| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - ATWOOD FENCE COMPANY INC. |
- 2 - HIGHWAY TECHNOLOGIES INC |
- 3 - ALPHA SERVICE AND PRODUCTS, INC. |
- 4 - RMD HOLDINGS LTD |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
3,588   |
LNFT |
6.50 |
23,322.00 |
2.43 |
8,718.84 |
8.00 |
28,704.00 |
10.50 |
37,674.00 |
| 202-02-J |
removal of sign and support(s)
|
562   |
EACH |
250.00 |
140,500.00 |
32.28 |
18,141.36 |
300.00 |
168,600.00 |
205.00 |
115,210.00 |
| 202-02-K |
removal of sign face(s)
|
854   |
EACH |
95.00 |
81,130.00 |
250.00 |
213,500.00 |
110.00 |
93,940.00 |
105.00 |
89,670.00 |
| 202-02-M |
removal of sign and u-channel post
|
288   |
EACH |
75.00 |
21,600.00 |
32.28 |
9,296.64 |
50.00 |
14,400.00 |
48.00 |
13,824.00 |
| 202-02-N |
removal of sign support footing
|
57   |
EACH |
350.00 |
19,950.00 |
212.63 |
12,119.91 |
250.00 |
14,250.00 |
210.00 |
11,970.00 |
| 202-02-Q |
removal of overhead sign support
|
3   |
EACH |
5,050.00 |
15,150.00 |
2,399.82 |
7,199.46 |
4,000.00 |
12,000.00 |
5,200.00 |
15,600.00 |
| 202-02-R |
removal of overhead sign support footing
|
5   |
EACH |
4,500.00 |
22,500.00 |
3,720.94 |
18,604.70 |
8,000.00 |
40,000.00 |
3,675.00 |
18,375.00 |
| 202-02-V |
removal of overhead sign fascia mounting
|
1   |
EACH |
2,500.00 |
2,500.00 |
1,199.91 |
1,199.91 |
5,000.00 |
5,000.00 |
1,900.00 |
1,900.00 |
| 202-02-X |
removal of structure mounted posts
|
6   |
EACH |
600.00 |
3,600.00 |
107.60 |
645.60 |
1,000.00 |
6,000.00 |
1,500.00 |
9,000.00 |
| 203-03 |
embankment
|
53,552   |
CUYD |
12.75 |
682,788.00 |
28.00 |
1,499,456.00 |
16.00 |
856,832.00 |
21.00 |
1,124,592.00 |
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
1,687.5 |
LNFT |
55.00 |
92,812.50 |
65.00 |
109,687.50 |
57.00 |
96,187.50 |
63.00 |
106,312.50 |
| 704-03 |
blocked out guard rail
|
5,781.3 |
LNFT |
22.00 |
127,188.60 |
22.00 |
127,188.60 |
21.00 |
121,407.30 |
21.00 |
121,407.30 |
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
281.3 |
LNFT |
85.00 |
23,910.50 |
123.17 |
34,647.72 |
107.00 |
30,099.10 |
63.00 |
17,721.90 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
50.0 |
LNFT |
55.00 |
2,750.00 |
235.05 |
11,752.50 |
62.00 |
3,100.00 |
63.00 |
3,150.00 |
| 704-11-A |
guard rail end treatment (flared)
|
26   |
EACH |
2,200.00 |
57,200.00 |
2,422.15 |
62,975.90 |
2,300.00 |
59,800.00 |
2,100.00 |
54,600.00 |
| 704-11-B |
guard rail end treatment (tangent)
|
19   |
EACH |
2,700.00 |
51,300.00 |
2,906.35 |
55,220.65 |
2,500.00 |
47,500.00 |
2,415.00 |
45,885.00 |
| 706-03-A |
incidental concrete paving (4" thick)
|
10,350.0 |
SQYD |
60.00 |
621,000.00 |
48.02 |
497,007.00 |
51.00 |
527,850.00 |
48.30 |
499,905.00 |
| 706-03-C |
incidental concrete paving (6" thick)
|
197.4 |
SQYD |
75.00 |
14,805.00 |
216.35 |
42,707.49 |
75.00 |
14,805.00 |
58.80 |
11,607.12 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
50,000.00 |
50,000.00 |
45,418.19 |
45,418.19 |
200,000.00 |
200,000.00 |
40,000.00 |
40,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
250,000.00 |
250,000.00 |
505,988.66 |
505,988.66 |
380,000.00 |
380,000.00 |
120,000.00 |
120,000.00 |
| 729-01 |
sign (type a)
