Bid Tabs Error processing SSI file
Bid Tabulations Error processing SSI file
February 06, 2014 Error processing SSI file

Letting of 9/24/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 737-99-0545
Parish: ST TAMMANY, TANGIPAHOA
Routes: I-12, I-55, I-10, US 90, I-59
Description: STATEWIDE ITS DESIGN AND IMPLEMENTATION, NORTHSHORE PHASE 2
Type Const: fiber optic cable installation, interconnect, network instal lation, cctv, and related
work.
Estimated Construction Cost: $8,554,284.00
Maximum Number of Days Allowed for Construction: 310
Calculated Daily User Cost: $3,000.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Total Bid
1 07764 GRADY CRAWFORD CONST. CO., INC. $7,624,975.18 180 $8,164,975.18
2 27043 JACK B. HARPER CONTRACTOR, INC. $8,625,000.00 290 $9,495,000.00
3 32426 HYPOWER INC. $9,399,999.99 310 $10,329,999.99
4 01165 ERNEST P. BREAUX ELECTRICAL, INC. $9,449,673.90 310 $10,379,673.90
 
Item Number Item Description Quantity Unit of Measure - 1 -
GRADY CRAWFORD CONST. CO., INC.
- 2 -
JACK B. HARPER CONTRACTOR, INC.
- 3 -
HYPOWER INC.
- 4 -
ERNEST P. BREAUX ELECTRICAL, INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 59,500.00 59,500.00 15,000.00 15,000.00 9,000.00 9,000.00 26,000.00 26,000.00
705-03-A single swinging walk gates (chain link) 2      EACH 600.00 1,200.00 446.25 892.50 600.00 1,200.00 760.00 1,520.00
705-05-A double swinging driveway gates (chain link) 2      DBGT 850.00 1,700.00 939.75 1,879.50 1,200.00 2,400.00 1,314.00 2,628.00
705-06-C chain link fence ( 6 foot height) 216      LNFT 32.50 7,020.00 32.75 7,074.00 18.00 3,888.00 30.75 6,642.00
706-02-C concrete drive (6" thick) 106.1    SQYD 75.00 7,957.50 95.00 10,079.50 65.00 6,896.50 357.00 37,877.70
706-03-C incidental concrete paving (6" thick) 190.6    SQYD 95.00 18,107.00 64.00 12,198.40 65.00 12,389.00 292.00 55,655.20
706-03-D incidental concrete paving (4" thick)(mowing pad) 81.8    SQYD 55.00 4,499.00 52.50 4,294.50 45.00 3,681.00 221.00 18,077.80
713-01 temporary signs & barricades lump      LUMP 125,000.00 125,000.00 41,928.00 41,928.00 607,611.49 607,611.49 60,750.00 60,750.00
727-01 mobilization lump      LUMP 189,000.00 189,000.00 45,325.60 45,325.60 900,000.00 900,000.00 245,480.00 245,480.00
729-01 sign (type a) 24.0    SQFT 50.00 1,200.00 52.50 1,260.00 11.00 264.00 41.00 984.00
729-08-A mounting (2 1/2" post) 2      EACH 750.00 1,500.00 1,575.00 3,150.00 1,400.00 2,800.00 1,092.00 2,184.00
740-01 construction layout lump      LUMP 75,000.00 75,000.00 10,032.00 10,032.00 42,000.00 42,000.00 26,000.00 26,000.00
805-01-I class a concrete (building foundation) 9.60   CUYD 1,012.30 9,718.08 915.00 8,784.00 1,500.00 14,400.00 702.00 6,739.20
S-001-01 cctv camera site - type 1 17      EACH 45,320.00 770,440.00 46,098.00 783,666.00 43,000.00 731,000.00 73,426.00 1,248,242.00
S-001-02 cctv camera site - type 2 3      EACH 53,790.00 161,370.00 52,014.00 156,042.00 57,000.00 171,000.00 78,514.00 235,542.00
