| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - W. E. MCDONALD & SON, LLC. |
- 2 - GUINN BROTHERS, LLC. |
- 3 - BEN ALLEN, INC. |
- 4 - M & M MAINTENANCE OF LASALLE, LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
80,000.00 |
80,000.00 |
35,000.00 |
35,000.00 |
70,000.00 |
70,000.00 |
70,000.00 |
70,000.00 |
| 202-02-A-01 |
removal of bridge (sta. 15+01.32, 23.91' w x 79.17' l;
timber bridge) |
1   |
EACH |
10,000.00 |
10,000.00 |
11,000.00 |
11,000.00 |
4,000.00 |
4,000.00 |
5,000.00 |
5,000.00 |
| 202-02-A-02 |
removal of bridge (sta. 14+99.55, 26.37' w x 46.25' l;
timber bridge) |
1   |
EACH |
10,000.00 |
10,000.00 |
6,000.00 |
6,000.00 |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
| 202-02-A-03 |
removal of bridge (sta. 14+99.86, 22.76' w x 57.08' l;
timber bridge) |
1   |
EACH |
10,000.00 |
10,000.00 |
8,500.00 |
8,500.00 |
4,000.00 |
4,000.00 |
5,000.00 |
5,000.00 |
| 203-05 |
excavation and embankment
|
lump |
LUMP |
38,000.00 |
38,000.00 |
48,000.00 |
48,000.00 |
87,500.00 |
87,500.00 |
62,000.00 |
62,000.00 |
| 204-02 |
temporary hay or straw bales
|
24   |
EACH |
1.00 |
24.00 |
100.00 |
2,400.00 |
10.00 |
240.00 |
FREE |
FREE |
| 204-03 |
temporary slope drains
|
60   |
LNFT |
1.00 |
60.00 |
10.00 |
600.00 |
10.00 |
600.00 |
FREE |
FREE |
| 204-05-A |
temporary sediment check dams (hay)
|
10   |
EACH |
1.00 |
10.00 |
100.00 |
1,000.00 |
50.00 |
500.00 |
FREE |
FREE |
| 204-06 |
temporary silt fencing
|
1,940   |
LNFT |
2.00 |
3,880.00 |
4.00 |
7,760.00 |
2.50 |
4,850.00 |
FREE |
FREE |
| 302-01 |
class ii base course
|
538.8 |
CUYD |
91.00 |
49,030.80 |
90.00 |
48,492.00 |
125.00 |
67,350.00 |
90.00 |
48,492.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
39   |
CUYD |
50.00 |
1,950.00 |
100.00 |
3,900.00 |
125.00 |
4,875.00 |
90.00 |
3,510.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
120.0 |
CUYD |
25.00 |
3,000.00 |
100.00 |
12,000.00 |
125.00 |
15,000.00 |
90.00 |
10,800.00 |
| 502-01 |
superpave asphaltic concrete
|
435.2 |
TON |
200.00 |
87,040.00 |
315.00 |
137,088.00 |
250.00 |
108,800.00 |
175.00 |
76,160.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
65.00 |
13,000.00 |
70.00 |
14,000.00 |
75.00 |
15,000.00 |
65.00 |
13,000.00 |
| 704-09 |
guard rail anchor sections (turndown)
|
200.0 |
LNFT |
40.00 |
8,000.00 |
40.00 |
8,000.00 |
55.00 |
11,000.00 |
45.00 |
9,000.00 |
| 705-01 |
barbed wire fence
|
150   |
LNFT |
10.00 |
1,500.00 |
10.00 |
1,500.00 |
14.00 |
2,100.00 |
5.00 |
750.00 |
| 711-01-D |
riprap (55 lb,18" thick)
|
469   |
SQYD |
72.00 |
33,768.00 |
85.00 |
39,865.00 |
77.00 |
36,113.00 |
75.00 |
35,175.00 |
| 711-04 |
geotextile fabric
|
469   |
SQYD |
3.00 |
1,407.00 |
5.00 |
2,345.00 |
3.00 |
1,407.00 |
1.00 |
469.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
90,000.00 |
90,000.00 |
15,000.00 |
15,000.00 |
16,000.00 |
16,000.00 |
23,000.00 |
23,000.00 |
| 716-01-A |
mulch (vegetative)
|
1.4 |
TON |
600.00 |
840.00 |
3,000.00 |
4,200.00 |
1,000.00 |
1,400.00 |
1,000.00 |
1,400.00 |
| 717-01 |
seeding
|
37   |
LB |
10.00 |
370.00 |
15.00 |
555.00 |
50.00 |
1,850.00 |
12.00 |
444.00 |
| 718-01 |
fertilizer
|
720   |
LB |
1.50 |
1,080.00 |
1.00 |
720.00 |
2.00 |
1,440.00 |
2.00 |
1,440.00 |
| 726-01 |
bedding material
|
92.6 |
CUYD |
125.00 |
11,575.00 |
115.00 |
10,649.00 |
100.00 |
9,260.00 |
80.00 |
7,408.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
44,000.00 |
44,000.00 |
95,000.00 |
95,000.00 |
109,500.00 |
109,500.00 |
50,000.00 |
