| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - KEY CONSTRUCTORS, INC. |
- 3 - JAMES CONSTRUCTION GROUP LLC |
- 4 - BOH BROS. CONSTRUCTION CO., LLC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
50,000.00 |
50,000.00 |
85,000.00 |
85,000.00 |
200,000.00 |
200,000.00 |
67,700.00 |
67,700.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
10,000.00 |
10,000.00 |
30,000.00 |
30,000.00 |
20,500.00 |
20,500.00 |
9,100.00 |
9,100.00 |
| 202-02-A-01 |
removal of bridges (sta. 111+62; 25' x 225' timber
trestle bridge) |
1   |
EACH |
60,000.00 |
60,000.00 |
30,000.00 |
30,000.00 |
150,000.00 |
150,000.00 |
56,500.00 |
56,500.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
3,923.6 |
SQYD |
7.90 |
30,996.44 |
6.00 |
23,541.60 |
7.00 |
27,465.20 |
4.20 |
16,479.12 |
| 202-02-H |
removal of guard rail
|
618   |
LNFT |
16.50 |
10,197.00 |
5.00 |
3,090.00 |
27.00 |
16,686.00 |
7.70 |
4,758.60 |
| 203-05 |
excavation & embankment
|
lump |
LUMP |
450,000.00 |
450,000.00 |
360,000.00 |
360,000.00 |
277,000.00 |
277,000.00 |
521,500.00 |
521,500.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
20   |
EACH |
200.00 |
4,000.00 |
185.00 |
3,700.00 |
150.00 |
3,000.00 |
310.00 |
6,200.00 |
| 204-06 |
temporary silt fencing
|
2,100   |
LNFT |
2.00 |
4,200.00 |
3.25 |
6,825.00 |
3.00 |
6,300.00 |
2.55 |
5,355.00 |
| 302-02-D |
class ii base course (8 1/2" thick)
|
5,481.7 |
SQYD |
24.00 |
131,560.80 |
24.00 |
131,560.80 |
35.00 |
191,859.50 |
26.00 |
142,524.20 |
| 304-01 |
lime
|
79.76 |
TON |
185.00 |
14,755.60 |
200.00 |
15,952.00 |
165.00 |
13,160.40 |
166.00 |
13,240.16 |
| 304-04-D |
lime treatment (type d) (12" thick)
|
5,626   |
SQYD |
2.50 |
14,065.00 |
3.50 |
19,691.00 |
5.25 |
29,536.50 |
2.20 |
12,377.20 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
280   |
CUYD |
110.00 |
30,800.00 |
75.00 |
21,000.00 |
150.00 |
42,000.00 |
99.00 |
27,720.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
150.0 |
CUYD |
100.00 |
15,000.00 |
85.00 |
12,750.00 |
200.00 |
30,000.00 |
107.00 |
16,050.00 |
| 502-01 |
superpave asphaltic concrete
|
1,063.0 |
TON |
135.00 |
143,505.00 |
150.00 |
159,450.00 |
135.00 |
143,505.00 |
189.00 |
200,907.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
351.9 |
TON |
180.00 |
63,342.00 |
200.00 |
70,380.00 |
180.00 |
63,342.00 |
241.00 |
84,807.90 |
| 701-01-G |
cross drain pipe (18" rcp/pcp)
|
67   |
LNFT |
110.00 |
7,370.00 |
60.00 |
4,020.00 |
60.00 |
4,020.00 |
77.00 |
5,159.00 |
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
414   |
LNFT |
115.00 |
47,610.00 |
65.00 |
26,910.00 |
70.00 |
28,980.00 |
91.00 |
37,674.00 |
| 701-01-K |
cross drain pipe (30" rcp/pcp)
|
73   |
LNFT |
140.00 |
10,220.00 |
90.00 |
6,570.00 |
92.00 |
6,716.00 |
110.00 |
8,030.00 |
| 701-05-G |
side drain pipe (18")
|
98   |
LNFT |
65.00 |
6,370.00 |
60.00 |
