| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - HUEY STOCKSTILL, INC. |
- 2 - BARRIERE CONSTRUCTION CO., LLC. |
- 3 - BOH BROS. CONSTRUCTION CO., LLC. |
- 4 - DIAMOND B CONSTRUCTION CO., L.L.C. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
208   |
LNFT |
7.00 |
1,456.00 |
12.00 |
2,496.00 |
7.00 |
1,456.00 |
21.00 |
4,368.00 |
| 203-07 |
borrow (vehicular measurement)
|
978   |
CUYD |
27.00 |
26,406.00 |
20.00 |
19,560.00 |
25.00 |
24,450.00 |
28.00 |
27,384.00 |
| 204-02 |
temporary hay or straw bales
|
30   |
EACH |
15.00 |
450.00 |
9.00 |
270.00 |
15.00 |
450.00 |
19.00 |
570.00 |
| 204-06 |
temporary silt fencing
|
3,062   |
LNFT |
5.00 |
15,310.00 |
2.50 |
7,655.00 |
2.00 |
6,124.00 |
2.00 |
6,124.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,645   |
CUYD |
62.00 |
101,990.00 |
77.00 |
126,665.00 |
45.00 |
74,025.00 |
88.00 |
144,760.00 |
| 502-01 |
superpave asphaltic concrete
|
13,765.0 |
TON |
100.00 |
1,376,500.00 |
109.00 |
1,500,385.00 |
115.00 |
1,582,975.00 |
135.00 |
1,858,275.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,556.5 |
TON |
130.00 |
202,345.00 |
109.00 |
169,658.50 |
115.00 |
178,997.50 |
210.00 |
326,865.00 |
| 509-01 |
cold planing asphaltic pavement
|
71,355   |
SQYD |
1.50 |
107,032.50 |
3.50 |
249,742.50 |
2.00 |
142,710.00 |
2.10 |
149,845.50 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 991   |
CUYD |
0.00 |
0.00 |
10.00 |
- 9,910.00 |
10.00 |
- 9,910.00 |
0.10 |
- 99.10 |
| 510-01-B |
pavement patching (12" minimum thickness)
|
1,503   |
SQYD |
97.00 |
145,791.00 |
80.00 |
120,240.00 |
150.00 |
225,450.00 |
131.00 |
196,893.00 |
| 510-02 |
pavement widening
|
1,734.2 |
SQYD |
69.00 |
119,659.80 |
66.00 |
114,457.20 |
120.00 |
208,104.00 |
111.00 |
192,496.20 |
| 702-04-A |
adjusting manholes
|
4   |
EACH |
346.00 |
1,384.00 |
500.00 |
2,000.00 |
700.00 |
2,800.00 |
450.00 |
1,800.00 |
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
337.5 |
LNFT |
56.00 |
18,900.00 |
80.00 |
27,000.00 |
55.00 |
18,562.50 |
65.00 |
21,937.50 |
| 704-03 |
blocked out guard rail
|
237.5 |
LNFT |
21.00 |
4,987.50 |
23.00 |
5,462.50 |
22.00 |
5,225.00 |
25.00 |
5,937.50 |
| 704-11-A |
guard rail end treatment (flared)
|
8   |
EACH |
2,200.00 |
17,600.00 |
2,500.00 |
20,000.00 |
2,300.00 |
18,400.00 |
2,800.00 |
22,400.00 |
| 706-02 |
concrete drive (6" thick)
|
155.6 |
SQYD |
50.00 |
7,780.00 |
85.00 |
13,226.00 |
85.00 |
13,226.00 |
62.00 |
9,647.20 |
| 707-03 |
combination concrete curb & gutter
|
2,450.0 |
LNFT |
16.00 |
39,200.00 |
25.00 |
61,250.00 |
35.00 |
85,750.00 |
20.00 |
49,000.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
100,000.00 |
100,000.00 |
140,000.00 |
140,000.00 |
75,000.00 |
75,000.00 |
25,000.00 |
25,000.00 |
| 713-02-A |
temporary pavement markings (4" width)
|
1,260   |
LNFT |
0.15 |
189.00 |
0.15 |
189.00 |
0.15 |
189.00 |
0.20 |
252.00 |
| 713-02-C |
temporary pavement markings (8" width)
|
1,953   |
LNFT |
0.25 |
488.25 |
0.25 |
488.25 |
0.25 |
488.25 |
0.35 |
683.55 |
| 713-02-E |
temporary pavement markings (24" width)
|
1,575   |
LNFT |
0.75 |
1,181.25 |
0.75 |
1,181.25 |
0.75 |
1,181.25 |
1.00 |
1,575.00 |
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
15.030 |
MILE |
160.00 |
2,404.80 |
180.00 |
2,705.40 |
20.00 |
300.60 |
161.00 |
2,419.83 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
5.760 |
MILE |
300.00 |
1,728.00 |
20.00 |
115.20 |
10.00 |
57.60 |
350.00 |
2,016.00 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
40.470 |
