LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: 081-02-0015
Parish: St. Landry
Routes: LA 103
Description: 0.73 MI NORTH OF N. JCT LA 31 - JCT US 190
Type Const: COLD PLANING, ASPHALTIC PAVEMENT, IN-PLACE CEMENT TREATED BASE COURSE, AGGREGATE SURFACE COURSE, SUPERPAVE ASPHALTIC CONCRETE WEARING COURSE, and RELATED WORK
Estimated Construction Cost: $3,470,841.12


RankLicenseBidderConstruction Bid
1 08815 W. E. Mcdonald & Son, LLC. $3,696,545.26
2 34356 Prairie Contractors Inc. $3,868,315.86
3 04089 H & S Construction Co., Inc. $3,968,222.13
4 12312 Gilchrist Construction Co. LLC $4,203,696.05
5 33663 Glenn Lege Construction Inc $4,600,610.86


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
W. E. Mcdonald & Son, LLC.
- 2 -
Prairie Contractors Inc.
- 3 -
H & S Construction Co., Inc.
- 4 -
Gilchrist Construction Co. LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 202-02-06100 Removal of Concrete Walks and Drives 135      SQYD 1.00 135.00 5.00 675.00 23.00 3,105.00 15.00 2,025.00
0002 202-02-32100 Removal of Pipe (Cross Drain) 24" to 42" RCP 98      LNFT 5.00 490.00 10.00 980.00 5.51 539.98 10.00 980.00
0003 203-07-00100 Borrow (Vehicular Measurement) 1,200      CUYD 5.00 6,000.00 9.50 11,400.00 10.00 12,000.00 15.00 18,000.00
0004 203-07-00200 Borrow (Vehicular Measurement) (Selected Soils) 1,200      CUYD 5.00 6,000.00 9.50 11,400.00 10.00 12,000.00 15.00 18,000.00
0005 204-05-00100 Temporary Sediment Check Dams (Hay) 65      EACH 50.00 3,250.00 80.00 5,200.00 150.00 9,750.00 245.00 15,925.00
0006 303-02-00100 Removal of Existing Patches 400      SQYD 10.00 4,000.00 15.00 6,000.00 25.00 10,000.00 5.00 2,000.00
0007 305-01-04020 Subgrade Layer (12" Thick) (Treated) 93,600      SQYD 8.40 786,240.00 8.70 814,320.00 7.00 655,200.00 12.00 1,123,200.00
0008 308-01-00100 In-Place Cement Treated Base Course (12" Thick) 93,600      SQYD 9.52 891,072.00 9.65 903,240.00 11.50 1,076,400.00 9.00 842,400.00
0009 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 200      CUYD 25.00 5,000.00 56.00 11,200.00 30.00 6,000.00 65.00 13,000.00
0010 502-01-00100 Superpave Asphaltic Concrete 17,215.6    TON 75.40 1,298,056.24 75.40 1,298,056.24 80.00 1,377,248.00 69.00 1,187,876.40
0011 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 730      TON 50.00 36,500.00 50.00 36,500.00 140.00 102,200.00 125.00 91,250.00
0012 507-01-00100 Asphaltic Material (CRS-2P Emulsion) 60,813      GAL 3.15 191,560.95 3.00 182,439.00 3.25 197,642.25 3.20 194,601.60
0013 507-02-00200 Aggregate (S2) 89,431      SQYD 1.08 96,585.48 1.00 89,431.00 1.10 98,374.10 1.10 98,374.10
0014 507-02-00300 Aggregate (S3) 89,431      SQYD 0.87 77,804.97 0.90 80,487.90 0.90 80,487.90 0.85 76,016.35
0015 509-01-00100 Cold Planing Asphaltic Pavement 69,300      SQYD 1.60 110,880.00 1.60 110,880.00 1.35 93,555.00 1.00 69,300.00
0016 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -3,248      CUYD 0.01 -32.48 0.01 -32.48 0.01 -32.48 1.00 -3,248.00
0017 701-01-01000 Cross Drain Pipe (24" RCP/PP) 52      LNFT 125.00 6,500.00 70.00 3,640.00 75.00 3,900.00 125.00 6,500.00
0018 701-01-01060 Cross Drain Pipe (42" RCP/PP) 50      LNFT 145.00 7,250.00 160.00 8,000.00 105.00 5,250.00 165.00 8,250.00
0019 701-08-00100 Relaying Pipe 8      LNFT 300.00 2,400.00 110.00 880.00 165.00 1,320.00 85.00 680.00
