| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - COASTAL BRIDGE CO., L.L.C. |
- 2 - TOPCOR SERVICES, INC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
100,000.00 |
100,000.00 |
31,250.00 |
31,250.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
100,000.00 |
100,000.00 |
6,250.00 |
6,250.00 |
|
|
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
130   |
SQYD |
20.00 |
2,600.00 |
19.50 |
2,535.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
116   |
SQYD |
20.00 |
2,320.00 |
12.50 |
1,450.00 |
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
272.2 |
LNFT |
20.00 |
5,444.00 |
12.50 |
3,402.50 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
118.5 |
SQYD |
20.00 |
2,370.00 |
10.00 |
1,185.00 |
|
|
|
|
| 202-02-01 |
removal of concrete approach slabs
|
2   |
EACH |
5,000.00 |
10,000.00 |
5,625.00 |
11,250.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
100   |
CUYD |
35.00 |
3,500.00 |
18.75 |
1,875.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
10   |
EACH |
20.00 |
200.00 |
18.75 |
187.50 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
EACH |
350.00 |
1,400.00 |
156.25 |
625.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
800   |
LNFT |
5.00 |
4,000.00 |
2.50 |
2,000.00 |
|
|
|
|
| 302-01-A |
class ii base course(stone or rpcc)
|
31.4 |
CUYD |
120.00 |
3,768.00 |
137.50 |
4,317.50 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
39.8 |
TON |
500.00 |
19,900.00 |
250.00 |
9,950.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
2,200   |
SQYD |
10.00 |
22,000.00 |
6.75 |
14,850.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 128   |
CUYD |
1.00 |
- 128.00 |
1.25 |
- 160.00 |
|
|
|
|
| 701-04-E-01 |
storm drain pipe arch (30" equiv. cmpa)(outfall)
|
100   |
LNFT |
100.00 |
10,000.00 |
131.25 |
13,125.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
1   |
EACH |
5,000.00 |
5,000.00 |
4,375.00 |
4,375.00 |
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
123.6 |
SQYD |
70.00 |
8,652.00 |
106.25 |
13,132.50 |
|
|
|
|
| 707-01-A |
concrete curb(barrier)
|
188.4 |
LNFT |
70.00 |
13,188.00 |
118.75 |
22,372.50 |
|
|
|
|
| 711-01-C |
riprap (30 lb, 14" thick
|
25   |
SQYD |
150.00 |
3,750.00 |
106.25 |
2,656.25 |
|
|
|
|
| 711-04 |
geotextile fabric
|
25   |
SQYD |
10.00 |
250.00 |
31.25 |
781.25 |
|
|
|
|
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
24   |
SQYD |
150.00 |
3,600.00 |
130.00 |
3,120.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
50,000.00 |
50,000.00 |
18,750.00 |
18,750.00 |
|
|
|
|
| 717-01 |
seeding
|
4   |
LB |
25.00 |
100.00 |
62.50 |
250.00 |
|
|
|
|
| 718-01 |
fertilizer
|
100   |
LB |
2.00 |
200.00 |
2.50 |
250.00 |
|
|
|
|
| 720-01-B |
erosion control system, slope protection (type b)
|
144   |
SQYD |
5.00 |
720.00 |
3.75 |
540.00 |
|
|
|
|
| 726-01 |
bedding material
|
11.2 |
CUYD |
100.00 |
1,120.00 |
81.25 |
910.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
250,000.00 |
250,000.00 |
300,000.00 |
300,000.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
25,000.00 |
25,000.00 |
52,500.00 |
52,500.00 |
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
7.88 |
CUYD |
4,000.00 |
31,520.00 |
4,870.00 |
38,375.60 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
963   |
LB |
10.00 |
9,630.00 |
10.00 |
9,630.00 |
|
|
|
|
| 813-01 |
concrete approach slabs
|
233.55 |
SQYD |
300.00 |
70,065.00 |
331.25 |
77,363.44 |
|
|
|
|
| S-101 |
cleaning and painting(bridge repair projects)
|
lump |
LUMP |
180,000.00 |
180,000.00 |
31,250.00 |
31,250.00 |
|
|
|
|
| S-102 |
barrier rail repair
|
lump |
LUMP |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| S-103 |
span jacking
|
14   |
each |
20,000.00 |
280,000.00 |
10,000.00 |
140,000.00 |
|
|
|
|
| S-104 |
steel false work and matting
|
lump |
lump |
460,000.00 |
460,000.00 |
775,000.00 |
775,000.00 |
|
|
|
|
| S-105 |
injected crack repair
|
lump |
lump |
60,000.00 |
60,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| S-106 |
spall repair
|
lump |
lump |
37,500.00 |
37,500.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| S-107 |
anchored spall repair
|
lump |
lump |
40,000.00 |
40,000.00 |
59,600.00 |
59,600.00 |
|
|
|
|
| S-108 |
bearing reconstruction
|
lump |
lump |
65,000.00 |
65,000.00 |
164,500.00 |
164,500.00 |
|
|
|
|
| S-109 |
reset spans
|
12   |
each |
6,000.00 |
72,000.00 |
19,500.00 |
234,000.00 |
|
|
|
|
| S-110 |
joint replacement
|
524.0 |
lnft |
600.00 |
314,400.00 |
496.00 |
259,904.00 |
|
|
|
|
| S-111 |
shot blasting bridge deck
|
2,200   |
SQYD |
85.00 |
187,000.00 |
110.00 |
242,000.00 |
|
|
|
|
| S-112 |
high density portland cement concrete
|
2,200   |
SQYD |
210.00 |
462,000.00 |
150.00 |
330,000.00 |
|
|
|
|
| S-113 |
temporary haul road
|
lump |
LUMP |
135,000.00 |
135,000.00 |
62,500.00 |
62,500.00 |
|
|
|
|
| S-114 |
expansion bearing pad replacement
|
75   |
each |
150.00 |
11,250.00 |
445.00 |
33,375.00 |
|
|
|
|
| S-115 |
temporary fence enclosures
|
lump |
lump |
15,000.00 |
15,000.00 |
88,800.00 |
88,800.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,084,319.00 |
|
3,105,028.04 |
|
|
|
|
|