Letting of 9/24/2008 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 066-01-0043
Parish: VERNON
Routes: LA 467
Description: LA. 467 ROADWAY SAFETY PROJECT
Type Const: grading, class ii base course, portland cement concrete pavement, and related work.
Estimated Construction Cost: $229,906.64
 
RankLicenseBidderConstruction Bid
1 39104 RMK CONSTRUCTION CO. LLC $159,927.70
2 21982 FORBY CONTRACTING, INC. $208,405.90
3 46547 INTERSTATE IMPROVEMENT, INC. $583,214.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
RMK CONSTRUCTION CO. LLC
- 2 -
FORBY CONTRACTING, INC.
- 3 -
INTERSTATE IMPROVEMENT, INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 500.00 500.00 1,000.00 1,000.00 5,000.00 5,000.00    
202-02-C removal of portland cement concrete pavement 630      SQYD 5.00 3,150.00 20.00 12,600.00 30.00 18,900.00    
202-02-D removal of concrete walks & drives 225      SQYD 4.00 900.00 10.00 2,250.00 15.00 3,375.00    
202-02-G removal of surfacing & stabilized base 630.4    SQYD 5.00 3,152.00 15.00 9,456.00 20.00 12,608.00    
203-05 excavation and embankment lump      LUMP 10,500.00 10,500.00 5,000.00 5,000.00 50,000.00 50,000.00    
204-06 temporary silt fencing 380      LNFT 2.50 950.00 3.00 1,140.00 1.25 475.00    
302-02-D-01 class ii base course (8 1/2" thick) (crushed stone
only)
916.0    SQYD 40.00 36,640.00 35.00 32,060.00 75.00 68,700.00    
402-01 traffic maintenance aggregate (vehicular measurement) 100.0    CUYD 5.00 500.00 10.00 1,000.00 55.40 5,540.00    
601-02-K portland cement concrete pavement (10" thick)
(crossovers & turnouts)
872.9    SQYD 59.00 51,501.10 95.00 82,925.50 250.00 218,225.00    
702-04-B adjusting catch basins 1      EACH 2,500.00 2,500.00 2,500.00 2,500.00 10,000.00 10,000.00    
706-02-C concrete drive (6" thick) 110.0    SQYD 43.00 4,730.00 80.00 8,800.00 150.00 16,500.00    
707-01 concrete curb 295.6    LNFT 6.00 1,773.60 15.00 4,434.00 35.00 10,346.00    
708-01 right-of-way monument 5      EACH 80.00 400.00 250.00 1,250.00 150.00 750.00    
708-02 right-of-way monument witness post 5      EACH 80.00 400.00 100.00 500.00 50.00 250.00    
713-01 temporary signs & barricades lump      LUMP 10,500.00 10,500.00 10,000.00 10,000.00 35,000.00 35,000.00    
713-02-A temporary pavement markings (4" width) 1,322      LNFT 1.00 1,322.00 1.20 1,586.40 1.00 1,322.00    
727-01 mobilization lump      LUMP 14,000.00 14,000.00 22,500.00 22,500.00 100,000.00 100,000.00    
731-02 reflectorized raised pavement markers 4      EACH 45.00 180.00 30.00 120.00 50.00 200.00    
732-01-A plastic pavement striping (4" width) 692      LNFT 3.00 2,076.00 2.75 1,903.00 10.00 6,920.00    
732-01-E plastic pavement striping (24" width) 12      LNFT 21.00 252.00 19.75 237.00 30.00 360.00    
739-01 hydro-seeding 0.13   ACRE 2,900.00 377.00 4,000.00 520.00 5,000.00 650.00    
740-01 construction layout lump      LUMP 9,500.00 9,500.00 2,500.00 2,500.00 15,000.00 15,000.00    
S-001 full depth sawcuts in portland cement concrete
pavement
2,062      INFT 2.00 4,124.00 2.00 4,124.00 1.50 3,093.00    
                       
 CONTRACTOR TOTAL       159,927.70   208,405.90   583,214.00    