0020 701-10-01060 Reinforced Concrete Pipe (Extension) (24") 24      LNFT 300.00 7,200.00 70.00 1,680.00 450.00 10,800.00 125.00 3,000.00
0021 701-15-00100 Concrete Collar 4      EACH 1,000.00 4,000.00 600.00 2,400.00 550.00 2,200.00 680.00 2,720.00
0022 706-02-00100 Concrete Drive (4" Thick) 30      SQYD 125.00 3,750.00 65.00 1,950.00 150.00 4,500.00 87.00 2,610.00
0023 712-02-00100 Sacked Concrete Revetment 100      SQYD 100.00 10,000.00 75.00 7,500.00 125.00 12,500.00 90.00 9,000.00
0024 713-01-00100 Temporary Signs and Barricades 1      LUMP 8,200.00 8,200.00 100,000.00 100,000.00 15,000.00 15,000.00 20,000.00 20,000.00
0025 713-02-00500 Temporary Pavement Markings (24" Width) 52      LNFT 2.00 104.00 0.01 0.52 5.00 260.00 2.20 114.40
0026 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 11.726  MILE 400.00 4,690.40 400.00 4,690.40 386.00 4,526.24 300.00 3,517.80
0027 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 7.768  MILE 250.00 1,942.00 0.01 0.08 552.00 4,287.94 250.00 1,942.00
0028 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 35.644  MILE 350.00 12,475.40 0.01 0.36 606.00 21,600.26 100.00 3,564.40
0029 713-05-00400 Temporary Pavement Legends & Symbols (RR Crossing) 4      EACH 75.00 300.00 0.01 0.04 88.20 352.80 85.00 340.00
0030 713-06-00200 Temporary Reflectorized Raised Pavement Markers (Tabs) 1,550      EACH 1.50 2,325.00 2.50 3,875.00 1.50 2,325.00 2.10 3,255.00
0031 722-02-00100 Project Site Laboratory (Equipped) 1      EACH 1,000.00 1,000.00 3,000.00 3,000.00 7,000.00 7,000.00 6,000.00 6,000.00
0032 726-01-00100 Bedding Material 20      CUYD 85.00 1,700.00 100.00 2,000.00 85.00 1,700.00 100.00 2,000.00
0033 727-01-00100 Mobilization 1      LUMP 40,000.00 40,000.00 100,000.00 100,000.00 55,000.00 55,000.00 290,000.00 290,000.00
0034 729-16-00200 Object Marker Assembly (Type 2) 46      EACH 75.00 3,450.00 85.00 3,910.00 59.00 2,714.00 55.00 2,530.00
0035 731-02-00100 Reflectorized Raised Pavement Markers 775      EACH 4.50 3,487.50 5.00 3,875.00 5.78 4,479.50 6.00 4,650.00
0036 732-01-02080 Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 26      LNFT 26.00 676.00 10.00 260.00 5.51 143.26 35.00 910.00
0037 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 17.822  MILE 2,200.00 39,208.40 2,300.00 40,990.60 2,770.00 49,366.94 2,700.00 48,119.40
0038 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 3.884  MILE 1,100.00 4,272.40 800.00 3,107.20 933.43 3,625.44 1,400.00 5,437.60
0039 732-04-18000 Plastic Pavement Legends and Symbols (RR Crossing) 2      EACH 650.00 1,300.00 500.00 1,000.00 441.00 882.00 1,100.00 2,200.00
0040 735-01-00100 Mailboxes 84      EACH 1.00 84.00 10.00 840.00 1.00 84.00 10.00 840.00
0041 735-02-00100 Mailbox Supports (Single) 57      EACH 114.00 6,498.00 120.00 6,840.00 120.00 6,840.00 115.00 6,555.00
0042 735-03-00100 Mailbox Supports (Double) 7      EACH 170.00 1,190.00 200.00 1,400.00 185.00 1,295.00 140.00 980.00
0043 735-04-00100 Mailbox Supports (Multiple) 4      EACH 300.00 1,200.00 350.00 1,400.00 375.00 1,500.00 220.00 880.00
0044 740-01-00100 Construction Layout 1      LUMP 5,000.00 5,000.00 100.00 100.00 7,500.00 7,500.00 16,000.00 16,000.00
0045 NS-600-00220 Saw Cutting Portland Cement Concrete Pavement 1,400      INLF 2.00 2,800.00 2.00 2,800.00 2.00 2,800.00 1.00 1,400.00
                         
