DBE GOAL FED
Lead Project: 018-04-0045
Parish: ST TAMMANY
Routes: US 11, LA 3081
Description: FRICKE RD. - 0.36 MI N OF LA 41 SPUR/I-59 RAMPS - JCT. 3081
Type Const: grading, cold planing asphaltic concrete, superpave asphaltic concrete pavement,
pavement patching, pavement widening, and related work.
Estimated Construction Cost: $3,019,725.53
 
RankLicenseBidderConstruction Bid
1 06487 HUEY STOCKSTILL, INC. $2,715,851.95
2 06276 BARRIERE CONSTRUCTION CO., LLC. $2,924,264.60
3 02179 BOH BROS. CONSTRUCTION CO., LLC. $3,087,909.45
4 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $3,400,572.08
 
Item Number Item Description Quantity Unit of Measure - 1 -
HUEY STOCKSTILL, INC.
- 2 -
BARRIERE CONSTRUCTION CO., LLC.
- 3 -
BOH BROS. CONSTRUCTION CO., LLC.
- 4 -
DIAMOND B CONSTRUCTION CO., L.L.C.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 208      LNFT 7.00 1,456.00 12.00 2,496.00 7.00 1,456.00 21.00 4,368.00
203-07 borrow (vehicular measurement) 978      CUYD 27.00 26,406.00 20.00 19,560.00 25.00 24,450.00 28.00 27,384.00
204-02 temporary hay or straw bales 30      EACH 15.00 450.00 9.00 270.00 15.00 450.00 19.00 570.00
204-06 temporary silt fencing 3,062      LNFT 5.00 15,310.00 2.50 7,655.00 2.00 6,124.00 2.00 6,124.00
401-02 aggregate surface course (adjusted vehicular
measurement)
1,645      CUYD 62.00 101,990.00 77.00 126,665.00 45.00 74,025.00 88.00 144,760.00
502-01 superpave asphaltic concrete 13,765.0    TON 100.00 1,376,500.00 109.00 1,500,385.00 115.00 1,582,975.00 135.00 1,858,275.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,556.5    TON 130.00 202,345.00 109.00 169,658.50 115.00 178,997.50 210.00 326,865.00
509-01 cold planing asphaltic pavement 71,355      SQYD 1.50 107,032.50 3.50 249,742.50 2.00 142,710.00 2.10 149,845.50
509-02 contractor retained reclaimed asphaltic pavement - 991      CUYD 0.00 0.00 10.00 - 9,910.00 10.00 - 9,910.00 0.10 - 99.10
510-01-B pavement patching (12" minimum thickness) 1,503      SQYD 97.00 145,791.00 80.00 120,240.00 150.00 225,450.00 131.00 196,893.00
510-02 pavement widening 1,734.2    SQYD 69.00 119,659.80 66.00 114,457.20 120.00 208,104.00 111.00 192,496.20
702-04-A adjusting manholes 4      EACH 346.00 1,384.00 500.00 2,000.00 700.00 2,800.00 450.00 1,800.00
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 337.5    LNFT 56.00 18,900.00 80.00 27,000.00 55.00 18,562.50 65.00 21,937.50
704-03 blocked out guard rail 237.5    LNFT 21.00 4,987.50 23.00 5,462.50 22.00 5,225.00 25.00 5,937.50
704-11-A guard rail end treatment (flared) 8      EACH 2,200.00 17,600.00 2,500.00 20,000.00 2,300.00 18,400.00 2,800.00 22,400.00
706-02 concrete drive (6" thick) 155.6    SQYD 50.00 7,780.00 85.00 13,226.00 85.00 13,226.00 62.00 9,647.20
707-03 combination concrete curb & gutter 2,450.0    LNFT 16.00 39,200.00 25.00 61,250.00 35.00 85,750.00 20.00 49,000.00
713-01 temporary signs & barricades lump      LUMP 100,000.00 100,000.00 140,000.00 140,000.00 75,000.00 75,000.00 25,000.00 25,000.00
713-02-A temporary pavement markings (4" width) 1,260      LNFT 0.15 189.00 0.15 189.00 0.15 189.00 0.20 252.00
713-02-C temporary pavement markings (8" width) 1,953      LNFT 0.25 488.25 0.25 488.25 0.25 488.25 0.35 683.55
713-02-E temporary pavement markings (24" width) 1,575      LNFT 0.75 1,181.25 0.75 1,181.25 0.75 1,181.25 1.00 1,575.00