50,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
85.00 |
340.00 |
100.00 |
400.00 |
75.00 |
300.00 |
60.00 |
240.00 |
| 729-16-C |
object marker assembly (type 3)
|
16   |
EACH |
85.00 |
1,360.00 |
100.00 |
1,600.00 |
85.00 |
1,360.00 |
75.00 |
1,200.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
24,000.00 |
24,000.00 |
14,000.00 |
14,000.00 |
45,000.00 |
45,000.00 |
| 804-01-B |
precast concrete piles (14")
|
1,260   |
LNFT |
52.00 |
65,520.00 |
65.00 |
81,900.00 |
66.00 |
83,160.00 |
121.00 |
152,460.00 |
| 804-01-C |
precast concrete piles (16")
|
1,488   |
LNFT |
62.00 |
92,256.00 |
75.00 |
111,600.00 |
84.00 |
124,992.00 |
135.00 |
200,880.00 |
| 804-12 |
loading permanent piles
|
2   |
EACH |
1.00 |
2.00 |
1.00 |
2.00 |
0.00 |
0.00 |
1.00 |
2.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
42.86 |
CUYD |
1,200.00 |
51,432.00 |
1,750.00 |
75,005.00 |
1,200.00 |
51,432.00 |
1,100.00 |
47,146.00 |
| 805-10-A |
bridge superstructure & substructure (24' clear rdwy.;
60 deg.crossing) |
7   |
SPAN |
25,000.00 |
175,000.00 |
26,500.00 |
185,500.00 |
32,000.00 |
224,000.00 |
35,000.00 |
245,000.00 |
| 805-10-B |
bridge superstructure & substructure (24' clear rdwy.;
90deg crossing; cip) |
6   |
SPAN |
28,000.00 |
168,000.00 |
25,000.00 |
150,000.00 |
31,000.00 |
186,000.00 |
36,000.00 |
216,000.00 |
| 805-12-S |
reinforced concrete box culverts (8'x 8')
|
80.0 |
LNFT |
1,000.00 |
80,000.00 |
1,000.00 |
80,000.00 |
900.00 |
72,000.00 |
800.00 |
64,000.00 |
| 806-01 |
deformed reinforcing steel
|
3,190   |
LB |
2.50 |
7,975.00 |
3.00 |
9,570.00 |
2.50 |
7,975.00 |
2.25 |
7,177.50 |
| S-101 |
concrete approach slabs (24' clear rdwy.; 60deg x-ing;
with asphalt) |
2   |
EACH |
9,000.00 |
18,000.00 |
9,000.00 |
18,000.00 |
10,000.00 |
20,000.00 |
10,000.00 |
20,000.00 |
| S-102 |
concrete approach slabs (24' clear rdwy.; 90deg x-ing;
curve; with asphalt) |
2   |
EACH |
9,000.00 |
18,000.00 |
9,500.00 |
19,000.00 |
10,000.00 |
20,000.00 |
9,500.00 |
19,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,186,419.80 |
|
1,270,151.00 |
|
1,388,004.00 |
|
1,446,153.50 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - GILCHRIST CONSTRUCTION CO. LLC |
- 6 - JAMES CONSTRUCTION GROUP LLC |
- 7 - C W & W CONTRACTORS, INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
60,000.00 |
60,000.00 |
50,000.00 |
50,000.00 |
55,000.00 |
55,000.00 |
|
|
| 202-02-A-01 |
removal of bridge (sta. 15+01.32, 23.91' w x 79.17' l;
timber bridge) |
1   |
EACH |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
|
|
| 202-02-A-02 |
removal of bridge (sta. 14+99.55, 26.37' w x 46.25' l;
timber bridge) |
1   |
EACH |
12,000.00 |
12,000.00 |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
|
|
| 202-02-A-03 |
removal of bridge (sta. 14+99.86, 22.76' w x 57.08' l;
timber bridge) |
1   |
EACH |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
155,000.00 |
155,000.00 |
85,000.00 |
85,000.00 |
95,000.00 |
95,000.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
24   |
EACH |
25.00 |
600.00 |
70.00 |
1,680.00 |
10.00 |
240.00 |
|
|
| 204-03 |
temporary slope drains
|
60   |
LNFT |
65.00 |
3,900.00 |
30.00 |
1,800.00 |
10.00 |
600.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
10   |
EACH |
300.00 |
3,000.00 |
200.00 |
2,000.00 |
125.00 |
1,250.00 |
|
|
| 204-06 |
temporary silt fencing
|
1,940   |
LNFT |
2.50 |
4,850.00 |
3.50 |
6,790.00 |
3.00 |
5,820.00 |
|
|
| 302-01 |
class ii base course
|
538.8 |
CUYD |
125.00 |
67,350.00 |
240.00 |
129,312.00 |
110.00 |