S-001-03 cctv camera site - type 4 1      EACH 70,210.00 70,210.00 63,852.00 63,852.00 60,000.00 60,000.00 88,688.00 88,688.00
S-001-04 electrical service - type 1 3      EACH 2,550.00 7,650.00 4,812.00 14,436.00 4,500.00 13,500.00 5,036.00 15,108.00
S-001-05 electrical service - type 2 14      EACH 2,000.00 28,000.00 4,452.00 62,328.00 4,600.00 64,400.00 4,837.00 67,718.00
S-001-06 electrical service - type 3 3      EACH 1,450.00 4,350.00 768.00 2,304.00 3,000.00 9,000.00 3,000.00 9,000.00
S-001-07 electrical service - type 4 1      EACH 1,395.00 1,395.00 486.00 486.00 2,000.00 2,000.00 3,000.00 3,000.00
S-002-01 dynamic message sign communications integration 12      EACH 4,280.00 51,360.00 7,704.00 92,448.00 10,000.00 120,000.00 7,690.00 92,280.00
S-002-02 dynamic message sign counter balanced ladder 10      EACH 16,966.71 169,667.10 13,356.00 133,560.00 11,000.00 110,000.00 13,743.00 137,430.00
S-003-01 its hub site #1 lump      LUMP 121,495.00 121,495.00 75,516.00 75,516.00 500,000.00 500,000.00 148,000.00 148,000.00
S-003-02 its hub site #2 lump      LUMP 121,495.00 121,495.00 75,516.00 75,516.00 500,000.00 500,000.00 148,000.00 148,000.00
S-004-01 48 strand optical fiber cable 180,000      LNFT 1.50 270,000.00 2.75 495,000.00 0.90 162,000.00 2.12 381,600.00
S-004-02 optical fiber drop cable 7,900      LNFT 1.06 8,374.00 2.00 15,800.00 0.20 1,580.00 2.23 17,617.00
S-004-03 optical fiber patch cord 100      EACH 52.50 5,250.00 95.00 9,500.00 40.00 4,000.00 120.00 12,000.00
S-004-04 communication outside plant - trench 160,000      LNFT 6.80 1,088,000.00 8.86 1,417,600.00 8.00 1,280,000.00 8.71 1,393,600.00
S-004-05 communication outside plant - bore 22,000      LNFT 46.45 1,021,900.00 68.17 1,499,740.00 40.00 880,000.00 50.59 1,112,980.00
S-004-06 electrical outside plant - trench 6,500      LNFT 8.75 56,875.00 6.76 43,940.00 7.00 45,500.00 7.38 47,970.00
S-004-07 electrical outside plant - bore 10,000      LNFT 11.25 112,500.00 67.93 679,300.00 13.00 130,000.00 51.62 516,200.00
S-004-08 splice closure 40      EACH 2,735.00 109,400.00 528.00 21,120.00 1,400.00 56,000.00 2,286.00 91,440.00
S-004-09 underground handhole / pullbox 160      EACH 2,620.00 419,200.00 2,136.00 341,760.00 1,100.00 176,000.00 4,100.00 656,000.00
S-004-10 electrical power conductors 51,000      LNFT 1.59 81,090.00 3.44 175,440.00 2.00 102,000.00 2.77 141,270.00
S-005-01 65' pole - foundation - one lowering device 11      EACH 58,000.00 638,000.00 56,184.00 618,024.00 50,000.00 550,000.00 57,560.00 633,160.00
S-005-02 65' pole - foundation - two lowering devices 3      EACH 65,282.00 195,846.00 63,384.00 190,152.00 60,000.00 180,000.00 62,945.00 188,835.00
S-005-03 85' pole - foundation - one lowering device 5      EACH 71,332.00 356,660.00 65,856.00 329,280.00 60,000.00 300,000.00 69,769.00 348,845.00