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
15.030  MILE 160.00 2,404.80 180.00 2,705.40 20.00 300.60 161.00 2,419.83
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
5.760  MILE 300.00 1,728.00 20.00 115.20 10.00 57.60 350.00 2,016.00
713-04-A temporary pavement markings (solid line)(4" width) 40.470  MILE 450.00 18,211.50 40.00 1,618.80 25.00 1,011.75 540.00 21,853.80
713-05-A temporary pavement legends and symbols (arrow) 15      EACH 50.00 750.00 50.00 750.00 10.00 150.00 64.00 960.00
713-05-C temporary pavement legends and symbols (only) 6      EACH 50.00 300.00 50.00 300.00 10.00 60.00 64.00 384.00
713-05-D temporary pavement legends and symbols (rr crossing) 6      EACH 100.00 600.00 100.00 600.00 10.00 60.00 127.00 762.00
727-01 mobilization lump      LUMP 270,000.00 270,000.00 170,000.00 170,000.00 300,000.00 300,000.00 150,000.00 150,000.00
729-16-C object marker assembly (type 3) 36      EACH 75.00 2,700.00 90.00 3,240.00 75.00 2,700.00 94.00 3,384.00
729-19-A dead end road installations(type a) 1      EACH 1,500.00 1,500.00 1,600.00 1,600.00 1,500.00 1,500.00 2,000.00 2,000.00
731-02 reflectorized raised pavement markers 865      EACH 5.00 4,325.00 5.40 4,671.00 5.00 4,325.00 7.00 6,055.00
732-01-A plastic pavement striping (4" width) 420      LNFT 0.45 189.00 1.00 420.00 0.50 210.00 0.55 231.00
732-01-C plastic pavement striping (8" width) 651      LNFT 0.85 553.35 2.00 1,302.00 1.00 651.00 1.10 716.10
732-01-E plastic pavement striping (24" width) 525      LNFT 3.20 1,680.00 6.00 3,150.00 3.00 1,575.00 4.00 2,100.00
732-02-A plastic pavement striping (solid line) (4" width) 13.490  MILE 2,600.00 35,074.00 2,800.00 37,772.00 2,500.00 33,725.00 3,200.00 43,168.00
732-03-A plastic pavement striping (broken line)(4" width) 1.920  MILE 700.00 1,344.00 800.00 1,536.00 700.00 1,344.00 900.00 1,728.00
732-04-A plastic pavement legends & symbols (arrow) 5      EACH 200.00 1,000.00 250.00 1,250.00 200.00 1,000.00 250.00 1,250.00
732-04-C plastic pavement legends & symbols (only) 2      EACH 230.00 460.00 300.00 600.00 250.00 500.00 290.00 580.00
732-04-D plastic pavement legends & symbols (rr crossing) 2      EACH 400.00 800.00 500.00 1,000.00 400.00 800.00 510.00 1,020.00
735-01 mailboxes 42      EACH 1.00 42.00 6.00 252.00 1.00 42.00 2.00 84.00
735-02 mailbox supports (single) 37      EACH 100.00 3,700.00 120.00 4,440.00 100.00 3,700.00 120.00 4,440.00
735-04 mailbox supports (multiple) 1      EACH 200.00 200.00 230.00 230.00 200.00 200.00 250.00 250.00
739-01 hydro-seeding 3.04   ACRE 1,000.00 3,040.00 2,400.00 7,296.00 1,100.00 3,344.00 1,400.00 4,256.00
740-01 construction layout lump      LUMP 10,000.00 10,000.00 30,000.00 30,000.00 9,000.00 9,000.00 25,000.00 25,000.00
S-001 dynamic message sign unit 4      EACH 6,000.00 24,000.00 8,000.00 32,000.00 6,000.00 24,000.00 7,500.00 30,000.00
S-002 cleaning existing ditches 200      LNFT 23.00 4,600.00 12.00 2,400.00 20.00 4,000.00 25.00 5,000.00
S-003 video detector device and connection 4      EACH 7,000.00 28,000.00 8,000.00 32,000.00 7,000.00 28,000.00 8,300.00 33,200.00
S-004 video detector system (intersection) 1      EACH 10,000.00 10,000.00 11,000.00 11,000.00 10,000.00 10,000.00 12,000.00 12,000.00
                       
 CONTRACTOR TOTAL       2,715,851.95   2,924,264.60   3,087,909.45   3,400,572.08