Letting of 9/24/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 022-05-0053
Parish: LASALLE
Routes: US 84
Description: DISTRICT 58 MICROSURFACING PROJECTS
Type Const: microsurfing, cold planing, superpave ashaltic concrete wear ing course, ashaltic
surface treatment, and related work.
Estimated Construction Cost: $2,432,513.41
 
RankLicenseBidderConstruction Bid
1 32934 VANCE BROTHERS INC $2,255,421.56
2 05789 D & J CONSTRUCTION CO., INC. $3,020,448.63
 
Item Number Item Description Quantity Unit of Measure - 1 -
VANCE BROTHERS INC
- 2 -
D & J CONSTRUCTION CO., INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
502-01 superpave asphaltic concrete 1,432.8    TON 148.50 212,770.80 135.00 193,428.00        
507-01-A asphaltic material (crs-2p emulsion) 10,379      GAL 4.40 45,667.60 4.50 46,705.50        
507-02-B aggregate (s2) 25,314      SQYD 2.10 53,159.40 1.50 37,971.00        
509-01 cold planing asphaltic pavement 38,342      SQYD 1.54 59,046.68 2.00 76,684.00        
509-02 contractor retained reclaimed asphaltic pavement - 538      CUYD 0.00 0.00 0.01 - 5.38        
713-01 temporary signs & barricades lump      LUMP 20,500.00 20,500.00 61,000.00 61,000.00        
713-02-C temporary pavement markings (8" width) 600      LNFT 1.10 660.00 1.60 960.00        
713-02-E temporary pavement markings (24" width) 1,600      LNFT 1.65 2,640.00 3.10 4,960.00        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
38.727  MILE 275.00 10,649.93 250.00 9,681.75        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
34.378  MILE 330.00 11,344.74 225.00 7,735.05        
713-04-A temporary pavement markings (solid line)(4" width) 90.426  MILE 363.00 32,824.64 260.00 23,510.76        
713-05-A temporary pavement legends and symbols (arrow) 6      EACH 110.00 660.00 150.00 900.00        
713-05-C temporary pavement legends and symbols (only) 6      EACH 110.00 660.00 150.00 900.00        
713-06-A temporary reflectorized raised pavement markers (tabs) 458      EACH 1.65 755.70 1.70 778.60        
727-01 mobilization lump      LUMP 38,200.00 38,200.00 300,000.00 300,000.00        
731-02 reflectorized raised pavement markers 2,318      EACH 4.27 9,897.86 6.00 13,908.00        
732-01-C plastic pavement striping (8" width) 300      LNFT 1.10 330.00 4.00 1,200.00        
732-01-E plastic pavement striping (24" width) 800      LNFT 3.30 2,640.00 6.00 4,800.00        
732-02-A plastic pavement striping (solid line) (4" width) 40.124  MILE 2,207.04 88,555.27 2,200.00 88,272.80        
732-03-A plastic pavement striping (broken line)(4" width) 15.758  MILE 550.00 8,666.90 900.00 14,182.20        
732-04-A plastic pavement legends & symbols (arrow) 3      EACH 275.00 825.00 400.00 1,200.00        
732-04-C plastic pavement legends & symbols (only) 3      EACH 275.00 825.00 500.00 1,500.00        
732-05 removal of existing markings 17.146  MILE 2,640.00 45,265.44 3,100.00 53,152.60        
740-01 construction layout lump      LUMP 8,250.00 8,250.00 22,000.00 22,000.00        
S-001 microsurfacing aggregate 6,199.8    TON 139.62 865,616.08 200.00 1,239,960.00        
S-002 microsurfacing asphalt 129,930.2    GAL 5.58 725,010.52 6.25 812,063.75        
S-003 rumble strips by location (a.s.t.) 1      EACH 10,000.00 10,000.00 3,000.00 3,000.00        
                       
 CONTRACTOR TOTAL       2,255,421.56   3,020,448.63        