility pipe
|
2   |
EACH |
500.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-J |
removal of asphaltic surfacing from bridges
|
1,182   |
SQYD |
11.25 |
13,297.50 |
|
|
|
|
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
16,500.00 |
16,500.00 |
|
|
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
5,000   |
CUYD |
12.50 |
62,500.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
150   |
CUYD |
1.00 |
150.00 |
|
|
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
72.0 |
CUYD |
1.00 |
72.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
11,211.6 |
TON |
111.00 |
1,244,487.60 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
275.0 |
TON |
208.75 |
57,406.25 |
|
|
|
|
|
|
| 510-01-A |
pavement patching (6" minimum thickness)
|
2,000   |
SQYD |
56.25 |
112,500.00 |
|
|
|
|
|
|
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
60   |
LNFT |
250.00 |
15,000.00 |
|
|
|
|
|
|
| 701-01-S |
cross drain pipe (72" rcp/pcp)
|
60   |
LNFT |
620.00 |
37,200.00 |
|
|
|
|
|
|
| 701-08 |
relaying pipe
|
28   |
LNFT |
150.00 |
4,200.00 |
|
|
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
12   |
LNFT |
200.00 |
2,400.00 |
|
|
|
|
|
|
| 701-10-M |
reinforced concrete pipe (extension)(36")
|
8   |
LNFT |
250.00 |
2,000.00 |
|
|
|
|
|
|
| 701-15 |
concrete collar
|
4   |
EACH |
750.00 |
3,000.00 |
|
|
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
200.0 |
LNFT |
50.00 |
10,000.00 |
|
|
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
760.0 |
LNFT |
60.00 |
45,600.00 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
200.0 |
LNFT |
22.00 |
4,400.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
8   |
EACH |
2,100.00 |
16,800.00 |
|
|
|
|
|
|
| 705-01 |
barbed wire fence
|
100   |
LNFT |
10.00 |
1,000.00 |
|
|
|
|
|
|
| 712-04 |
flexible revetment
|
150   |
SQYD |
80.00 |
12,000.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
65,500.00 |
65,500.00 |
|
|
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
4.657 |
MILE |
400.00 |
1,862.80 |
|
|
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
1.600 |
MILE |
1.00 |
1.60 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
17.876 |
MILE |
1.00 |
17.88 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
18.1 |
TON |
600.00 |
10,860.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
65,500.00 |
65,500.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
7   |
EACH |
65.00 |
455.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
75.00 |
600.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
589   |
EACH |
4.50 |
2,650.50 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
15.140 |
MILE |
2,500.00 |
37,850.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.600 |
MILE |
600.00 |
960.00 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
8   |
EACH |
1.00 |
8.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
4   |
EACH |
150.00 |
600.00 |
|
|
|
|
|
|
| 735-03 |
mailbox supports (double)
|
2   |
EACH |
200.00 |
400.00 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
10.36 |
ACRE |
1,200.00 |
12,432.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
25,000.00 |
25,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,904,555.13 |
|
|
|
|
|
|
|