|
6,823.4 |
SQFT |
22.00 |
150,114.80 |
11.81 |
80,584.35 |
21.00 |
143,291.40 |
27.00 |
184,231.80 |
| 729-02 |
sign (type b)
|
1,637.4 |
SQFT |
24.00 |
39,297.60 |
11.89 |
19,468.69 |
23.00 |
37,660.20 |
28.00 |
45,847.20 |
| 729-04 |
sign (type d)
|
17,368.5 |
SQFT |
27.00 |
468,949.50 |
19.00 |
330,001.50 |
24.00 |
416,844.00 |
32.00 |
555,792.00 |
| 729-05 |
sign (type e)
|
1,306.0 |
SQFT |
27.00 |
35,262.00 |
22.29 |
29,110.74 |
27.00 |
35,262.00 |
37.00 |
48,322.00 |
| 729-06 |
sign (overhead mounted)
|
6,283.5 |
SQFT |
28.00 |
175,938.00 |
17.85 |
112,160.48 |
28.00 |
175,938.00 |
35.00 |
219,922.50 |
| 729-08-A |
mounting (2 1/2" post)
|
408   |
EACH |
800.00 |
326,400.00 |
345.03 |
140,772.24 |
750.00 |
306,000.00 |
790.00 |
322,320.00 |
| 729-08-B |
mounting (3 1/2" post)
|
177   |
EACH |
950.00 |
168,150.00 |
539.60 |
95,509.20 |
915.00 |
161,955.00 |
1,090.00 |
192,930.00 |
| 729-08-B-01 |
mounting (3 1/2" post)(structure mounted)
|
8   |
EACH |
950.00 |
7,600.00 |
739.40 |
5,915.20 |
950.00 |
7,600.00 |
925.00 |
7,400.00 |
| 729-08-C |
mounting (5" post)
|
12   |
EACH |
1,200.00 |
14,400.00 |
855.57 |
10,266.84 |
1,250.00 |
15,000.00 |
1,610.00 |
19,320.00 |
| 729-08-E |
mounting (s3 x 5.7)
|
76   |
EACH |
950.00 |
72,200.00 |
871.21 |
66,211.96 |
890.00 |
67,640.00 |
903.00 |
68,628.00 |
| 729-08-F |
mounting (w6 x 12)
|
240   |
EACH |
975.00 |
234,000.00 |
1,400.00 |
336,000.00 |
915.00 |
219,600.00 |
1,390.00 |
333,600.00 |
| 729-08-G |
mounting (w8 x 18)
|
26   |
EACH |
1,400.00 |
36,400.00 |
1,440.44 |
37,451.44 |
1,450.00 |
37,700.00 |
1,822.00 |
47,372.00 |
| 729-08-H |
mounting (w8 x 24)
|
128   |
EACH |
1,950.00 |
249,600.00 |
2,042.77 |
261,474.56 |
2,150.00 |
275,200.00 |
2,358.00 |
301,824.00 |
| 729-09-A |
mounting (overhead truss)(ground mounted)(96' span)
|
2   |
EACH |
102,775.00 |
205,550.00 |
89,929.99 |
179,859.98 |
97,000.00 |
194,000.00 |
91,800.00 |
183,600.00 |
| 729-09-B |
mounting (overhead truss)(ground mounted)(102' span)
|
1   |
EACH |
105,250.00 |
105,250.00 |
90,889.75 |
90,889.75 |
97,000.00 |
97,000.00 |
94,140.00 |
94,140.00 |
| 729-13 |
mounting (bridge fascia mounted)
|
1   |
EACH |
7,500.00 |
7,500.00 |
10,925.17 |
10,925.17 |
9,500.00 |
9,500.00 |
9,470.00 |
9,470.00 |
| 729-16-C |
object marker assembly (type 3)
|
45   |
EACH |
75.00 |
3,375.00 |
131.18 |
5,903.10 |
85.00 |
3,825.00 |
79.00 |
3,555.00 |
| 729-17 |
milepost assembly (ground mounted)
|
47   |
EACH |
150.00 |
7,050.00 |
81.27 |
3,819.69 |
150.00 |
7,050.00 |
95.00 |
4,465.00 |
| 729-18 |
milepost assembly (structure mounted)
|
3   |
EACH |
200.00 |
600.00 |
81.27 |
243.81 |
150.00 |
450.00 |
105.00 |
315.00 |
| 729-20 |
footings for overhead mountings (truss)
|
6   |
EACH |
26,500.00 |
159,000.00 |
12,544.88 |
75,269.28 |
27,000.00 |
162,000.00 |
20,570.00 |
123,420.00 |
| 729-20-A |
footings for overhead mountings (cantilever)
|
1   |
EACH |
26,500.00 |
26,500.00 |
14,543.55 |
14,543.55 |
27,000.00 |
27,000.00 |
22,700.00 |
22,700.00 |
| 730-01 |
trenching and backfilling
|
770   |
LNFT |
10.00 |
7,700.00 |
3.23 |
2,487.10 |
7.00 |
5,390.00 |
4.35 |
3,349.50 |
| 730-02-F |
