DBE GOAL FED
Lead Project: 713-17-0045
Parish: E BATON ROUGE
Routes:
Description: PERKINS ROAD OVERPASS OVER KCS RAILROAD (REHABILITATION)
Type Const: structural rehabilitation of structure, new approach slabs, resurface bridge deck,superpave
asphaltic concrete pavement, and related work
Estimated Construction Cost: $2,550,713.50
 
RankLicenseBidderConstruction Bid
1 00481 COASTAL BRIDGE CO., L.L.C. $3,084,319.00
2 25652 TOPCOR SERVICES, INC $3,105,028.04
 
Item Number Item Description Quantity Unit of Measure - 1 -
COASTAL BRIDGE CO., L.L.C.
- 2 -
TOPCOR SERVICES, INC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 100,000.00 100,000.00 31,250.00 31,250.00        
202-01 removal of structures & obstructions lump      LUMP 100,000.00 100,000.00 6,250.00 6,250.00        
202-02-C removal of portland cement concrete pavement 130      SQYD 20.00 2,600.00 19.50 2,535.00        
202-02-D removal of concrete walks & drives 116      SQYD 20.00 2,320.00 12.50 1,450.00        
202-02-E removal of concrete curbs 272.2    LNFT 20.00 5,444.00 12.50 3,402.50        
202-02-G removal of surfacing & stabilized base 118.5    SQYD 20.00 2,370.00 10.00 1,185.00        
202-02-01 removal of concrete approach slabs 2      EACH 5,000.00 10,000.00 5,625.00 11,250.00        
203-07 borrow (vehicular measurement) 100      CUYD 35.00 3,500.00 18.75 1,875.00        
204-02 temporary hay or straw bales 10      EACH 20.00 200.00 18.75 187.50        
204-05-A temporary sediment check dams (hay) 4      EACH 350.00 1,400.00 156.25 625.00        
204-06 temporary silt fencing 800      LNFT 5.00 4,000.00 2.50 2,000.00        
302-01-A class ii base course(stone or rpcc) 31.4    CUYD 120.00 3,768.00 137.50 4,317.50        
502-01 superpave asphaltic concrete 39.8    TON 500.00 19,900.00 250.00 9,950.00        
509-01 cold planing asphaltic pavement 2,200      SQYD 10.00 22,000.00 6.75 14,850.00        
509-02 contractor retained reclaimed asphaltic pavement - 128      CUYD 1.00 - 128.00 1.25 - 160.00        
701-04-E-01 storm drain pipe arch (30" equiv. cmpa)(outfall) 100      LNFT 100.00 10,000.00 131.25 13,125.00        
702-03-A catch basins (cb-01) 1      EACH 5,000.00 5,000.00 4,375.00 4,375.00        
706-01-A concrete walk (4" thick) 123.6    SQYD 70.00 8,652.00 106.25 13,132.50        
707-01-A concrete curb(barrier) 188.4    LNFT 70.00 13,188.00 118.75 22,372.50        
711-01-C riprap (30 lb, 14" thick 25      SQYD 150.00 3,750.00 106.25 2,656.25        
711-04 geotextile fabric 25      SQYD 10.00 250.00 31.25 781.25        
712-01-A concrete cast-in-place revetment (4" thick) 24      SQYD 150.00 3,600.00 130.00 3,120.00        
713-01 temporary signs & barricades lump      LUMP 50,000.00 50,000.00 18,750.00 18,750.00        
717-01 seeding 4      LB 25.00 100.00 62.50 250.00        
718-01 fertilizer 100      LB 2.00 200.00 2.50 250.00        
720-01-B erosion control system, slope protection (type b) 144      SQYD 5.00 720.00 3.75 540.00        
726-01 bedding material 11.2    CUYD 100.00 1,120.00 81.25 910.00        
727-01 mobilization lump      LUMP 250,000.00 250,000.00 300,000.00 300,000.00        
740-01 construction layout lump      LUMP 25,000.00 25,000.00 52,500.00 52,500.00        
805-01-F class a concrete (bents) 7.88   CUYD 4,000.00 31,520.00 4,870.00 38,375.60        
806-01 deformed reinforcing steel 963      LB 10.00 9,630.00 10.00 9,630.00        
813-01 concrete approach slabs 233.55   SQYD 300.00 70,065.00 331.25 77,363.44        
S-101 cleaning and painting(bridge repair projects) lump      LUMP 180,000.00 180,000.00 31,250.00 31,250.00        
S-102 barrier rail repair lump      LUMP 5,000.00 5,000.00 10,000.00 10,000.00        
S-103 span jacking 14      each 20,000.00 280,000.00 10,000.00 140,000.00        
S-104 steel false work and matting lump      lump 460,000.00 460,000.00 775,000.00 775,000.00        
S-105 injected crack repair lump      lump 60,000.00 60,000.00 10,000.00 10,000.00        
S-106 spall repair lump      lump 37,500.00 37,500.00 15,000.00 15,000.00        
S-107 anchored spall repair lump      lump 40,000.00 40,000.00 59,600.00 59,600.00        
S-108 bearing reconstruction lump      lump 65,000.00 65,000.00 164,500.00 164,500.00        
S-109 reset spans 12      each 6,000.00 72,000.00 19,500.00 234,000.00        
S-110 joint replacement 524.0    lnft 600.00 314,400.00 496.00 259,904.00        
S-111 shot blasting bridge deck 2,200      SQYD 85.00 187,000.00 110.00 242,000.00        
S-112 high density portland cement concrete 2,200      SQYD 210.00 462,000.00 150.00 330,000.00        
S-113 temporary haul road lump      LUMP 135,000.00 135,000.00 62,500.00 62,500.00        
S-114 expansion bearing pad replacement 75      each 150.00 11,250.00 445.00 33,375.00        
S-115 temporary fence enclosures lump      lump 15,000.00 15,000.00 88,800.00 88,800.00        
                       
 CONTRACTOR TOTAL       3,084,319.00   3,105,028.04        