S-005-04 85' pole - foundation - four lowering devices 1      EACH 95,785.00 95,785.00 86,856.00 86,856.00 75,000.00 75,000.00 88,466.00 88,466.00
S-005-05 lowering tool, electric hoist assembly, and clutch
adapter
3      EACH 4,609.00 13,827.00 3,975.00 11,925.00 2,500.00 7,500.00 3,531.00 10,593.00
S-006-01 communication system integration lump      LUMP 150,000.00 150,000.00 101,544.00 101,544.00 100,000.00 100,000.00 106,000.00 106,000.00
S-006-02 gigabit ethernet multilayer switch 3      EACH 178,392.50 535,177.50 194,544.00 583,632.00 120,000.00 360,000.00 196,180.00 588,540.00
S-006-03 gigabit ethernet aggregation switch 3      EACH 47,190.00 141,570.00 52,434.00 157,302.00 70,000.00 210,000.00 52,698.00 158,094.00
S-007-01 cctv camera assembly 6      EACH 3,850.00 23,100.00 4,536.00 27,216.00 4,000.00 24,000.00 4,880.00 29,280.00
S-007-02 standalone digital video/data encoder 8      EACH 2,750.00 22,000.00 1,596.00 12,768.00 2,000.00 16,000.00 4,460.00 35,680.00
S-007-03 local ethernet switch 4      EACH 2,750.00 11,000.00 2,436.00 9,744.00 1,500.00 6,000.00 2,964.00 11,856.00
S-007-04 fiber optic drop cable 1,000      LNFT 2.30 2,300.00 2.00 2,000.00 135.00 135,000.00 0.43 430.00
S-007-05 fiber optic patch cord 15      EACH 115.00 1,725.00 95.00 1,425.00 30.00 450.00 106.00 1,590.00
S-007-06 fiber optic patch terminations 30      EACH 57.50 1,725.00 618.00 18,540.00 20.00 600.00 84.00 2,520.00
S-007-07 cctv camera lowering device 2      EACH 8,398.50 16,797.00 7,600.00 15,200.00 3,500.00 7,000.00 6,622.00 13,244.00
S-007-08 power surge suppressor 6      EACH 110.00 660.00 156.00 936.00 90.00 540.00 268.00 1,608.00
S-007-09 video surge suppressor 12      EACH 110.00 1,320.00 156.00 1,872.00 50.00 600.00 165.00 1,980.00
S-007-10 data surge suppressor 12      EACH 110.00 1,320.00 156.00 1,872.00 75.00 900.00 165.00 1,980.00
S-007-11 gigabit ethernet aggregation switch 1      EACH 47,190.00 47,190.00 51,276.00 51,276.00 70,000.00 70,000.00 51,775.00 51,775.00
S-007-12 cctv cabinet ac unit 1      EACH 3,850.00 3,850.00 5,076.00 5,076.00 600.00 600.00 3,785.00 3,785.00
S-007-13 cctv site ups 2      EACH 1,100.00 2,200.00 1,836.00 3,672.00 900.00 1,800.00 3,412.00 6,824.00
S-007-14 tools and test equipment lump      LUMP 16,500.00 16,500.00 30,000.00 30,000.00 8,000.00 8,000.00 10,560.00 10,560.00
S-007-15 training lump      LUMP 55,000.00 55,000.00 18,500.00 18,500.00 8,000.00 8,000.00 18,942.00 18,942.00
S-007-16 documentation lump      LUMP 71,500.00 71,500.00 6,936.00 6,936.00 8,500.00 8,500.00 14,334.00 14,334.00
S-008-01 extended maintenance lump      LUMP 38,500.00 38,500.00 18,000.00 18,000.00 605,000.00 605,000.00 66,530.00 66,530.00
                       
 ITEM TOTAL (CONSTRUCTION BID)       7,624,975.18   8,625,000.00   9,399,999.99   9,449,673.90
 NUMBER OF DAYS BID AT $3,000 PER DAY.       540,000.00   870,000.00   930,000.00   930,000.00
 TOTAL BID       8,164,975.18   9,495,000.00   10,329,999.99   10,379,673.90