| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
6,000.00 |
6,000.00 |
1,000.00 |
1,000.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
883   |
SQYD |
16.00 |
14,128.00 |
12.00 |
10,596.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
30   |
EACH |
145.00 |
4,350.00 |
100.00 |
3,000.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
300   |
LNFT |
2.30 |
690.00 |
3.00 |
900.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
20,961.0 |
TON |
92.00 |
1,928,412.00 |
135.00 |
2,829,735.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,796.4 |
TON |
136.00 |
244,310.40 |
200.00 |
359,280.00 |
|
|
|
|
| 509-01-A |
cold planing asphaltic pavement (1.5" thickness)
|
14,980   |
SQYD |
1.50 |
22,470.00 |
3.00 |
44,940.00 |
|
|
|
|
| 509-01-B |
cold planing asphaltic pavement (2" thickness)
|
109,315   |
SQYD |
1.00 |
109,315.00 |
3.25 |
355,273.75 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
10,649   |
SQYD |
120.00 |
1,277,880.00 |
175.00 |
1,863,575.00 |
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
12,744   |
LNFT |
1.10 |
14,018.40 |
1.25 |
15,930.00 |
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
10,655   |
LNFT |
1.60 |
17,048.00 |
1.75 |
18,646.25 |
|
|
|
|
| 602-03 |
cleaning and sealing cracks
|
1,500   |
LNFT |
3.25 |
4,875.00 |
3.25 |
4,875.00 |
|
|
|
|
| 701-03-F |
storm drain pipe (15" rcp)
|
597   |
LNFT |
143.00 |
85,371.00 |
180.00 |
107,460.00 |
|
|
|
|
| 701-03-G |
storm drain pipe (18" rcp)
|
81   |
LNFT |
150.00 |
12,150.00 |
200.00 |
16,200.00 |
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
456.6 |
SQYD |
71.00 |
32,418.60 |
70.00 |
31,962.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
246.6 |
SQYD |
70.00 |
17,262.00 |
80.00 |
19,728.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
150,000.00 |
150,000.00 |
500,000.00 |
500,000.00 |
|
|
|
|
| 713-02-B |
temporary pavement markings (6" width)
|
4,057   |
LNFT |
0.25 |
1,014.25 |
0.25 |
1,014.25 |
|
|
|
|
| 713-02-C |
temporary pavement markings (8" width)
|
200   |
LNFT |
0.30 |
60.00 |
0.30 |
60.00 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
8.560 |
MILE |
250.00 |
2,140.00 |
425.00 |
3,638.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
17.120 |
MILE |
400.00 |
6,848.00 |
710.00 |
12,155.20 |
|
|
|
|
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
5   |
EACH |
50.00 |
250.00 |
50.00 |
250.00 |
|
|
|
|
| 713-05-C |
temporary pavement legends and symbols (only)
|
1   |
EACH |
75.00 |
75.00 |
75.00 |
75.00 |
|
|
|
|
| 713-05-E |
temporary pavement legends and symbols (school
crossing) |
1   |
EACH |
250.00 |
250.00 |
250.00 |
250.00 |
|
|
|
|
| 714-01 |
slab sodding
|
300   |
SQYD |
9.00 |
2,700.00 |
10.00 |
3,000.00 |
|
|
|
|
| 717-01 |
seeding
|
250   |
LB |
10.00 |
2,500.00 |
10.00 |
2,500.00 |
|
|
|
|
| 718-01 |
fertilizer
|
5,000   |
LB |
0.44 |
2,200.00 |
0.50 |
2,500.00 |
|
|
|
|
| 723-02 |
granular material (vehicular measurement)
|
600   |
CUYD |
30.50 |
18,300.00 |
30.00 |
18,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
700,000.00 |
700,000.00 |
1,000,000.00 |
1,000,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,809   |
EACH |
5.10 |
9,225.90 |
5.00 |
9,045.00 |
|
|
|
|
| 732-01-B |
plastic pavement striping (6" width)
|
23,297   |
LNFT |
0.65 |
15,143.05 |
0.65 |
15,143.05 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
200   |
LNFT |
0.85 |
170.00 |
0.85 |
170.00 |
|
|
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
1,810   |
LNFT |
1.50 |
2,715.00 |
1.50 |
2,715.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
12.390 |
MILE |
2,610.00 |
32,337.90 |
2,600.00 |
32,214.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