5,880.00 |
56.00 |
5,488.00 |
58.00 |
5,684.00 |
| 701-05-I |
side drain pipe (24")
|
128   |
LNFT |
70.00 |
8,960.00 |
65.00 |
8,320.00 |
69.00 |
8,832.00 |
72.00 |
9,216.00 |
| 701-05-I-01 |
side drain pipe (24")(erosion)
|
58   |
LNFT |
75.00 |
4,350.00 |
80.00 |
4,640.00 |
82.00 |
4,756.00 |
77.00 |
4,466.00 |
| 704-03 |
blocked out guard rail
|
200.0 |
LNFT |
25.00 |
5,000.00 |
25.00 |
5,000.00 |
24.00 |
4,800.00 |
26.65 |
5,330.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
75.00 |
7,500.00 |
65.00 |
6,500.00 |
65.00 |
6,500.00 |
72.00 |
7,200.00 |
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
2,500.00 |
5,000.00 |
3,000.00 |
6,000.00 |
2,300.00 |
4,600.00 |
2,550.00 |
5,100.00 |
| 705-01 |
barbed wire fence
|
406   |
LNFT |
8.00 |
3,248.00 |
8.00 |
3,248.00 |
5.75 |
2,334.50 |
8.90 |
3,613.40 |
| 705-02 |
combination mesh & barbed wire fence
|
952   |
LNFT |
9.00 |
8,568.00 |
10.00 |
9,520.00 |
5.75 |
5,474.00 |
10.00 |
9,520.00 |
| 705-09 |
rebuilt fence
|
210   |
LNFT |
17.00 |
3,570.00 |
110.00 |
23,100.00 |
17.00 |
3,570.00 |
16.65 |
3,496.50 |
| 708-01 |
right-of-way monument
|
24   |
EACH |
400.00 |
9,600.00 |
250.00 |
6,000.00 |
400.00 |
9,600.00 |
510.00 |
12,240.00 |
| 708-02 |
right-of-way monument witness post
|
24   |
EACH |
400.00 |
9,600.00 |
200.00 |
4,800.00 |
350.00 |
8,400.00 |
27.75 |
666.00 |
| 711-02-D |
riprap (55 lb)
|
286   |
CUYD |
140.00 |
40,040.00 |
215.00 |
61,490.00 |
115.00 |
32,890.00 |
159.00 |
45,474.00 |
| 711-04 |
geotextile fabric
|
572   |
SQYD |
3.00 |
1,716.00 |
2.00 |
1,144.00 |
2.50 |
1,430.00 |
2.40 |
1,372.80 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
35,000.00 |
35,000.00 |
20,000.00 |
20,000.00 |
10,000.00 |
10,000.00 |
19,950.00 |
19,950.00 |
| 716-01-A |
mulch (vegetative)
|
0.13 |
ACRE |
3,400.00 |
442.00 |
2,300.00 |
299.00 |
10,000.00 |
1,300.00 |
5,900.00 |
767.00 |
| 717-01 |
seeding
|
118   |
LB |
8.50 |
1,003.00 |
12.00 |
1,416.00 |
10.00 |
1,180.00 |
10.00 |
1,180.00 |
| 718-01 |
fertilizer
|
2,936   |
LB |
0.55 |
1,614.80 |
0.75 |
2,202.00 |
0.45 |
1,321.20 |
0.40 |
1,174.40 |
| 720-01-A |
erosion control system, slope protection (type a)
|
1,124   |
SQYD |
1.50 |
1,686.00 |
2.25 |
2,529.00 |
2.00 |
2,248.00 |
2.20 |
2,472.80 |
| 722-01 |
project site laboratory
|
1   |
EACH |
25,000.00 |
25,000.00 |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
14,250.00 |
14,250.00 |
| 726-01 |
bedding material
|
76.6 |
CUYD |
100.00 |
7,660.00 |
100.00 |
7,660.00 |
110.00 |
8,426.00 |
87.00 |
6,664.20 |
| 727-01 |
mobilization
|
lump |
LUMP |
330,000.00 |
330,000.00 |
375,000.00 |
375,000.00 |
400,000.00 |
400,000.00 |
616,750.00 |
616,750.00 |
| 729-16-B |
object marker assembly (type 2)
|
2   |
EACH |
60.00 |
120.00 |
80.00 |
160.00 |
50.00 |
100.00 |
84.00 |
168.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