conduit with conductors (1 1/2" sch 40 pvc; 2 #2,
1 #2 bare) |
770   |
LNFT |
35.00 |
26,950.00 |
9.72 |
7,484.40 |
22.00 |
16,940.00 |
8.80 |
6,776.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
225,000.00 |
225,000.00 |
25,962.53 |
25,962.53 |
50,000.00 |
50,000.00 |
40,000.00 |
40,000.00 |
| S-001 |
remove & remount logo panel
|
137   |
ea |
55.00 |
7,535.00 |
40.15 |
5,500.55 |
50.00 |
6,850.00 |
124.00 |
16,988.00 |
| S-002 |
remove overhead signs
|
6   |
ea |
1,100.00 |
6,600.00 |
1,589.35 |
9,536.10 |
400.00 |
2,400.00 |
870.00 |
5,220.00 |
| S-003 |
structure mounted sign support bracket for type "a"
signs and type "d" sign s |
8   |
ea |
3,500.00 |
28,000.00 |
2,846.61 |
22,772.88 |
3,700.00 |
29,600.00 |
3,060.00 |
24,480.00 |
| S-004 |
special sign mounting detail for cantilever
|
2   |
ea |
1,200.00 |
2,400.00 |
2,932.06 |
5,864.12 |
1,150.00 |
2,300.00 |
1,330.00 |
2,660.00 |
| S-005 |
remount oh cantilever structure
|
1   |
ea |
6,500.00 |
6,500.00 |
4,347.01 |
4,347.01 |
41,000.00 |
41,000.00 |
2,760.00 |
2,760.00 |
| S-006 |
dynamic message sign unit
|
4   |
ea |
12,500.00 |
50,000.00 |
9,572.38 |
38,289.52 |
12,000.00 |
48,000.00 |
17,440.00 |
69,760.00 |
| S-007 |
guard rail terminal connector (thrie beam)
|
lump |
LUMP |
250.00 |
250.00 |
14,043.23 |
14,043.23 |
2,000.00 |
2,000.00 |
1,500.00 |
1,500.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
5,158,078.50 |
|
5,324,145.60 |
|
5,325,470.50 |
|
5,421,071.82 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - GRADY CRAWFORD CONST. CO., INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
3,588   |
LNFT |
7.00 |
25,116.00 |
|
|
|
|
|
|
| 202-02-J |
removal of sign and support(s)
|
562   |
EACH |
210.00 |
118,020.00 |
|
|
|
|
|
|
| 202-02-K |
removal of sign face(s)
|
854   |
EACH |
150.00 |
128,100.00 |
|
|
|
|
|
|
| 202-02-M |
removal of sign and u-channel post
|
288   |
EACH |
75.00 |
21,600.00 |
|
|
|
|
|
|
| 202-02-N |
removal of sign support footing
|
57   |
EACH |
300.00 |
17,100.00 |
|
|
|
|
|
|
| 202-02-Q |
removal of overhead sign support
|
3   |
EACH |
5,000.00 |
15,000.00 |
|
|
|
|
|
|
| 202-02-R |
removal of overhead sign support footing
|
5   |
EACH |
6,000.00 |
30,000.00 |
|
|
|
|
|
|
| 202-02-V |
removal of overhead sign fascia mounting
|
1   |
EACH |
3,000.00 |
3,000.00 |
|
|
|
|
|
|
| 202-02-X |
removal of structure mounted posts
|
6   |
EACH |
2,000.00 |
12,000.00 |
|
|
|
|
|
|
| 203-03 |
embankment
|
53,552   |
CUYD |
23.00 |
1,231,696.00 |
|
|
|
|
|
|
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
1,687.5 |
LNFT |
55.00 |
92,812.50 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
5,781.3 |
LNFT |
25.00 |
144,532.50 |
|
|
|
|
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
281.3 |
LNFT |
95.00 |
26,723.50 |
|
|
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
50.0 |
LNFT |
68.00 |
3,400.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
26   |
EACH |
2,500.00 |
65,000.00 |
|
|
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
19   |
EACH |
2,500.00 |
47,500.00 |
|
|
|
|
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
10,350.0 |
SQYD |
60.00 |
621,000.00 |
|
|
|
|
|
|
| 706-03-C |
