| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARBER BROS. CONTRACTING CO., L.L.C |
- 2 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
50,000.00 |
50,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
50,000.00 |
50,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
1,820   |
SQYD |
35.00 |
63,700.00 |
14.00 |
25,480.00 |
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
361.1 |
LNFT |
10.00 |
3,611.00 |
14.00 |
5,055.40 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
3,245.3 |
SQYD |
6.00 |
19,471.80 |
29.00 |
94,113.70 |
|
|
|
|
| 202-02-J |
removal of existing signal equipment
|
lump |
LUMP |
3,000.00 |
3,000.00 |
2,500.00 |
2,500.00 |
|
|
|
|
| 203-01 |
general excavation
|
3,501   |
CUYD |
20.00 |
70,020.00 |
20.00 |
70,020.00 |
|
|
|
|
| 203-02 |
drainage excavation
|
815.0 |
CUYD |
15.00 |
12,225.00 |
10.00 |
8,150.00 |
|
|
|
|
| 203-03 |
embankment
|
1,237   |
CUYD |
35.00 |
43,295.00 |
40.00 |
49,480.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
294   |
EACH |
20.00 |
5,880.00 |
10.00 |
2,940.00 |
|
|
|
|
| 204-04 |
temporary sediment basins
|
1   |
EACH |
500.00 |
500.00 |
2,500.00 |
2,500.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
1   |
EACH |
300.00 |
300.00 |
250.00 |
250.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
3,161   |
LNFT |
2.00 |
6,322.00 |
1.40 |
4,425.40 |
|
|
|
|
| 302-02-F |
class ii base course (12" thick)(superpave asphaltic
concrete (level 1), stone or recycled portland cement concrete) |
7,328.7 |
SQYD |
45.00 |
329,791.50 |
70.00 |
513,009.00 |
|
|
|
|
| 304-01 |
lime
|
92.34 |
TON |
250.00 |
23,085.00 |
150.00 |
13,851.00 |
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
7,329   |
SQYD |
2.00 |
14,658.00 |
10.00 |
73,290.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
23.4 |
CUYD |
200.00 |
4,680.00 |
150.00 |
3,510.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
2,146.9 |
TON |
120.00 |
257,628.00 |
130.00 |
279,097.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
714.0 |
TON |
140.00 |
99,960.00 |
130.00 |
92,820.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
885   |
SQYD |
10.00 |
8,850.00 |
20.00 |
17,700.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 74   |
CUYD |
0.00 |
0.00 |
0.01 |
- 0.74 |
|
|
|
|
| 601-01-G |
portland cement concrete pavement (8" thick)
(crossovers & turnouts) |
508.8 |
SQYD |
100.00 |
50,880.00 |
100.00 |
50,880.00 |
|
|
|
|
| 701-03-F |
storm drain pipe (15" rcp/rpvcp)
|
574   |
LNFT |
60.00 |
34,440.00 |
85.00 |
48,790.00 |
|
|
|
|
| 701-03-G |
storm drain pipe (18" rcp/rpvcp)
|
524   |
LNFT |
72.00 |
37,728.00 |
95.00 |
49,780.00 |
|
|
|
|
| 701-03-I |
storm drain pipe (24" rcp/rpvcp)
|
322   |
LNFT |
95.00 |
30,590.00 |
100.00 |
32,200.00 |
|
|
|
|
| 701-03-K |
storm drain pipe (30" rcp/rpvcp)
|
48   |
LNFT |
120.00 |
5,760.00 |
120.00 |
5,760.00 |
|
|
|
|
| 701-03-M |
storm drain pipe (36" rcp/rpvcp)
|
60   |
LNFT |
160.00 |
9,600.00 |
145.00 |
8,700.00 |
|
|
|
|
| 701-03-N |
storm drain pipe (42" rcp/rpvcp)
|
26   |
LNFT |
200.00 |
5,200.00 |
170.00 |
4,420.00 |
|
|
|
|
| 701-03-O |
storm drain pipe (48" rcp/rpvcp)
|
426   |
LNFT |
250.00 |
106,500.00 |
220.00 |
93,720.00 |
|
|
|
|
| 701-04-B |
storm drain pipe arch (18" eq. rcpa)
|
40   |
LNFT |
100.00 |
4,000.00 |
120.00 |
4,800.00 |
|
|
|
|
| 701-04-D |
storm drain pipe arch (24"eq. rcpa)
|
6   |
LNFT |
175.00 |
1,050.00 |
210.00 |
1,260.00 |
|
|
|
|
| 701-04-E |
storm drain pipe arch (30"eq. rcpa)
|
276   |
LNFT |
160.00 |
44,160.00 |
150.00 |
41,400.00 |
|
|
|
|
| 701-04-G |
storm drain pipe arch (42"eq. rcpa)
|
104   |
LNFT |
200.00 |
20,800.00 |
210.00 |
21,840.00 |
|
|
|
|
| 701-04-H |
storm drain pipe arch (48"eq. rcpa)
|
374   |
LNFT |
300.00 |
112,200.00 |
275.00 |
102,850.00 |