85.00 |
340.00 |
85.00 |
340.00 |
50.00 |
200.00 |
95.00 |
380.00 |
| 731-02 |
reflectorized raised pavement markers
|
46   |
EACH |
6.50 |
299.00 |
5.10 |
234.60 |
5.10 |
234.60 |
22.20 |
1,021.20 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
1.364 |
MILE |
3,400.00 |
4,637.60 |
2,650.00 |
3,614.60 |
2,700.00 |
3,682.80 |
5,550.00 |
7,570.20 |
| 732-03-A |
plastic pavement striping (broken line) (4" width)
|
0.059 |
MILE |
1,000.00 |
59.00 |
790.00 |
46.61 |
670.00 |
39.53 |
1,110.00 |
65.49 |
| 735-01 |
mailboxes
|
1   |
EACH |
12.00 |
12.00 |
100.00 |
100.00 |
10.00 |
10.00 |
83.00 |
83.00 |
| 735-02 |
mailbox supports (single)
|
1   |
EACH |
145.00 |
145.00 |
200.00 |
200.00 |
150.00 |
150.00 |
110.00 |
110.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
50,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
75,000.00 |
75,000.00 |
87,900.00 |
87,900.00 |
| 803-03 |
steel sheet pile wall
|
19,466   |
SQFT |
38.00 |
739,708.00 |
52.00 |
1,012,232.00 |
60.00 |
1,167,960.00 |
47.10 |
916,848.60 |
| 804-01-F |
precast concrete piles (24")
|
2,660   |
LNFT |
110.00 |
292,600.00 |
155.00 |
412,300.00 |
110.00 |
292,600.00 |
195.50 |
520,030.00 |
| 804-05 |
precast concrete test piles
|
1   |
EACH |
25,000.00 |
25,000.00 |
35,000.00 |
35,000.00 |
80,000.00 |
80,000.00 |
17,000.00 |
17,000.00 |
| 804-09 |
loading test piles
|
1   |
EACH |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
2,500.00 |
2,500.00 |
25,000.00 |
25,000.00 |
| 804-10 |
reloading test piles
|
1   |
EACH |
1,500.00 |
1,500.00 |
2,000.00 |
2,000.00 |
2,500.00 |
2,500.00 |
500.00 |
500.00 |
| 804-11 |
redriving test piles
|
1   |
EACH |
1,500.00 |
1,500.00 |
2,000.00 |
2,000.00 |
2,500.00 |
2,500.00 |
750.00 |
750.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
1,500.00 |
1,500.00 |
10,000.00 |
10,000.00 |
1,500.00 |
1,500.00 |
25,300.00 |
25,300.00 |
| 804-17 |
dynamic monitoring
|
3   |
EACH |
800.00 |
2,400.00 |
2,500.00 |
7,500.00 |
1,500.00 |
4,500.00 |
5,950.00 |
17,850.00 |
| 805-01-F |
class a concrete (bents)
|
97.63 |
CUYD |
800.00 |
78,104.00 |
1,200.00 |
117,156.00 |
1,000.00 |
97,630.00 |
2,075.00 |
202,582.25 |
| 805-03 |
class aa concrete
|
247.94 |
CUYD |
950.00 |
235,543.00 |
900.00 |
223,146.00 |
775.00 |
192,153.50 |
995.00 |
246,700.30 |
| 805-08-H |
precast-prestressed concrete girders (type quad beam)
|
1,896.0 |
LNFT |
75.00 |
142,200.00 |
120.00 |
227,520.00 |
80.00 |
151,680.00 |
87.00 |
164,952.00 |
| 805-11 |
strip seal joints
|
80.00 |
LNFT |
200.00 |
16,000.00 |
200.00 |
16,000.00 |
125.00 |
10,000.00 |
200.00 |
16,000.00 |
| 806-01 |
deformed reinforcing steel
|
83,035   |
LB |
1.20 |
99,642.00 |
1.35 |
112,097.25 |
1.00 |
83,035.00 |
1.47 |
122,061.45 |
| 807-08 |
structural metalwork
|
lump |
LUMP |
12,000.00 |
12,000.00 |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