incidental concrete paving (6" thick)
|
197.4 |
SQYD |
70.00 |
13,818.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
75,000.00 |
75,000.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
600,000.00 |
600,000.00 |
|
|
|
|
|
|
| 729-01 |
sign (type a)
|
6,823.4 |
SQFT |
19.00 |
129,644.60 |
|
|
|
|
|
|
| 729-02 |
sign (type b)
|
1,637.4 |
SQFT |
20.00 |
32,748.00 |
|
|
|
|
|
|
| 729-04 |
sign (type d)
|
17,368.5 |
SQFT |
21.00 |
364,738.50 |
|
|
|
|
|
|
| 729-05 |
sign (type e)
|
1,306.0 |
SQFT |
27.00 |
35,262.00 |
|
|
|
|
|
|
| 729-06 |
sign (overhead mounted)
|
6,283.5 |
SQFT |
23.00 |
144,520.50 |
|
|
|
|
|
|
| 729-08-A |
mounting (2 1/2" post)
|
408   |
EACH |
800.00 |
326,400.00 |
|
|
|
|
|
|
| 729-08-B |
mounting (3 1/2" post)
|
177   |
EACH |
1,000.00 |
177,000.00 |
|
|
|
|
|
|
| 729-08-B-01 |
mounting (3 1/2" post)(structure mounted)
|
8   |
EACH |
800.00 |
6,400.00 |
|
|
|
|
|
|
| 729-08-C |
mounting (5" post)
|
12   |
EACH |
1,350.00 |
16,200.00 |
|
|
|
|
|
|
| 729-08-E |
mounting (s3 x 5.7)
|
76   |
EACH |
1,000.00 |
76,000.00 |
|
|
|
|
|
|
| 729-08-F |
mounting (w6 x 12)
|
240   |
EACH |
1,125.00 |
270,000.00 |
|
|
|
|
|
|
| 729-08-G |
mounting (w8 x 18)
|
26   |
EACH |
1,500.00 |
39,000.00 |
|
|
|
|
|
|
| 729-08-H |
mounting (w8 x 24)
|
128   |
EACH |
2,175.00 |
278,400.00 |
|
|
|
|
|
|
| 729-09-A |
mounting (overhead truss)(ground mounted)(96' span)
|
2   |
EACH |
80,000.00 |
160,000.00 |
|
|
|
|
|
|
| 729-09-B |
mounting (overhead truss)(ground mounted)(102' span)
|
1   |
EACH |
85,000.00 |
85,000.00 |
|
|
|
|
|
|
| 729-13 |
mounting (bridge fascia mounted)
|
1   |
EACH |
8,000.00 |
8,000.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
45   |
EACH |
140.00 |
6,300.00 |
|
|
|
|
|
|
| 729-17 |
milepost assembly (ground mounted)
|
47   |
EACH |
224.00 |
10,528.00 |
|
|
|
|
|
|
| 729-18 |
milepost assembly (structure mounted)
|
3   |
EACH |
150.00 |
450.00 |
|
|
|
|
|
|
| 729-20 |
footings for overhead mountings (truss)
|
6   |
EACH |
27,000.00 |
162,000.00 |
|
|
|
|
|
|
| 729-20-A |
footings for overhead mountings (cantilever)
|
1   |
EACH |
27,000.00 |
27,000.00 |
|
|
|
|
|
|
| 730-01 |
trenching and backfilling
|
770   |
LNFT |
10.00 |
7,700.00 |
|
|
|
|
|
|
| 730-02-F |
conduit with conductors (1 1/2" sch 40 pvc; 2 #2,
1 #2 bare) |
770   |
LNFT |
50.00 |
38,500.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
40,000.00 |
40,000.00 |
|
|
|
|
|
|
| S-001 |
remove & remount logo panel
|
137   |
ea |
100.00 |
13,700.00 |
|
|
|
|
|
|
| S-002 |
remove overhead signs
|
6   |
ea |
2,800.00 |
16,800.00 |
|
|
|
|
|
|
| S-003 |
structure mounted sign support bracket for type "a"
signs and type "d" sign s |
8   |
ea |
3,000.00 |
24,000.00 |
|
|
|
|
|
|
| S-004 |
special sign mounting detail for cantilever
|
2   |
ea |
1,600.00 |
3,200.00 |
|
|
|
|
|
|
| S-005 |
remount oh cantilever structure
|
1   |
ea |
8,500.00 |
8,500.00 |
|
|
|
|
|
|
| S-006 |
dynamic message sign unit
|
4   |
ea |
13,000.00 |
52,000.00 |
|
|
|
|
|
|
| S-007 |
guard rail terminal connector (thrie beam)
|
lump |
LUMP |
1,200.00 |
1,200.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
5,852,610.10 |
|
|
|
|
|
|
|