MILE |
450.00 |
18,211.50 |
40.00 |
1,618.80 |
25.00 |
1,011.75 |
540.00 |
21,853.80 |
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
15   |
EACH |
50.00 |
750.00 |
50.00 |
750.00 |
10.00 |
150.00 |
64.00 |
960.00 |
| 713-05-C |
temporary pavement legends and symbols (only)
|
6   |
EACH |
50.00 |
300.00 |
50.00 |
300.00 |
10.00 |
60.00 |
64.00 |
384.00 |
| 713-05-D |
temporary pavement legends and symbols (rr crossing)
|
6   |
EACH |
100.00 |
600.00 |
100.00 |
600.00 |
10.00 |
60.00 |
127.00 |
762.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
270,000.00 |
270,000.00 |
170,000.00 |
170,000.00 |
300,000.00 |
300,000.00 |
150,000.00 |
150,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
36   |
EACH |
75.00 |
2,700.00 |
90.00 |
3,240.00 |
75.00 |
2,700.00 |
94.00 |
3,384.00 |
| 729-19-A |
dead end road installations(type a)
|
1   |
EACH |
1,500.00 |
1,500.00 |
1,600.00 |
1,600.00 |
1,500.00 |
1,500.00 |
2,000.00 |
2,000.00 |
| 731-02 |
reflectorized raised pavement markers
|
865   |
EACH |
5.00 |
4,325.00 |
5.40 |
4,671.00 |
5.00 |
4,325.00 |
7.00 |
6,055.00 |
| 732-01-A |
plastic pavement striping (4" width)
|
420   |
LNFT |
0.45 |
189.00 |
1.00 |
420.00 |
0.50 |
210.00 |
0.55 |
231.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
651   |
LNFT |
0.85 |
553.35 |
2.00 |
1,302.00 |
1.00 |
651.00 |
1.10 |
716.10 |
| 732-01-E |
plastic pavement striping (24" width)
|
525   |
LNFT |
3.20 |
1,680.00 |
6.00 |
3,150.00 |
3.00 |
1,575.00 |
4.00 |
2,100.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
13.490 |
MILE |
2,600.00 |
35,074.00 |
2,800.00 |
37,772.00 |
2,500.00 |
33,725.00 |
3,200.00 |
43,168.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.920 |
MILE |
700.00 |
1,344.00 |
800.00 |
1,536.00 |
700.00 |
1,344.00 |
900.00 |
1,728.00 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
5   |
EACH |
200.00 |
1,000.00 |
250.00 |
1,250.00 |
200.00 |
1,000.00 |
250.00 |
1,250.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
2   |
EACH |
230.00 |
460.00 |
300.00 |
600.00 |
250.00 |
500.00 |
290.00 |
580.00 |
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
2   |
EACH |
400.00 |
800.00 |
500.00 |
1,000.00 |
400.00 |
800.00 |
510.00 |
1,020.00 |
| 735-01 |
mailboxes
|
42   |
EACH |
1.00 |
42.00 |
6.00 |
252.00 |
1.00 |
42.00 |
2.00 |
84.00 |
| 735-02 |
mailbox supports (single)
|
37   |
EACH |
100.00 |
3,700.00 |
120.00 |
4,440.00 |
100.00 |
3,700.00 |
120.00 |
4,440.00 |
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
200.00 |
200.00 |
230.00 |
230.00 |
200.00 |
200.00 |
250.00 |
250.00 |
| 739-01 |
hydro-seeding
|
3.04 |
ACRE |
1,000.00 |
3,040.00 |
2,400.00 |
7,296.00 |
1,100.00 |
3,344.00 |
1,400.00 |
4,256.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
30,000.00 |
30,000.00 |
9,000.00 |
9,000.00 |
25,000.00 |
25,000.00 |
| S-001 |
dynamic message sign unit
|
4   |
EACH |
6,000.00 |
24,000.00 |
8,000.00 |
32,000.00 |
6,000.00 |
24,000.00 |
7,500.00 |
30,000.00 |
| S-002 |
cleaning existing ditches
|
200   |
LNFT |
23.00 |
4,600.00 |
12.00 |
2,400.00 |
20.00 |
4,000.00 |
25.00 |
5,000.00 |
| S-003 |
video detector device and connection
|
4   |
EACH |
7,000.00 |
28,000.00 |
8,000.00 |
32,000.00 |
7,000.00 |
28,000.00 |
8,300.00 |
33,200.00 |
| S-004 |
video detector system (intersection)
|
1   |
EACH |
10,000.00 |
10,000.00 |
11,000.00 |
11,000.00 |
10,000.00 |
10,000.00 |
12,000.00 |
12,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,715,851.95 |
|
2,924,264.60 |
|
3,087,909.45 |
|
3,400,572.08 |
|