10,270.00 |
10,270.00 |
| 810-01 |
concrete railing (barrier)
|
480.00 |
LNFT |
65.00 |
31,200.00 |
85.00 |
40,800.00 |
55.00 |
26,400.00 |
76.50 |
36,720.00 |
| 813-01 |
concrete approach slabs
|
363.88 |
SQYD |
240.00 |
87,331.20 |
260.00 |
94,608.80 |
225.00 |
81,873.00 |
237.00 |
86,239.56 |
| S-101 |
special anchor section
|
2   |
EACH |
400.00 |
800.00 |
5,000.00 |
10,000.00 |
350.00 |
700.00 |
1,330.00 |
2,660.00 |
| S-102 |
dynamic analysis
|
3   |
EACH |
2,000.00 |
6,000.00 |
2,000.00 |
6,000.00 |
2,700.00 |
8,100.00 |
1,000.00 |
3,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,452,190.44 |
|
3,998,244.26 |
|
4,082,268.73 |
|
4,524,431.33 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - CECIL D. GASSIOTT LLC |
- 6 - GUINN BROTHERS, LLC. |
- 7 - F. MILLER CONSTRUCTION LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
50,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
96,000.00 |
96,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
1,500.00 |
1,500.00 |
|
|
| 202-02-A-01 |
removal of bridges (sta. 111+62; 25' x 225' timber
trestle bridge) |
1   |
EACH |
100,000.00 |
100,000.00 |
85,000.00 |
85,000.00 |
150,000.00 |
150,000.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
3,923.6 |
SQYD |
5.00 |
19,618.00 |
8.00 |
31,388.80 |
5.00 |
19,618.00 |
|
|
| 202-02-H |
removal of guard rail
|
618   |
LNFT |
10.00 |
6,180.00 |
10.00 |
6,180.00 |
3.00 |
1,854.00 |
|
|
| 203-05 |
excavation & embankment
|
lump |
LUMP |
25,000.00 |
25,000.00 |
545,000.00 |
545,000.00 |
740,000.00 |
740,000.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
20   |
EACH |
110.00 |
2,200.00 |
200.00 |
4,000.00 |
150.00 |
3,000.00 |
|
|
| 204-06 |
temporary silt fencing
|
2,100   |
LNFT |
5.00 |
10,500.00 |
5.00 |
10,500.00 |
1.80 |
3,780.00 |
|
|
| 302-02-D |
class ii base course (8 1/2" thick)
|
5,481.7 |
SQYD |
15.00 |
82,225.50 |
24.00 |
131,560.80 |
26.00 |
142,524.20 |
|
|
| 304-01 |
lime
|
79.76 |
TON |
100.00 |
7,976.00 |
200.00 |
15,952.00 |
175.00 |
13,958.00 |
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
5,626   |
SQYD |
2.00 |
11,252.00 |
3.50 |
19,691.00 |
2.10 |
11,814.60 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
280   |
CUYD |
75.00 |
21,000.00 |
85.00 |
23,800.00 |
115.00 |
32,200.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
150.0 |
CUYD |
75.00 |
11,250.00 |
75.00 |
11,250.00 |
98.00 |
14,700.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
1,063.0 |
TON |
225.00 |
239,175.00 |
225.00 |
239,175.00 |
180.00 |
191,340.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
351.9 |
TON |
275.00 |
96,772.50 |
275.00 |
96,772.50 |
220.00 |
77,418.00 |
|
|
| 701-01-G |
cross drain pipe (18" rcp/pcp)
|
67   |
LNFT |
75.00 |
5,025.00 |
68.00 |
4,556.00 |
75.00 |
5,025.00 |
|
|
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
414   |
LNFT |