8.560 |
MILE |
590.00 |
5,050.40 |
600.00 |
5,136.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
5   |
EACH |
195.00 |
975.00 |
200.00 |
1,000.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
1   |
EACH |
225.00 |
225.00 |
225.00 |
225.00 |
|
|
|
|
| 732-04-E |
plastic pavement legends & symbols (school crossing)
|
2   |
EACH |
425.00 |
850.00 |
425.00 |
850.00 |
|
|
|
|
| 736-09 |
loop detector
|
1,100   |
LNFT |
13.00 |
14,300.00 |
13.00 |
14,300.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
32,000.00 |
32,000.00 |
60,000.00 |
60,000.00 |
|
|
|
|
| S-001 |
concrete walks (6" thick)(handicap ramp - type a)
|
78   |
EACH |
1,525.00 |
118,950.00 |
2,800.00 |
218,400.00 |
|
|
|
|
| S-002 |
concrete walks (6" thick)(handicap ramp - type b)
|
23   |
EACH |
1,650.00 |
37,950.00 |
2,800.00 |
64,400.00 |
|
|
|
|
| S-003 |
shoulder reconstruction
|
19,100   |
LNFT |
22.00 |
420,200.00 |
25.00 |
477,500.00 |
|
|
|
|
| S-004 |
reconstruction of concrete curb and gutter bottom (8"
barrier curb) |
1,366.0 |
LNFT |
72.50 |
99,035.00 |
80.00 |
109,280.00 |
|
|
|
|
| S-005 |
reconstruction of concrete curb and gutter bottom
(mountable curb) |
381.0 |
LNFT |
72.50 |
27,622.50 |
80.00 |
30,480.00 |
|
|
|
|
| S-006 |
drilled doweled 8" barrier concrete curb
|
147.0 |
LNFT |
36.75 |
5,402.25 |
30.00 |
4,410.00 |
|
|
|
|
| S-007 |
doweled 8" barrier concrete curb
|
786.0 |
LNFT |
24.25 |
19,060.50 |
25.00 |
19,650.00 |
|
|
|
|
| S-007A |
doweled mountable concrete curb
|
1,220.0 |
LNFT |
23.00 |
28,060.00 |
25.00 |
30,500.00 |
|
|
|
|
| S-008 |
concrete pavement repair (18.0 sq. yds. and under)
|
394.6 |
SQYD |
167.00 |
65,898.20 |
250.00 |
98,650.00 |
|
|
|
|
| S-009 |
concrete pavement repair (18.1 sq. yds. to 48.0 sq.
yds.) |
925.0 |
SQYD |
153.00 |
141,525.00 |
220.00 |
203,500.00 |
|
|
|
|
| S-010 |
concrete pavement repair (48.1 sq. yds. and over)
|
7,446.2 |
SQYD |
148.00 |
1,102,037.60 |
165.00 |
1,228,623.00 |
|
|
|
|
| S-011 |
tree protection
|
lump |
LUMP |
22,000.00 |
22,000.00 |
1,000.00 |
1,000.00 |
|
|
|
|
| S-012 |
tree trimming
|
lump |
LUMP |
45,000.00 |
45,000.00 |
75,000.00 |
75,000.00 |
|
|
|
|
| S-013 |
root pruining
|
20   |
EACH |
265.00 |
5,300.00 |
300.00 |
6,000.00 |
|
|
|
|
| S-014 |
hand formed poured in place concrete curb within the
limits of the tree dri p line |
20.0 |
LNFT |
81.00 |
1,620.00 |
40.00 |
800.00 |
|
|
|
|
| S-015 |
gravel bed and filter cloth over tree roots
|
300   |
SQYD |
22.50 |
6,750.00 |
20.00 |
6,000.00 |
|
|
|
|
| S-016A |
catch basin adjustment type a
|
2   |
EACH |
1,700.00 |
3,400.00 |
1,200.00 |
2,400.00 |
|
|
|
|
| S-016B |
catch basin adjustment type b
|
5   |
EACH |
1,900.00 |
9,500.00 |
1,500.00 |
7,500.00 |
|
|
|
|
| S-017 |
manhole adjustment
|
37   |
EACH |
1,100.00 |
40,700.00 |
1,200.00 |
44,400.00 |
|
|
|
|
| S-018 |
drain manhole (no. 1)
|
5   |
EACH |
5,600.00 |
28,000.00 |
4,500.00 |
22,500.00 |
|
|
|
|
| S-019 |
reset drain manhole frame and cover
|
1   |
EACH |
1,500.00 |
1,500.00 |
800.00 |
800.00 |
|
|
|
|
| S-020 |
rehabilitate existing catch basins
|
3   |
EACH |
3,750.00 |
11,250.00 |
1,500.00 |
4,500.00 |
|
|
|
|
| S-021 |
catch basin adjustment type c
|
4   |
EACH |
3,600.00 |
14,400.00 |
4,400.00 |
17,600.00 |
|
|
|
|
| S-022 |
catch basin adjustment type c (double vertical)
|
1   |
EACH |
6,700.00 |
6,700.00 |
9,200.00 |
9,200.00 |
|
|
|
|
| S-023 |
catch basin frame and cover
|
3   |
EACH |
2,850.00 |
8,550.00 |
2,000.00 |
6,000.00 |
|
|
|
|
| S-024 |
grate inlet frame and cover
|
1   |
EACH |
2,450.00 |
2,450.00 |
1,200.00 |
1,200.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
7,062,888.95 |
|
10,057,634.50 |
|
|
|
|
|