Letting of 9/24/2008 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 040-01-0031
Parish: GRANT
Routes: LA 8
Description: JCT. LA 123 - JCT. US 167
Type Const: cold planing asphaltic concrete, pavement patching, superpave asphaltic concrete
overlay, and related work.
Estimated Construction Cost: $2,986,071.74
 
RankLicenseBidderConstruction Bid
1 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $2,240,464.49
2 05789 D & J CONSTRUCTION CO., INC. $2,355,876.45
3 12312 GILCHRIST CONSTRUCTION CO. LLC $2,722,474.40
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
D & J CONSTRUCTION CO., INC.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
401-02 aggregate surface course (adjusted vehicular
measurement)
6,101      CUYD 35.00 213,535.00 30.00 183,030.00 85.00 518,585.00    
502-01 superpave asphaltic concrete 14,270.2    TON 94.00 1,341,398.80 110.00 1,569,722.00 100.00 1,427,020.00    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
2,893.8    TON 123.00 355,937.40 110.00 318,318.00 145.00 419,601.00    
509-01 cold planing asphaltic pavement 534      SQYD 21.00 11,214.00 16.00 8,544.00 15.00 8,010.00    
509-02 contractor retained reclaimed asphaltic pavement - 30      CUYD 0.10 - 3.00 0.01 - 0.30 1.00 - 30.00    
510-01-B pavement patching (12" minimum thickness) 250      SQYD 125.00 31,250.00 200.00 50,000.00 160.00 40,000.00    
713-01 temporary signs & barricades lump      LUMP 25,500.00 25,500.00 11,000.00 11,000.00 25,000.00 25,000.00    
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
7.433  MILE 140.00 1,040.62 250.00 1,858.25 450.00 3,344.85    
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
4.731  MILE 265.00 1,253.72 200.00 946.20 450.00 2,128.95    
713-04-A temporary pavement markings (solid line)(4" width) 22.652  MILE 420.00 9,513.84 1.00 22.65 100.00 2,265.20    
716-01-A mulch (vegetative) 1.0    TON 460.00 460.00 650.00 650.00 600.00 600.00    
717-01 seeding 15      LB 13.00 195.00 12.00 180.00 20.00 300.00    
718-01 fertilizer 500      LB 1.10 550.00 1.00 500.00 1.50 750.00    
727-01 mobilization lump      LUMP 150,000.00 150,000.00 137,000.00 137,000.00 100,000.00 100,000.00    
731-02 reflectorized raised pavement markers 981      EACH 5.00 4,905.00 6.00 5,886.00 6.50 6,376.50    
735-01 mailboxes 90      EACH 1.00 90.00 1.00 90.00 5.00 450.00    
735-02 mailbox supports (single) 74      EACH 100.00 7,400.00 125.00 9,250.00 150.00 11,100.00    
735-03 mailbox supports (double) 11      EACH 150.00 1,650.00 200.00 2,200.00 250.00 2,750.00    
735-04 mailbox supports (multiple) 1      EACH 300.00 300.00 350.00 350.00 400.00 400.00    
737-01-A painted traffic striping (solid line)(4" width) 22.652  MILE 625.00 14,157.50 650.00 14,723.80 1,200.00 27,182.40    
737-02-A painted traffic striping (broken line)(4" width) 4.731  MILE 310.00 1,466.61 350.00 1,655.85 500.00 2,365.50    
740-01 construction layout lump      LUMP 16,000.00 16,000.00 12,000.00 12,000.00 15,000.00 15,000.00    
S-001 saw cutting 5,300      INFT 0.50 2,650.00 1.50 7,950.00 1.75 9,275.00    
S-002 surface preparation lump      LUMP 50,000.00 50,000.00 20,000.00 20,000.00 100,000.00 100,000.00    
                       
 CONTRACTOR TOTAL       2,240,464.49   2,355,876.45   2,722,474.40    