85.00 |
35,190.00 |
115.00 |
47,610.00 |
85.00 |
35,190.00 |
|
|
| 701-01-K |
cross drain pipe (30" rcp/pcp)
|
73   |
LNFT |
150.00 |
10,950.00 |
155.00 |
11,315.00 |
105.00 |
7,665.00 |
|
|
| 701-05-G |
side drain pipe (18")
|
98   |
LNFT |
75.00 |
7,350.00 |
68.00 |
6,664.00 |
55.00 |
5,390.00 |
|
|
| 701-05-I |
side drain pipe (24")
|
128   |
LNFT |
85.00 |
10,880.00 |
115.00 |
14,720.00 |
70.00 |
8,960.00 |
|
|
| 701-05-I-01 |
side drain pipe (24")(erosion)
|
58   |
LNFT |
85.00 |
4,930.00 |
115.00 |
6,670.00 |
75.00 |
4,350.00 |
|
|
| 704-03 |
blocked out guard rail
|
200.0 |
LNFT |
25.00 |
5,000.00 |
30.00 |
6,000.00 |
25.00 |
5,000.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
75.00 |
7,500.00 |
68.00 |
6,800.00 |
62.00 |
6,200.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
2,500.00 |
5,000.00 |
3,500.00 |
7,000.00 |
2,400.00 |
4,800.00 |
|
|
| 705-01 |
barbed wire fence
|
406   |
LNFT |
10.00 |
4,060.00 |
6.00 |
2,436.00 |
6.70 |
2,720.20 |
|
|
| 705-02 |
combination mesh & barbed wire fence
|
952   |
LNFT |
10.00 |
9,520.00 |
10.50 |
9,996.00 |
7.50 |
7,140.00 |
|
|
| 705-09 |
rebuilt fence
|
210   |
LNFT |
15.00 |
3,150.00 |
25.00 |
5,250.00 |
13.00 |
2,730.00 |
|
|
| 708-01 |
right-of-way monument
|
24   |
EACH |
250.00 |
6,000.00 |
250.00 |
6,000.00 |
450.00 |
10,800.00 |
|
|
| 708-02 |
right-of-way monument witness post
|
24   |
EACH |
250.00 |
6,000.00 |
250.00 |
6,000.00 |
400.00 |
9,600.00 |
|
|
| 711-02-D |
riprap (55 lb)
|
286   |
CUYD |
100.00 |
28,600.00 |
138.00 |
39,468.00 |
170.00 |
48,620.00 |
|
|
| 711-04 |
geotextile fabric
|
572   |
SQYD |
5.00 |
2,860.00 |
5.00 |
2,860.00 |
3.00 |
1,716.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
25,000.00 |
25,000.00 |
38,000.00 |
38,000.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
0.13 |
ACRE |
5,000.00 |
650.00 |
20,000.00 |
2,600.00 |
10,200.00 |
1,326.00 |
|
|
| 717-01 |
seeding
|
118   |
LB |
10.00 |
1,180.00 |
15.00 |
1,770.00 |
10.50 |
1,239.00 |
|
|
| 718-01 |
fertilizer
|
2,936   |
LB |
1.00 |
2,936.00 |
1.00 |
2,936.00 |
0.50 |
1,468.00 |
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
1,124   |
SQYD |
2.50 |
2,810.00 |
2.00 |
2,248.00 |
2.00 |
2,248.00 |
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
9,000.00 |
9,000.00 |
|
|
| 726-01 |
bedding material
|
76.6 |
CUYD |
75.00 |
5,745.00 |
100.00 |
7,660.00 |
82.00 |
6,281.20 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
200,000.00 |
200,000.00 |
440,000.00 |
440,000.00 |
480,000.00 |
480,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
2   |
EACH |
100.00 |
200.00 |
100.00 |
200.00 |
68.00 |
136.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
100.00 |
400.00 |
100.00 |
400.00 |
78.00 |
312.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
46   |
EACH |
20.00 |
920.00 |
8.00 |
368.00 |
5.50 |