59,268.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
39   |
CUYD |
150.00 |
5,850.00 |
275.00 |
10,725.00 |
110.00 |
4,290.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
120.0 |
CUYD |
60.00 |
7,200.00 |
150.00 |
18,000.00 |
110.00 |
13,200.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
435.2 |
TON |
210.00 |
91,392.00 |
275.00 |
119,680.00 |
250.00 |
108,800.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
80.00 |
16,000.00 |
65.00 |
13,000.00 |
75.00 |
15,000.00 |
|
|
| 704-09 |
guard rail anchor sections (turndown)
|
200.0 |
LNFT |
40.00 |
8,000.00 |
37.00 |
7,400.00 |
45.00 |
9,000.00 |
|
|
| 705-01 |
barbed wire fence
|
150   |
LNFT |
7.50 |
1,125.00 |
13.00 |
1,950.00 |
25.00 |
3,750.00 |
|
|
| 711-01-D |
riprap (55 lb,18" thick)
|
469   |
SQYD |
85.00 |
39,865.00 |
65.00 |
30,485.00 |
90.00 |
42,210.00 |
|
|
| 711-04 |
geotextile fabric
|
469   |
SQYD |
4.00 |
1,876.00 |
3.00 |
1,407.00 |
3.00 |
1,407.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
60,000.00 |
60,000.00 |
4,500.00 |
4,500.00 |
55,000.00 |
55,000.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
1.4 |
TON |
600.00 |
840.00 |
695.00 |
973.00 |
3,000.00 |
4,200.00 |
|
|
| 717-01 |
seeding
|
37   |
LB |
10.00 |
370.00 |
15.00 |
555.00 |
60.00 |
2,220.00 |
|
|
| 718-01 |
fertilizer
|
720   |
LB |
1.25 |
900.00 |
0.75 |
540.00 |
6.00 |
4,320.00 |
|
|
| 726-01 |
bedding material
|
92.6 |
CUYD |
100.00 |
9,260.00 |
110.00 |
10,186.00 |
125.00 |
11,575.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
160,000.00 |
160,000.00 |
170,000.00 |
170,000.00 |
200,000.00 |
200,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
80.00 |
320.00 |
80.00 |
320.00 |
100.00 |
400.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
16   |
EACH |
80.00 |
1,280.00 |
80.00 |
1,280.00 |
100.00 |
1,600.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
32,000.00 |
32,000.00 |
20,000.00 |
20,000.00 |
55,000.00 |
55,000.00 |
|
|
| 804-01-B |
precast concrete piles (14")
|
1,260   |
LNFT |
55.00 |
69,300.00 |
70.00 |
88,200.00 |
115.00 |
144,900.00 |
|
|
| 804-01-C |
precast concrete piles (16")
|
1,488   |
LNFT |
65.00 |
96,720.00 |
85.00 |
126,480.00 |
125.00 |
186,000.00 |
|
|
| 804-12 |
loading permanent piles
|
2   |
EACH |
10,000.00 |
20,000.00 |
2,500.00 |
5,000.00 |
1.00 |
2.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
42.86 |
CUYD |
1,500.00 |
64,290.00 |
1,350.00 |
57,861.00 |
1,400.00 |
60,004.00 |
|
|
| 805-10-A |
bridge superstructure & substructure (24' clear rdwy.;
60 deg.crossing) |
7   |
SPAN |
34,000.00 |
238,000.00 |
47,500.00 |
332,500.00 |
30,000.00 |
210,000.00 |
|
|
| 805-10-B |
bridge superstructure & substructure (24' clear rdwy.;
90deg crossing; cip) |
6   |
SPAN |
36,000.00 |
216,000.00 |
47,500.00 |
285,000.00 |
40,000.00 |
240,000.00 |
|
|
| 805-12-S |
reinforced concrete box culverts (8'x 8')
|
80.0 |
LNFT |
1,000.00 |
80,000.00 |
740.00 |
59,200.00 |
1,200.00 |
96,000.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
3,190   |
LB |
2.00 |
6,380.00 |
2.25 |
7,177.50 |
3.00 |
9,570.00 |
|
|
| S-101 |
concrete approach slabs (24' clear rdwy.; 60deg x-ing;
with asphalt) |
2   |
EACH |
11,500.00 |
23,000.00 |
7,500.00 |
15,000.00 |
20,000.00 |
40,000.00 |
|
|
| S-102 |
concrete approach slabs (24' clear rdwy.; 90deg x-ing;
curve; with asphalt) |
2   |
EACH |
11,500.00 |
23,000.00 |
7,500.00 |
15,000.00 |
20,000.00 |
40,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,599,668.00 |
|
1,709,001.50 |
|
1,790,626.00 |
|
|
|