| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - HUEY STOCKSTILL, INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
208   |
LNFT |
1.00 |
208.00 |
7.50 |
1,560.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
1,085   |
CUYD |
10.00 |
10,850.00 |
15.70 |
17,034.50 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
26,748.5 |
TON |
82.00 |
2,193,377.00 |
90.00 |
2,407,365.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
778.9 |
TON |
100.00 |
77,890.00 |
137.00 |
106,709.30 |
|
|
|
|
| 510-01-A |
pavement patching (6" minimum thickness)
|
750   |
SQYD |
40.00 |
30,000.00 |
50.00 |
37,500.00 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
1,000   |
SQYD |
70.00 |
70,000.00 |
70.00 |
70,000.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
50.0 |
LNFT |
10.00 |
500.00 |
23.00 |
1,150.00 |
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
50.0 |
LNFT |
65.00 |
3,250.00 |
36.00 |
1,800.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
70.00 |
7,000.00 |
65.00 |
6,500.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,200.00 |
8,800.00 |
2,300.00 |
9,200.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
300,000.00 |
300,000.00 |
37,000.00 |
37,000.00 |
|
|
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
120   |
LNFT |
0.10 |
12.00 |
0.70 |
84.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
17.680 |
MILE |
100.00 |
1,768.00 |
170.00 |
3,005.60 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
10.760 |
MILE |
0.10 |
1.08 |
10.00 |
107.60 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
55.560 |
MILE |
0.10 |
5.56 |
10.00 |
555.60 |
|
|
|
|
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
9   |
EACH |
0.10 |
0.90 |
10.00 |
90.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
300,000.00 |
300,000.00 |
314,000.00 |
314,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
49   |
EACH |
25.00 |
1,225.00 |
65.00 |
3,185.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
50.00 |
200.00 |
80.00 |
320.00 |
|
|
|
|
| 729-19-C |
dead end road installations(type c)
|
12   |
EACH |
470.00 |
5,640.00 |
500.00 |
6,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,569   |
EACH |
5.00 |
7,845.00 |
5.00 |
7,845.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
40   |
LNFT |
3.25 |
130.00 |
9.00 |
360.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
27.780 |
MILE |
2,690.00 |
74,728.20 |
2,600.00 |
72,228.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
5.580 |
MILE |
650.00 |
3,627.00 |
600.00 |
3,348.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
1   |
EACH |
195.00 |
195.00 |
500.00 |
500.00 |
|
|
|
|
| 735-01 |
mailboxes
|
218   |
EACH |
1.00 |
218.00 |
8.00 |
1,744.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
152   |
EACH |
110.00 |
16,720.00 |
140.00 |
21,280.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
15   |
EACH |
160.00 |
2,400.00 |
219.00 |
3,285.00 |
|
|
|
|
| 735-04 |
mailbox supports (multiple)
|
12   |
EACH |
270.00 |
3,240.00 |
350.00 |
4,200.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
39,000.00 |
39,000.00 |
6,000.00 |
6,000.00 |
|
|
|
|
| S-001 |
surface preparation
|
185,376.8 |
SQYD |
0.01 |
1,853.77 |
0.40 |
74,150.72 |
|
|
|
|
| S-002 |
sawcutting in asphaltic concrete patches (6" thick)
|
1,703.5 |
LNFT |
0.10 |
170.35 |
3.20 |
5,451.20 |
|
|
|
|
| S-003 |
sawcutting in asphaltic concrete patches (12" thick)
|
1,524.0 |
LNFT |
0.10 |
152.40 |
14.00 |
21,336.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,161,007.26 |
|
3,244,894.52 |
|
|
|
|
|