253.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
1.364 |
MILE |
5,000.00 |
6,820.00 |
3,250.00 |
4,433.00 |
2,750.00 |
3,751.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line) (4" width)
|
0.059 |
MILE |
1,000.00 |
59.00 |
1,500.00 |
88.50 |
850.00 |
50.15 |
|
|
| 735-01 |
mailboxes
|
1   |
EACH |
25.00 |
25.00 |
100.00 |
100.00 |
115.00 |
115.00 |
|
|
| 735-02 |
mailbox supports (single)
|
1   |
EACH |
125.00 |
125.00 |
150.00 |
150.00 |
280.00 |
280.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
2,000.00 |
2,000.00 |
70,000.00 |
70,000.00 |
50,000.00 |
50,000.00 |
|
|
| 803-03 |
steel sheet pile wall
|
19,466   |
SQFT |
70.00 |
1,362,620.00 |
61.50 |
1,197,159.00 |
48.00 |
934,368.00 |
|
|
| 804-01-F |
precast concrete piles (24")
|
2,660   |
LNFT |
500.00 |
1,330,000.00 |
175.00 |
465,500.00 |
170.00 |
452,200.00 |
|
|
| 804-05 |
precast concrete test piles
|
1   |
EACH |
10,000.00 |
10,000.00 |
60,000.00 |
60,000.00 |
24,000.00 |
24,000.00 |
|
|
| 804-09 |
loading test piles
|
1   |
EACH |
5,000.00 |
5,000.00 |
1.00 |
1.00 |
12,000.00 |
12,000.00 |
|
|
| 804-10 |
reloading test piles
|
1   |
EACH |
500.00 |
500.00 |
1.00 |
1.00 |
1,000.00 |
1,000.00 |
|
|
| 804-11 |
redriving test piles
|
1   |
EACH |
500.00 |
500.00 |
1.00 |
1.00 |
100.00 |
100.00 |
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
5,000.00 |
5,000.00 |
1.00 |
1.00 |
100.00 |
100.00 |
|
|
| 804-17 |
dynamic monitoring
|
3   |
EACH |
1,000.00 |
3,000.00 |
2,500.00 |
7,500.00 |
1,000.00 |
3,000.00 |
|
|
| 805-01-F |
class a concrete (bents)
|
97.63 |
CUYD |
1,200.00 |
117,156.00 |
1,300.00 |
126,919.00 |
1,585.00 |
154,743.55 |
|
|
| 805-03 |
class aa concrete
|
247.94 |
CUYD |
700.00 |
173,558.00 |
1,150.00 |
285,131.00 |
1,510.00 |
374,389.40 |
|
|
| 805-08-H |
precast-prestressed concrete girders (type quad beam)
|
1,896.0 |
LNFT |
125.00 |
237,000.00 |
138.00 |
261,648.00 |
154.00 |
291,984.00 |
|
|
| 805-11 |
strip seal joints
|
80.00 |
LNFT |
135.00 |
10,800.00 |
210.00 |
16,800.00 |
235.00 |
18,800.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
83,035   |
LB |
1.00 |
83,035.00 |
1.31 |
108,775.85 |
1.70 |
141,159.50 |
|
|
| 807-08 |
structural metalwork
|
lump |
LUMP |
5,000.00 |
5,000.00 |
13,000.00 |
13,000.00 |
10,000.00 |
10,000.00 |
|
|
| 810-01 |
concrete railing (barrier)
|
480.00 |
LNFT |
100.00 |
48,000.00 |
80.00 |
38,400.00 |
77.00 |
36,960.00 |
|
|
| 813-01 |
concrete approach slabs
|
363.88 |
SQYD |
210.00 |
76,414.80 |
245.00 |
89,150.60 |
290.00 |
105,525.20 |
|
|
| S-101 |
special anchor section
|
2   |
EACH |
10,000.00 |
20,000.00 |
2,000.00 |
4,000.00 |
1,400.00 |
2,800.00 |
|
|
| S-102 |
dynamic analysis
|
3   |
EACH |
10,000.00 |
30,000.00 |
2,500.00 |
7,500.00 |
1,200.00 |
3,600.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
4,611,617.80 |
|
4,718,056.05 |
|
4,826,802.00 |
|
|
|