|
|
|
|
| 701-05-G |
side drain pipe (18" rcp/rpvcp/cpepdw/bccsp (14 gage))
|
100   |
LNFT |
80.00 |
8,000.00 |
65.00 |
6,500.00 |
|
|
|
|
| 701-05-I |
side drain pipe (24" rcp/rpvcp/cpepdw/bccsp (14 gage))
|
26   |
LNFT |
100.00 |
2,600.00 |
75.00 |
1,950.00 |
|
|
|
|
| 701-05-O |
side drain pipe (48" rcp/rpvcp/cpepdw/bccsp (14 gage))
|
148   |
LNFT |
225.00 |
33,300.00 |
160.00 |
23,680.00 |
|
|
|
|
| 701-07-C |
yard drain pipe (8" pvc)
|
142   |
LNFT |
65.00 |
9,230.00 |
35.00 |
4,970.00 |
|
|
|
|
| 702-02-A |
manholes (mh-06)
|
1   |
EACH |
6,500.00 |
6,500.00 |
5,500.00 |
5,500.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
19   |
EACH |
2,800.00 |
53,200.00 |
2,700.00 |
51,300.00 |
|
|
|
|
| 702-03-C |
catch basins (cb-06)
|
13   |
EACH |
3,650.00 |
47,450.00 |
4,500.00 |
58,500.00 |
|
|
|
|
| 702-03-F |
catch basins (cb-08)
|
7   |
EACH |
7,000.00 |
49,000.00 |
7,500.00 |
52,500.00 |
|
|
|
|
| 702-03-H |
catch basins (cb-05)
|
7   |
EACH |
1,500.00 |
10,500.00 |
1,200.00 |
8,400.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
1,341.1 |
SQYD |
80.00 |
107,288.00 |
65.00 |
87,171.50 |
|
|
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
71.9 |
SQYD |
75.00 |
5,392.50 |
65.00 |
4,673.50 |
|
|
|
|
| 707-01 |
concrete curb
|
495.2 |
LNFT |
20.00 |
9,904.00 |
12.00 |
5,942.40 |
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
2,199.7 |
LNFT |
35.00 |
76,989.50 |
40.00 |
87,988.00 |
|
|
|
|
| 708-01 |
right-of-way monument
|
24   |
EACH |
200.00 |
4,800.00 |
450.00 |
10,800.00 |
|
|
|
|
| 710-01 |
flowable fill
|
16   |
CUYD |
150.00 |
2,400.00 |
220.00 |
3,520.00 |
|
|
|
|
| 711-01-C |
riprap (30 lb, 14" thick)
|
15   |
SQYD |
150.00 |
2,250.00 |
85.00 |
1,275.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
75,000.00 |
75,000.00 |
200,000.00 |
200,000.00 |
|
|
|
|
| 713-02-A |
temporary pavement markings (4" width)
|
3,786   |
LNFT |
0.20 |
757.20 |
0.15 |
567.90 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
0.358 |
MILE |
1,200.00 |
429.60 |
600.00 |
214.80 |
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
15,000.00 |
15,000.00 |
12,000.00 |
12,000.00 |
|
|
|
|
| 726-01 |
bedding material
|
401.5 |
CUYD |
75.00 |
30,112.50 |
80.00 |
32,120.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
75,000.00 |
75,000.00 |
340,000.00 |
340,000.00 |
|
|
|
|
| 728-01-A |
jacked or bored pipe (36" rcp)
|
172.0 |
LNFT |
1,000.00 |
172,000.00 |
700.00 |
120,400.00 |
|
|
|
|
| 729-01 |
sign (type a)
|
37.0 |
SQFT |
30.00 |
1,110.00 |
37.00 |
1,369.00 |
|
|
|
|
| 729-08-A |
mounting (2 1/2" post)
|
2   |
EACH |
1,500.00 |
3,000.00 |
1,000.00 |
2,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
617   |
EACH |
6.00 |
3,702.00 |
5.00 |
3,085.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
1.345 |
MILE |
3,500.00 |
4,707.50 |
2,900.00 |
3,900.50 |
|
|
|
|
| 732-02-C |
plastic pavement striping (solid line) (8" witdh)
|
0.140 |
MILE |
6,800.00 |
952.00 |
5,900.00 |
826.00 |
|
|
|
|
| 732-02-E |
plastic pavement striping (solid line) (24" width)
|
0.098 |
MILE |
25,000.00 |
2,450.00 |
17,900.00 |
1,754.20 |
|
|
|
|
| 732-03-C |
plastic pavement striping (broken line) (8" width)
|
0.168 |
MILE |
1,800.00 |
302.40 |
1,400.00 |
235.20 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
12   |
EACH |
200.00 |
2,400.00 |
175.00 |
2,100.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
8   |
EACH |
250.00 |
2,000.00 |
210.00 |
1,680.00 |
|
|
|
|
| 735-01 |
mailboxes
|
7   |
EACH |
2.00 |
14.00 |
5.00 |
35.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
7   |
EACH |
100.00 |
700.00 |
100.00 |
700.00 |
|
|
|
|
| 736-01 |
trenching and backfilling
|
775   |
LNFT |
7.50 |
5,812.50 |
6.50 |
5,037.50 |
|
|
|
|
| 736-03-A |
jacked or bored conduit (1/2" p.e.c.)
