Letting of 9/24/2008 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 424-07-0031
Parish: TERREBONNE
Routes: US 90
Description: US 90 (LA 311 - LAFOURCHE PARISH LINE)
Type Const: grading, pavement patching, superpave asphaltic concrete pavement, and related work.
Estimated Construction Cost: $3,739,244.91
 
RankLicenseBidderConstruction Bid
1 06276 BARRIERE CONSTRUCTION CO., LLC $2,691,332.17
2 06487 HUEY STOCKSTILL, INC. $3,355,010.70
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC
- 2 -
HUEY STOCKSTILL, INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 3,501      LNFT 1.00 3,501.00 4.00 14,004.00        
203-07 borrow (vehicular measurement) 3,000      CUYD 5.00 15,000.00 30.00 90,000.00        
502-01 superpave asphaltic concrete 20,251.9    TON 89.00 1,802,419.10 100.00 2,025,190.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,491.0    TON 69.00 102,879.00 150.00 223,650.00        
510-01-A pavement patching (6" minimum thickness) 100      SQYD 10.00 1,000.00 60.00 6,000.00        
510-01-B pavement patching (12" minimum thickness) 1,100      SQYD 50.00 55,000.00 120.00 132,000.00        
704-03 blocked out guard rail 2,812.5    LNFT 10.00 28,125.00 22.00 61,875.00        
704-07-A guard rail bridge attachments (single thrie beam) 250.0    LNFT 35.00 8,750.00 33.00 8,250.00        
704-08-B guard rail transitions (double thrie beam) 500.0    LNFT 45.00 22,500.00 65.00 32,500.00        
704-11-A guard rail end treatment (flared) 20      EACH 2,000.00 40,000.00 2,300.00 46,000.00        
707-01 concrete curb 200.0    LNFT 10.00 2,000.00 20.00 4,000.00        
713-01 temporary signs & barricades lump      LUMP 227,300.00 227,300.00 100,000.00 100,000.00        
713-02-C temporary pavement markings (8" width) 1,025      LNFT 0.10 102.50 0.30 307.50        
713-02-E temporary pavement markings (24" width) 350      LNFT 0.10 35.00 1.00 350.00        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
14.280  MILE 100.00 1,428.00 180.00 2,570.40        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
7.140  MILE 0.10 0.71 350.00 2,499.00        
713-04-A temporary pavement markings (solid line)(4" width) 18.617  MILE 0.10 1.86 700.00 13,031.90        
717-01 seeding 260      LB 1.00 260.00 10.00 2,600.00        
718-01 fertilizer 8,650      LB 0.10 865.00 1.25 10,812.50        
727-01 mobilization lump      LUMP 250,000.00 250,000.00 330,000.00 330,000.00        
729-16-C object marker assembly (type 3) 20      EACH 10.00 200.00 75.00 1,500.00        
731-02 reflectorized raised pavement markers 2,000      EACH 5.10 10,200.00 5.00 10,000.00        
732-01-C plastic pavement striping (8" width) 1,025      LNFT 0.90 922.50 1.10 1,127.50        
732-01-E plastic pavement striping (24" width) 350      LNFT 3.00 1,050.00 3.50 1,225.00        
732-02-A plastic pavement striping (solid line) (4" width) 18.617  MILE 2,500.00 46,542.50 2,700.00 50,265.90        
732-03-A plastic pavement striping (broken line)(4" width) 7.140  MILE 500.00 3,570.00 800.00 5,712.00        
740-01 construction layout lump      LUMP 15,000.00 15,000.00 15,000.00 15,000.00        
S-001 surface preparation lump      LUMP 50,000.00 50,000.00 120,000.00 120,000.00        
S-002 rumble strips (ground-in) 11.4    MILE 200.00 2,280.00 1,100.00 12,540.00        
S-003 sawcutting asphalt patches (6" deep) 2,000      LNFT 0.10 200.00 1.00 2,000.00        
S-004 sawcutting asphalt patches (12" deep) 2,000      LNFT 0.10 200.00 15.00 30,000.00        
                       
 CONTRACTOR TOTAL       2,691,332.17   3,355,010.70        