| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - HUEY STOCKSTILL, INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
3,501   |
LNFT |
1.00 |
3,501.00 |
4.00 |
14,004.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
3,000   |
CUYD |
5.00 |
15,000.00 |
30.00 |
90,000.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
20,251.9 |
TON |
89.00 |
1,802,419.10 |
100.00 |
2,025,190.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,491.0 |
TON |
69.00 |
102,879.00 |
150.00 |
223,650.00 |
|
|
|
|
| 510-01-A |
pavement patching (6" minimum thickness)
|
100   |
SQYD |
10.00 |
1,000.00 |
60.00 |
6,000.00 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
1,100   |
SQYD |
50.00 |
55,000.00 |
120.00 |
132,000.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
2,812.5 |
LNFT |
10.00 |
28,125.00 |
22.00 |
61,875.00 |
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
250.0 |
LNFT |
35.00 |
8,750.00 |
33.00 |
8,250.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
500.0 |
LNFT |
45.00 |
22,500.00 |
65.00 |
32,500.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
20   |
EACH |
2,000.00 |
40,000.00 |
2,300.00 |
46,000.00 |
|
|
|
|
| 707-01 |
concrete curb
|
200.0 |
LNFT |
10.00 |
2,000.00 |
20.00 |
4,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
227,300.00 |
227,300.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| 713-02-C |
temporary pavement markings (8" width)
|
1,025   |
LNFT |
0.10 |
102.50 |
0.30 |
307.50 |
|
|
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
350   |
LNFT |
0.10 |
35.00 |
1.00 |
350.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
14.280 |
MILE |
100.00 |
1,428.00 |
180.00 |
2,570.40 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
7.140 |
MILE |
0.10 |
0.71 |
350.00 |
2,499.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
18.617 |
MILE |
0.10 |
1.86 |
700.00 |
13,031.90 |
|
|
|
|
| 717-01 |
seeding
|
260   |
LB |
1.00 |
260.00 |
10.00 |
2,600.00 |
|
|
|
|
| 718-01 |
fertilizer
|
8,650   |
LB |
0.10 |
865.00 |
1.25 |
10,812.50 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
250,000.00 |
250,000.00 |
330,000.00 |
330,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
20   |
EACH |
10.00 |
200.00 |
75.00 |
1,500.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,000   |
EACH |
5.10 |
10,200.00 |
5.00 |
10,000.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
1,025   |
LNFT |
0.90 |
922.50 |
1.10 |
1,127.50 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
350   |
LNFT |
3.00 |
1,050.00 |
3.50 |
1,225.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
18.617 |
MILE |
2,500.00 |
46,542.50 |
2,700.00 |
50,265.90 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
7.140 |
MILE |
500.00 |
3,570.00 |
800.00 |
5,712.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| S-001 |
surface preparation
|
lump |
LUMP |
50,000.00 |
50,000.00 |
120,000.00 |
120,000.00 |
|
|
|
|
| S-002 |
rumble strips (ground-in)
|
11.4 |
MILE |
200.00 |
2,280.00 |
1,100.00 |
12,540.00 |
|
|
|
|
| S-003 |
sawcutting asphalt patches (6" deep)
|
2,000   |
LNFT |
0.10 |
200.00 |
1.00 |
2,000.00 |
|
|
|
|
| S-004 |
sawcutting asphalt patches (12" deep)
|
2,000   |
LNFT |
0.10 |
200.00 |
15.00 |
30,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,691,332.17 |
|