|
35   |
LNFT |
25.00 |
875.00 |
17.00 |
595.00 |
|
|
|
|
| 736-03-B |
jacked or bored conduit (2" p.e.c.)
|
50   |
LNFT |
25.00 |
1,250.00 |
17.25 |
862.50 |
|
|
|
|
| 736-03-C |
jacked or bored conduit (3" p.e.c.)
|
395   |
LNFT |
25.00 |
9,875.00 |
19.35 |
7,643.25 |
|
|
|
|
| 736-04-B |
signal support, (mast arm standard w/35' arm)
|
2   |
EACH |
12,000.00 |
24,000.00 |
11,000.00 |
22,000.00 |
|
|
|
|
| 736-04-C |
signal support, (mast arm standard w/45' arm)
|
1   |
EACH |
14,000.00 |
14,000.00 |
12,000.00 |
12,000.00 |
|
|
|
|
| 736-04-D |
signal support, (mast arm standard w/50' arm)
|
1   |
EACH |
16,000.00 |
16,000.00 |
13,000.00 |
13,000.00 |
|
|
|
|
| 736-05-A |
signal heads (3-section,r,y,g) l.e.d.
|
4   |
EACH |
900.00 |
3,600.00 |
800.00 |
3,200.00 |
|
|
|
|
| 736-05-B |
signal heads (3-section,r,lty,ltg) l.e.d.
|
2   |
EACH |
800.00 |
1,600.00 |
700.00 |
1,400.00 |
|
|
|
|
| 736-05-C |
signal heads (5-section,r,lty,y,ltg,g) l.e.d.
|
2   |
EACH |
1,400.00 |
2,800.00 |
1,200.00 |
2,400.00 |
|
|
|
|
| 736-05-D |
signal heads (5-section,r,rty,y,rtg,g) l.e.d.
|
2   |
EACH |
1,400.00 |
2,800.00 |
1,200.00 |
2,400.00 |
|
|
|
|
| 736-08 |
signal controller
|
1   |
EACH |
30,000.00 |
30,000.00 |
23,000.00 |
23,000.00 |
|
|
|
|
| 736-09 |
loop detectors
|
190   |
LNFT |
15.00 |
2,850.00 |
10.00 |
1,900.00 |
|
|
|
|
| 736-10-A |
underground junction box, type "e"
|
6   |
EACH |
500.00 |
3,000.00 |
350.00 |
2,100.00 |
|
|
|
|
| 736-10-B |
undergound junction box, type "f"
|
5   |
EACH |
450.00 |
2,250.00 |
375.00 |
1,875.00 |
|
|
|
|
| 736-11-A |
conduit (2" p.e.c. schedule 80)
|
775   |
LNFT |
6.00 |
4,650.00 |
5.00 |
3,875.00 |
|
|
|
|
| 736-12-A |
conductor, 2c (loop lead-in)
|
2,030   |
LNFT |
1.50 |
3,045.00 |
1.30 |
2,639.00 |
|
|
|
|
| 736-12-B |
conductor, 3c (power)
|
35   |
LNFT |
2.00 |
70.00 |
1.25 |
43.75 |
|
|
|
|
| 736-12-C |
conductor, 6c (signal)
|
385   |
LNFT |
2.00 |
770.00 |
1.65 |
635.25 |
|
|
|
|
| 736-12-D |
conductor, 10c (signal)
|
1,500   |
LNFT |
2.20 |
3,300.00 |
1.80 |
2,700.00 |
|
|
|
|
| 739-01 |
hydro-seeding
|
1.60 |
ACRE |
2,000.00 |
3,200.00 |
1,250.00 |
2,000.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
30,000.00 |
30,000.00 |
60,000.00 |
60,000.00 |
|
|
|
|
| S-001 |
saw cutting
|
334.5 |
LNFT |
15.00 |
5,017.50 |
12.00 |
4,014.00 |
|
|
|
|
| S-002 |
video detection system
|
1   |
EACH |
5,000.00 |
5,000.00 |
4,000.00 |
4,000.00 |
|
|
|
|
| S-003 |
video detector device and connection
|
4   |
EACH |
7,500.00 |
30,000.00 |
6,700.00 |
26,800.00 |
|
|
|
|
| S-004 |
relocate light standards
|
2   |
EACH |
5,000.00 |
10,000.00 |
3,800.00 |
7,600.00 |
|
|
|
|
| S-005 |
separator curb & vertical markers
|
297   |
LNFT |
100.00 |
29,700.00 |
75.00 |
22,275.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,593,791.50 |
|
3,118,244.01 |
|
|
|
|
|