Letting of 9/24/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 037-04-0016
Parish: E CARROLL
Routes: LA 2
Description: WEST CARROLL P\L - US 65
Type Const: grading, cold planing asphaltic concrete, pavement patching, superpave asphaltic
concrete pavement, and related work.
Estimated Construction Cost: $3,592,259.68
 
RankLicenseBidderConstruction Bid
1 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $2,656,759.40
2 05789 D & J CONSTRUCTION CO., INC. $2,749,280.84
3 47347 KIEWIT LOUISIANA CO $4,116,960.54
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
D & J CONSTRUCTION CO., INC.
- 3 -
KIEWIT LOUISIANA CO

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 244      LNFT 14.00 3,416.00 12.00 2,928.00 10.00 2,440.00    
203-07 borrow (vehicular measurement) 500      CUYD 24.00 12,000.00 30.00 15,000.00 50.00 25,000.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
2,925      CUYD 27.00 78,975.00 15.00 43,875.00 90.00 263,250.00    
502-01 superpave asphaltic concrete 18,872.2    TON 100.00 1,887,220.00 112.00 2,113,686.40 125.00 2,359,025.00    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
866.5    TON 165.00 142,972.50 112.00 97,048.00 150.39 130,312.94    
509-01 cold planing asphaltic pavement 98,818      SQYD 1.10 108,699.80 1.00 98,818.00 4.00 395,272.00    
509-02 contractor retained reclaimed asphaltic pavement - 4,124      CUYD 0.10 - 412.40 0.10 - 412.40 0.01 - 41.24    
510-01-B pavement patching (12" minimum thickness) 1,782      SQYD 98.00 174,636.00 110.00 196,020.00 150.00 267,300.00    
704-03 blocked out guard rail 100.1    LNFT 23.00 2,302.30 22.00 2,202.20 20.00 2,002.00    
704-07-A guard rail bridge attachments (single thrie beam) 25.0    LNFT 50.00 1,250.00 48.00 1,200.00 31.00 775.00    
704-08-B guard rail transitions (double thrie beam) 50.0    LNFT 64.00 3,200.00 62.00 3,100.00 40.00 2,000.00    
704-11-A guard rail end treatment (flared) 2      EACH 2,600.00 5,200.00 2,500.00 5,000.00 1,600.00 3,200.00    
713-01 temporary signs & barricades lump      LUMP 12,000.00 12,000.00 11,000.00 11,000.00 84,000.00 84,000.00    
713-02-E temporary pavement markings (24" width) 562      LNFT 0.65 365.30 3.00 1,686.00 4.25 2,388.50    
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
13.890  MILE 145.00 2,014.05 250.00 3,472.50 564.00 7,833.96    
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
13.288  MILE 260.00 3,454.88 200.00 2,657.60 268.00 3,561.18    
713-04-A temporary pavement markings (solid line)(4" width) 30.238  MILE 423.00 12,790.67 1.00 30.24 429.00 12,972.10    
716-01-A mulch (vegetative) 27.0    TON 365.00 9,855.00 350.00 9,450.00 650.00 17,550.00    
717-01 seeding 603      LB 7.45 4,492.35 7.00 4,221.00 7.50 4,522.50    
718-01 fertilizer 13,390      LB 0.55 7,364.50 0.50 6,695.00 0.35 4,686.50    
727-01 mobilization lump      LUMP 112,000.00 112,000.00 52,000.00 52,000.00 400,000.00 400,000.00    
729-16-C object marker assembly (type 3) 2      EACH 85.00 170.00 80.00 160.00 75.00 150.00    
731-02 reflectorized raised pavement markers 1,258      EACH 5.00 6,290.00 6.00 7,548.00 6.00 7,548.00    
732-01-E plastic pavement striping (24" width) 281      LNFT 3.25 913.25 9.00 2,529.00 15.00 4,215.00    
732-02-A plastic pavement striping (solid line) (4" width) 15.119  MILE 2,400.00 36,285.60 2,100.00 31,749.90 2,500.00 37,797.50    
732-03-A plastic pavement striping (broken line)(4" width) 6.644  MILE 650.00 4,318.60 1,100.00 7,308.40 900.00 5,979.60    
735-01 mailboxes 16      EACH 1.00 16.00 1.00 16.00 105.00 1,680.00    
735-02 mailbox supports (single) 10      EACH 155.00 1,550.00 155.00 1,550.00 150.00 1,500.00    
735-03 mailbox supports (double) 1      EACH 185.00 185.00 200.00 200.00 250.00 250.00    
735-04 mailbox supports (multiple) 1      EACH 345.00 345.00 350.00 350.00 390.00 390.00    
740-01 construction layout lump      LUMP 14,000.00 14,000.00 16,000.00 16,000.00 44,000.00 44,000.00    
S-001 saw cutting asphaltic concrete patches (12" deep) 5,080      LNFT 1.75 8,890.00 2.40 12,192.00 5.00 25,400.00    
                       
 CONTRACTOR TOTAL       2,656,759.40   2,749,280.84   4,116,960.54    