Error processing SSI file
Error processing SSI file
Bid Tabs Error processing SSI file
Bid Tabulations Error processing SSI file
February 06, 2014 Error processing SSI file

Letting of 9/24/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 083-06-0042
Parish: WEBSTER
Routes: LA 2
Description: SIKES FERRY TO SHONGALOO
Type Const: grading, pavement patching, superpave asphaltic concrete pavement, and related work
Estimated Construction Cost: $2,522,913.90
 
RankLicenseBidderConstruction Bid
1 08584 MADDEN CONTRACTING CO., INC. $2,220,093.20
 
Item Number Item Description Quantity Unit of Measure - 1 -
MADDEN CONTRACTING CO., INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 6      SQYD 50.00 300.00            
202-02-I removal of concrete pipe headwalls 2      EACH 750.00 1,500.00            
203-05 excavation and embankment lump      LUMP 1,000.00 1,000.00            
203-07 borrow (vehicular measurement) 8,000      CUYD 14.30 114,400.00            
401-02 aggregate surface course (adjusted vehicular
measurement)
300      CUYD 72.00 21,600.00            
502-01 superpave asphaltic concrete 15,083.8    TON 114.15 1,721,815.77            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
500.0    TON 50.00 25,000.00            
510-01-A pavement patching (6" minimum thickness) 1,000      SQYD 58.60 58,600.00            
701-10-K reinforced concrete pipe (extension)(30") 20      LNFT 215.00 4,300.00            
701-15 concrete collar 2      EACH 300.00 600.00            
713-01 temporary signs & barricades lump      LUMP 84,500.00 84,500.00            
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
9.998  MILE 325.00 3,249.35            
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
3.960  MILE 1.00 3.96            
713-04-A temporary pavement markings (solid line)(4" width) 34.120  MILE 1.00 34.12            
716-01-A mulch (vegetative) 21.2    TON 600.00 12,720.00            
727-01 mobilization lump      LUMP 84,500.00 84,500.00            
731-02 reflectorized raised pavement markers 660      EACH 4.50 2,970.00            
732-01-E plastic pavement striping (24" width) 60      LNFT 3.00 180.00            
732-02-A plastic pavement striping (solid line) (4" width) 17.060  MILE 2,300.00 39,238.00            
732-03-A plastic pavement striping (broken line)(4" width) 1.980  MILE 600.00 1,188.00            
735-01 mailboxes 24      EACH 1.00 24.00            
735-02 mailbox supports (single) 20      EACH 141.00 2,820.00            
735-03 mailbox supports (double) 2      EACH 175.00 350.00            
739-01 hydro-seeding 12.20   ACRE 1,200.00 14,640.00            
740-01 construction layout lump      LUMP 24,000.00 24,000.00            
S-001 saw cutting concrete drives 16      LNFT 35.00 560.00            
                       
 CONTRACTOR TOTAL       2,220,093.20            

Error processing SSI file