    CONTRACTOR TOTAL       3,696,545.26   3,868,315.86   3,968,222.13   4,203,696.05



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 5 -
Glenn Lege Construction Inc
Unit PriceTotal
Amount
0001 202-02-06100 Removal of Concrete Walks and Drives 135      SQYD 12.50 1,687.50
0002 202-02-32100 Removal of Pipe (Cross Drain) 24" to 42" RCP 98      LNFT 30.00 2,940.00
0003 203-07-00100 Borrow (Vehicular Measurement) 1,200      CUYD 15.00 18,000.00
0004 203-07-00200 Borrow (Vehicular Measurement) (Selected Soils) 1,200      CUYD 20.00 24,000.00
0005 204-05-00100 Temporary Sediment Check Dams (Hay) 65      EACH 210.00 13,650.00
0006 303-02-00100 Removal of Existing Patches 400      SQYD 14.50 5,800.00
0007 305-01-04020 Subgrade Layer (12" Thick) (Treated) 93,600      SQYD 10.30 964,080.00
0008 308-01-00100 In-Place Cement Treated Base Course (12" Thick) 93,600      SQYD 13.30 1,244,880.00
0009 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 200      CUYD 35.00 7,000.00
0010 502-01-00100 Superpave Asphaltic Concrete 17,215.6    TON 82.00 1,411,679.20
0011 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 730      TON 110.00 80,300.00
0012 507-01-00100 Asphaltic Material (CRS-2P Emulsion) 60,813      GAL 3.40 206,764.20
0013 507-02-00200 Aggregate (S2) 89,431      SQYD 1.20 107,317.20
0014 507-02-00300 Aggregate (S3) 89,431      SQYD 1.00 89,431.00
0015 509-01-00100 Cold Planing Asphaltic Pavement 69,300      SQYD 1.75 121,275.00
0016 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -3,248      CUYD 1.00 -3,248.00
0017 701-01-01000 Cross Drain Pipe (24" RCP/PP) 52      LNFT 120.00 6,240.00
0018 701-01-01060 Cross Drain Pipe (42" RCP/PP) 50      LNFT 350.00 17,500.00
0019 701-08-00100 Relaying Pipe 8      LNFT 60.00 480.00
0020 701-10-01060 Reinforced Concrete Pipe (Extension) (24") 24      LNFT 100.00 2,400.00
0021 701-15-00100 Concrete Collar 4      EACH 800.00 3,200.00
0022 706-02-00100 Concrete Drive (4" Thick) 30      SQYD 65.00 1,950.00
0023 712-02-00100 Sacked Concrete Revetment 100      SQYD 100.00 10,000.00
0024 713-01-00100 Temporary Signs and Barricades 1      LUMP 15,000.00 15,000.00
0025 713-02-00500 Temporary Pavement Markings (24" Width) 52      LNFT 1.00 52.00
0026 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 11.726  MILE 650.00 7,621.90
0027 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 7.768  MILE 580.00 4,505.44
0028 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 35.644  MILE 640.00 22,812.16
0029 713-05-00400 Temporary Pavement Legends & Symbols (RR Crossing) 4      EACH 100.00 400.00
0030 713-06-00200 Temporary Reflectorized Raised Pavement Markers (Tabs) 1,550      EACH 2.20 3,410.00
0031 722-02-00100 Project Site Laboratory (Equipped) 1      EACH 8,000.00 8,000.00
0032 726-01-00100 Bedding Material 20      CUYD 100.00 2,000.00
0033 727-01-00100 Mobilization 1      LUMP 107,670.00 107,670.00
0034 729-16-00200 Object Marker Assembly (Type 2) 46      EACH 60.00 2,760.00
0035 731-02-00100 Reflectorized Raised Pavement Markers 775      EACH 6.10 4,727.50
0036 732-01-02080 Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 26      LNFT 6.00 156.00
0037 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 17.822  MILE 2,900.00 51,683.80
0038 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 3.884  MILE 990.00 3,845.16
0039 732-04-18000 Plastic Pavement Legends and Symbols (RR Crossing) 2      EACH 465.00 930.00
0040 735-01-00100 Mailboxes 84      EACH 1.20 100.80
0041 735-02-00100 Mailbox Supports (Single) 57      EACH 120.00 6,840.00
0042 735-03-00100 Mailbox Supports (Double) 7      EACH 150.00 1,050.00
0043 735-04-00100 Mailbox Supports (Multiple) 4      EACH 235.00 940.00
0044 740-01-00100 Construction Layout 1      LUMP 17,100.00 17,100.00
0045 NS-600-00220 Saw Cutting Portland Cement Concrete Pavement 1,400      INLF 1.20 1,680.00
             
    CONTRACTOR TOTAL       4,600,610.86