| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BESSETTE DEVELOPMENT CORP. |
- 2 - PRAIRIE CONTRACTORS INC. |
- 3 - R. E. HEIDT CONSTRUCTION CO., INC. |
- 4 - GILCHRIST CONSTRUCTION CO. LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
564   |
SQYD |
5.75 |
3,243.00 |
7.00 |
3,948.00 |
15.75 |
8,883.00 |
20.00 |
11,280.00 |
| 202-02-E |
removal of concrete curbs
|
678.0 |
LNFT |
3.75 |
2,542.50 |
12.00 |
8,136.00 |
10.50 |
7,119.00 |
15.00 |
10,170.00 |
| 203-05 |
excavation and embankment
|
lump |
LUMP |
2,000.00 |
2,000.00 |
3,000.00 |
3,000.00 |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
| 502-01 |
superpave asphaltic concrete
|
2,304.0 |
TON |
107.50 |
247,680.00 |
105.00 |
241,920.00 |
108.00 |
248,832.00 |
145.00 |
334,080.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
103.3 |
TON |
175.00 |
18,077.50 |
200.00 |
20,660.00 |
276.00 |
28,510.80 |
220.00 |
22,726.00 |
| 509-01 |
cold planing asphaltic pavement
|
17,117   |
SQYD |
1.55 |
26,531.35 |
1.50 |
25,675.50 |
0.71 |
12,153.07 |
3.50 |
59,909.50 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 476   |
CUYD |
1.00 |
- 476.00 |
0.01 |
- 4.76 |
13.31 |
- 6,335.56 |
2.00 |
- 952.00 |
| 510-01-B |
pavement patching (12" minimum thickness)
|
588   |
SQYD |
78.50 |
46,158.00 |
125.00 |
73,500.00 |
120.00 |
70,560.00 |
177.00 |
104,076.00 |
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
1,302   |
LNFT |
2.75 |
3,580.50 |
5.50 |
7,161.00 |
2.40 |
3,124.80 |
3.50 |
4,557.00 |
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
1,107   |
LNFT |
3.00 |
3,321.00 |
5.50 |
6,088.50 |
2.63 |
2,911.41 |
4.00 |
4,428.00 |
| 702-04-A |
adjusting manholes
|
5   |
EACH |
495.00 |
2,475.00 |
750.00 |
3,750.00 |
300.00 |
1,500.00 |
1,600.00 |
8,000.00 |
| 702-04-B |
adjusting catch basins
|
7   |
EACH |
3,000.00 |
21,000.00 |
4,000.00 |
28,000.00 |
2,940.00 |
20,580.00 |
2,400.00 |
16,800.00 |
| 705-09 |
rebuilt fence
|
150   |
LNFT |
18.00 |
2,700.00 |
20.00 |
3,000.00 |
90.00 |
13,500.00 |
35.00 |
5,250.00 |
| 706-01-C |
concrete walk (6" thick)
|
97.2 |
SQYD |
61.00 |
5,929.20 |
70.00 |
6,804.00 |
89.25 |
8,675.10 |
150.00 |
14,580.00 |
| 706-02-C |
concrete drive (6" thick)
|
300.0 |
SQYD |
70.75 |
21,225.00 |
80.00 |
24,000.00 |
78.75 |
23,625.00 |
100.00 |
30,000.00 |
| 706-04 |
handicapped curb ramps
|
27.0 |
EACH |
1,115.00 |
30,105.00 |
1,000.00 |
27,000.00 |
1,312.50 |
35,437.50 |
550.00 |
14,850.00 |
| 707-01 |
concrete curb
|
420.0 |
LNFT |
16.00 |
6,720.00 |
12.00 |
5,040.00 |
36.75 |
15,435.00 |
45.00 |
18,900.00 |
| 707-03 |
combination concrete curb & gutter
|
574.2 |
LNFT |
26.00 |
14,929.20 |
40.00 |
22,968.00 |
52.50 |
30,145.50 |
49.00 |
28,135.80 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
4,100.00 |
4,100.00 |
15,000.00 |
15,000.00 |
4,077.15 |
4,077.15 |
125,000.00 |
125,000.00 |
| 713-02-C |
temporary pavement markings (8" width)
|
650   |
LNFT |
0.45 |
292.50 |
0.01 |
6.50 |
0.42 |
273.00 |
3.00 |
1,950.00 |
| 713-02-D |
temporary pavement markings (12" width)
|
24   |
LNFT |
0.65 |
15.60 |
0.01 |
0.24 |
0.63 |
15.12 |
5.00 |
120.00 |
| 713-02-E |
temporary pavement markings (24" width)
|
1,564   |
LNFT |
1.25 |
1,955.00 |
0.01 |
15.64 |
1.26 |
1,970.64 |
3.50 |
5,474.00 |
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
3.100 |
MILE |
325.00 |
1,007.50 |
400.00 |
1,240.00 |
930.00 |
2,883.00 |
400.00 |
1,240.00 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
0.576 |
MILE |
325.00 |
187.20 |
0.01 |
0.01 |
315.00 |
181.44 |
600.00 |
345.60 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
5.500 |
MILE |
625.00 |
3,437.50 |
0.01 |
0.06 |
630.00 |
3,465.00 |
1,000.00 |
5,500.00 |
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
16   |
EACH |
52.75 |
844.00 |
0.01 |
0.16 |
52.50 |
840.00 |
65.00 |
1,040.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
13,000.00 |
13,000.00 |
30,000.00 |
30,000.00 |
71,400.00 |
71,400.00 |
95,000.00 |
95,000.00 |
| 731-02 |
reflectorized raised pavement markers
|
548   |
EACH |
4.75 |
2,603.00 |
5.00 |
2,740.00 |
4.73 |
2,592.04 |
6.40 |
3,507.20 |
| 732-01-C |
plastic pavement striping (8" width)
|
325   |
LNFT |
1.00 |
325.00 |
1.00 |
325.00 |
1.05 |
341.25 |
1.27 |
412.75 |
| 732-01-D |
plastic pavement striping (12" width)
|
12   |
LNFT |
1.50 |
18.00 |
2.00 |
24.00 |
1.58 |
18.96 |
3.70 |
44.40 |
| 732-01-E |
plastic pavement striping (24" width)
|
782   |
LNFT |
3.25 |
2,541.50 |
3.00 |
2,346.00 |
3.15 |
2,463.30 |
4.50 |
3,519.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
2.750 |
MILE |
2,625.00 |
7,218.75 |
3,000.00 |
8,250.00 |
2,625.00 |
7,218.75 |
3,500.00 |
9,625.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.288 |
MILE |
740.00 |
213.12 |
700.00 |
201.60 |
735.00 |
211.68 |
950.00 |
273.60 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
8   |
EACH |
150.00 |
1,200.00 |
150.00 |
1,200.00 |
157.50 |
1,260.00 |
230.00 |
1,840.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
1,200.00 |
1,200.00 |
100.00 |
100.00 |
3,362.00 |
3,362.00 |
25,000.00 |
25,000.00 |
| 741-11 |
adjusting water valve and meter box
|
4   |
EACH |
580.00 |
2,320.00 |
400.00 |
1,600.00 |
840.00 |
3,360.00 |
1,200.00 |
4,800.00 |
| S-927 |
sawcuts in asphaltic concrete lifts
|
2,409   |
LNFT |
1.50 |
3,613.50 |
4.00 |
9,636.00 |
1.32 |
3,179.88 |
2.00 |
4,818.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
503,833.42 |
|
583,331.45 |
|
643,769.83 |
|
991,299.85 |
|